Unified Construction Portal

A concept for an integrated digital system for the construction industry and the implementation of Russian Government Order No. 398-р.

Materials for the article "Single construction portal"
The first page of the presentation from the package of primary materials.

Brief annotation

About the document

A concept for an integrated digital system for the construction industry and the implementation of Russian Government Order No. 398-р.

Presentation

Ediny_stroitelny_portal_Prezentatsiya.pptx

Page — from —
Width

Downloading the document...

For viewing prepared PDF-copy of the presentation. PowerPoint animations and transitions are not played.

Scroll through the pages and change the scale on the viewbar.

One object - a single digital passport - a managed life cycle

Purpose: Inter-agency coordination, piloting and federal scaling

Addressees: Government of the Russian Federation, Ministry of Construction of Russia, regions, development institutions and construction industry

Initiator: Sokolov Sergey Leonidovich

Ecosystem: EQUILIBRIUM — SFERA — ECO-PPA — SPECZASHCHITA

Version: 1.0 / 25 August 2026

Moscow • 2026

NAVIGATION

Contents

1. Executive summary

2. Background and objective

3. Target model and principles

4. Users and the life cycle of the object

5. Nineteen functional modules

6. Place of the portal in the state digital architecture

7. Unified data model and digital passport

8. Cross-cutting process and control gate

9. Analytics, artificial intelligence and digital twin

10. Governance, security and legal framework

11. Economic model, KPI and effects

12. MVP, pilot and road map

13. Risks and solutions required to start

Applications: integrations, roles, terms and sources

Status. The document is a draft concept. It does not replace normative legal acts and does not change the powers of the existing state information systems. All legally significant decisions are left to the authorized bodies and persons.

MAIN CONCLUSION

1. Executive summary

Proposal. Create a Unified Construction Portal as a trusted integration and transaction layer around a capital construction object: with a single identifier, digital passport, event history, control gate, measurable result and archive of evidence.

The portal should not duplicate the Unified Information System "Stroykompleks.RF", GISOGD, NSPD, EGRP, FGIS CA, EIJS, EIS in the field of procurement, EGRN, public services and other operating systems. Each of them retains its own powers and status as a source of legally significant information. The portal connects their data and actions into a single life cycle of a particular object.

The goal is to move from fragmented document sharing to result management: timing, cost, quality, safety, resource availability, impact on the territory, and operational readiness become visible before critical deviation occurs.

The architecture is based on the principle of "one data - multiple legitimate use". The user logs in through the ESIA, creates or receives a digital passport of the object, and the information is loaded from trusted sources by API and through an event exchange. Repeated manual input is allowed only as an exception with the indication of the reason.

In the project ecosystem SFERA Gathers needs and participants; ECO-PPA forms a programmatic, resource and contractual framework; SPECZASHCHITA organizes cooperation and implementation; EQUILIBRIUM performs monitoring, forecasting and verification of the result; IAC provides decision support and work with deviations. A single construction portal becomes an industry point of assembly of these functions and state services.

  1. Approve the concept of the portal and the interdepartmental working group.
  2. In 30 days, conduct an inventory of processes, registers and integrations without creating parallel databases.
  3. For 90 days start MVP on three types of objects: housing, social infrastructure, industrial and infrastructure object.
  4. Adopt a single standard for the digital passport of the object and the event log.
  5. Secure pilot KPI, independent verification and scaling order.

2. Background and objective

2.1. Fragmentation does not occur due to the lack of systems

The construction already has a developed set of federal, regional, departmental and corporate information systems. The problem arises at the junctions: the same object has different identifiers, versions of documents, compositions of participants, cost models and statuses in different contours.

  • The life cycle gap. Land solution, design, expertise, procurement, construction, commissioning and operation are carried out as a sequence of individual cases, and not as a single object of management.
  • Liability gap. The transfer of documents between participants does not always mean the transfer of measurable responsibility for the result.
  • Data breach. Information is re-entered, diverged by version and do not always have a confirmed source and a temporary label.
  • Later detection of risk. Deviation becomes apparent after the loss of time or money, rather than at the stage of scenario analysis.
  • Weak feedback. Operational defects and actual performance rarely return to the design, rationing and selection of contractors.

The criterion of success. The portal should reduce the number of gaps between participants and systems, and not increase the number of cabinets, forms and reports.

2.2. The state framework is already forming a digital vertical

The key elements of the digital vertical of the construction industry already exist: EIS "Stroykompleks.RF" and registers of requirements and documents, regional GISOGD, project management information systems, GIS TOR KND, EGRZ, FGIS CA, EISJS, NSPD and electronic public services. V 2026 the Government of the Russian Federation approved the updated strategic direction of digital transformation of construction and housing 2030 years.

Therefore, the architectural solution should be federal: retain the powers of data owners, use open integration contracts, provide end-to-end identification of the object and give a single user path on top of existing sources.

3. Target model and principles

3.1. What is a portal

A single construction portal is a state digital ecosystem that combines services, data, participants, contracts, resources, control and analytics around the full life cycle of a capital construction facility.

3.2. Ten Principles

Formula. Unique object identifier + digital passport + Reliable sources + Event Log + Check gate + Explainable Analytics + archive of evidence.

  1. The object, not the departmental form, is the central unit of management.
  2. Existing state systems remain sources of legally significant information.
  3. Data is entered once and reused within the legal regime.
  4. Each version, decision, event, and source is stored in the audited history.
  5. A person makes a legally and socially significant decision; the algorithm explains the factors and consequences.
  6. Access is provided by role, purpose, authority, and minimum amount of data required.
  7. Interfaces are built around the life situations of a citizen, business, customer and authority.
  8. Regional variability is maintained without destroying the federal core of data and standards.
  9. Open API, single classifiers and data exports prevent dependence on a single supplier.
  10. The result is measured by the fact of input, quality and operation, and not by the number of downloaded documents.

3.3. What the portal does not do

  • does not create a parallel vertical of public administration;
  • does not cancel existing procedures, powers and registers without a separate regulatory decision;
  • does not replace an expert, inspector, customer, designer or registration authority;
  • does not store redundant copies of data if a reliable primary source is available;
  • It does not allow for an opaque automatic refusal, rating or sanction.

4. Users and the life cycle of the object

4.1. Custom Outlines

UserThe main way in the portal
Citizen / CommunityThe need for territory, public discussion, access to open statuses and results
Investor / DeveloperInitiative, land scenario, permits, financing, sales and input
CustomerPlanning, budget, procurement, contract, acceptance and change management
Designer / ExpertRequirements, TIM, versions of project documentation, comments and conclusions
Contractor / SupplierQualification, capacity, schedule, materials, logistics, acts and quality
Authority/SupervisionServices, coordination, control, risk indicators, interagency interaction
Operating organizationDigital passport, regulations, maintenance, repairs, accident and feedback
Financial / insurance partnerRisks, tranches, guarantees, insurance events and confirmation of the result

4.2. Ten stages of the end-to-end life cycle

  1. Need and initiative: substantiation of social, infrastructure or investment needs.
  2. Territory and land: spatial constraints, rights, urban planning potential and engineering support.
  3. Investment model: scenarios of cost, financing, income, risk and societal impact.
  4. Design: task, research, TIM, requirements, versions and coordination of solutions.
  5. Examination and permissions: conclusions, comments, authorization actions and completeness control.
  6. Procurement and contracting: selection of performers, contract model, schedule, security and liability.
  7. Construction and supply: works, resources, logistics, executive documentation and changes.
  8. Control and commissioning: construction supervision, acceptance, registration of rights and commissioning.
  9. Operation and repair: maintenance, repairs, resource consumption and safety.
  10. Renovation or withdrawal: reconstruction, dismantling, reuse of materials and restoration of the territory.

5. Nineteen functional modules

Modules are combined with a single passport of the object and can be implemented in stages. MVP runs the minimum set, and the rest are connected through coordinated interfaces and single classifiers.

№ModuleKey ServicePrimary ligament
1Initiatives and needsCollection, prioritization and socio-territorial justificationSFERA
2Land and territorySpatial data, restrictions, zones, rights, sitesNSPD / GISOGD / EGRN
3Digital object passportUnified ID, target, parameters, statuses, versions, communications and proofsPortal Core
4Participants and competenciesProfiles of organizations, tolerances, capacities, experience, responsibilityPortal / external registers
5Requirements and standardsApplicable rules, specifications, requirements registerConstruction complex.RF / EUT
6Research, design and TIMTasks, models, collisions, versions, common data environmentProject IP / ISUP
7ExpertiseSubmission, comments, conclusions, model decisions and historyEGRZ / ECPE
8Permits and servicesLife situations, statements, interagency exchange, resultPublic services / GISOGD
9Cost and resourcesEstimates, indices, prices, standards, need for materialsFGIS CS
10Financing and ECO-PPAFinancial model, tranches, guarantees, insurance, risk distributionECO-PPA

5.1. Modules 11–19: execution, operation and forecast

№ModuleKey ServicePrimary ligament
11Procurement and contractsPlanning, procedures, contracts, obligations, changesEIS Procurement / EDO
12Cooperation and capacitiesConsortiums, production loading, labour and subcontractingSPECZASHCHITA
13Materials and logisticsOrigin, certificates, shipments, routes, warehouses and deliveriesSuppliers / transport IP
14Construction managementCalendar, actual progress, executive documentationISUP / IS Contractor
15Control, quality and safetyRisk-oriented supervision, defects, labor protection, eliminationGIS TOR KND / supervision
16Input and registrationReadiness, permission to enter, technical plan, rightsPublic services / Rosreestr
17Operation and repairsRegulations, applications, service, status and consumptionGIS Housing and Utilities / Operational
18Impact and verificationEnvironmental and social indicators, ESG-IR 1.0, archive of evidenceECO-PPA / independent bodies
19Analytics and ForecastingDigital twin, scenarios, early warning, result controlEQUILIBRIUM / IAC

6. Place of the portal in the state digital architecture

6.1. The Federation of Systems

The portal provides user and process integrity, but does not assign data, authority and legal status to the systems involved. For each field of the digital passport, the source, owner, basis of access, time of receipt, version and acceptable method of use are fixed.

System / OutlineWhat is the source of truth?Role of Portal
ESIA / Public services / MFCIdentification, power of attorney, submission and result of the serviceSingle entrance and life situation
UIS "Stroycomplex.RF"Federal information on urban development, registers of requirements and documentsSync applicable requirements and statuses
Regional GISOGDRegional town planning information and servicesProcess exchange by object and territory
NSPD / EGRNSpatial data, sites, rights and restrictionsObject map and verification of spatial conditions
EGRZ / ECPEExpertise findings and related documentation setsControl of the examination gate and reuse of solutions
FGIS CSEstimated standards, indices, prices and resource classifiersCost justification and deviation monitoring
EWISSInformation about housing construction and developersHousing Outline, Disclosure and Analytics
Procurement EISPlans, procedures, contracts and procurement performanceRelationship of the purchase with the passport and the schedule of the object

6.1.1. Operational and financial contours

System / OutlineWhat is the source of truth?Role of Portal
GIS TOR KND / IS SupervisionControl actions, risk categories, requirementsRisk-based control and elimination
IPMS and project IPSchedules, TIM, Tasks, Actual Progress and DocumentsOperational management and event exchange
GIS Housing and Utilities / OperationalOperation, condition, applications and repairsDigital passport transfer and feedback
Financial and insurance IPPayments, tranches, guarantees, limits and eventsConfirmation of financing conditions and risk

The architectural ban. You can not transfer all the registers to the portal. Integration is based on the principles of primary source reference, minimum necessary replication, caching with the version and confirmed relevance.

6.2. Role of the project ecosystem

ComponentFunctionResult
SFERAInput needs, initiatives, communities and participantsInitiative and public value
ECO-PPAProgramme, resource, contractual and financial frameworkBalanced project and risk model
SPECZASHCHITAProduction cooperation, consortia and executionMobilization of capacities and delivery of results
EQUILIBRIUMObservation, forecasting, scenarios and early warningExplainable signals and control of the result
IACDecision support, prioritization and deflection managementHuman decision on the basis of evidence
EUTUniform classifiers, protocols and technological rulesCompatibility and repeatability
Unified Construction PortalSingle user and object path, integration and event logIndustry Assemblage Point

7. Unified data model and digital passport

7.1. Data Units

EntityContentsPurpose
ObjectIDInvariant identifier of an object or complexConnects information of all stages
TerritoryIDPlot, zone, territory or linear corridorRelation to Spatial Restrictions
PartyIDOrganization, authority, expert or responsible personRole, authority and responsibility
RequirementIDNorm, technical condition, obligationApplicability and proof of compliance
DocumentIDDocument or information model with versionSource, signature, status and communication

7.1.1. Transactional and Eventual Entities

EntityContentsPurpose
ContractIDContract, contract, tranche or guaranteeCommitment, time, cost and event
ResourceIDMaterial, equipment, labor, power or energyOrigin, quantity and supply
EventIDChange of object statusTime, initiator, foundation, old and new state
EvidenceIDConfirmation of the result or elimination of riskIndependent verification and archive
MetricIDCost, time, quality, impactBasic, planned and actual value

7.2. Mandatory properties of a digital passport

  • Unchangeable connection with primary sources and versions;
  • a single time scale of decisions, approvals, works, deliveries and payments;
  • planned, actual and forecast values of indicators;
  • communication of each decision with authority, document and evidence;
  • machine-readable status of the control gate;
  • rights of access by roles, purposes and classification of information;
  • archive of transfer to operation and subsequent feedback.

The rule of trust. In the interface, the user always sees: where the value is obtained, when it is updated, by whom it is confirmed and what solution depends on its reliability.

8. Cross-cutting process and control gate

The control gate is not an additional coordination, but a machine-readable check of readiness for the next stage. The gates aggregate existing solutions and show missing conditions, responsibility and consequences of the transition.

GateDecisionMinimum amount of evidence
G0Need confirmedPurpose, beneficiaries, territorial need, owner of the initiative
G1Territory AllowedRights, restrictions, urban planning potential, engineering conditions
G2The investment model is sustainableLife cycle cost, financing, risks, scenarios
G3The project is ready for examinationCompleteness, TIM, applicable requirements, conflicts and signatures

8.0.1. Gate G4 - G8: implementation and operation

GateDecisionMinimum amount of evidence
G4Examination and permits obtainedPositive conclusion, corrected comments, permits
G5Contract and resources securedProcurement, contractor, capacities, materials, schedule, warranties
G6Construction is managedFact of work, quality, safety, deviations and corrective actions
G7Object ready to enterCompleteness, testing, executive model, defect elimination
G8Operational results confirmedTransfer of passport, actual indicators, guarantee obligations

8.1. Change management

Any material change in value, duration, design, composition or impact is recorded as an event. The portal calculates the affected requirements, documents, contracts, indicators and control gates, but does not approve the change independently.

  1. the initiator describes the cause and expected effect;
  2. analytics shows the affected connections and scenarios;
  3. authorized persons make a decision and sign it;
  4. the new version becomes valid, the previous one is retained;
  5. The event is sent to all connected systems under agreed contracts.

9. Analytics, artificial intelligence and digital twin

9.1. Functions of the intellectual core

  • Early warning. Identification of the risk of schedule failure, cost increase, resource shortage, defect or security breach.
  • Scenario analysis. Comparison of options for territory, project solution, supply, schedule and financing.
  • Conformity check. Search for discrepancies between passport, TIM, estimate, contracts, schedule and fact.
  • Extracting requirements. Linking norms and conditions to project elements and evidence of implementation.
  • Re-use of knowledge. Search for analogues, standard solutions, causes of deviations and operational feedback.
  • The digital double. Combining spatial, technical, financial, event and operational model of the object.

9.2. Use restrictions AI

  • no opaque automatic denial of service, purchase, admission or financing;
  • mandatory indication of sources, factors, level of confidence and alternatives;
  • Separation of testable rules, statistical models and generative clues;
  • logging requests, model versions and the result that influenced the decision;
  • the right of the user to challenge the signal and transfer the question to the person;
  • regular quality, displacement, safety and applicability of models.

Principle EQUILIBRIUM warns and explains; the authorized person decides and is responsible.

10. Governance, security and legal framework

10.1. Organizational model

LevelCredentials
Interagency CouncilGoals, priorities, authority boundaries, pilots and scaling
Federal CoordinatorPolicy, regulatory support and interaction of system owners
Portal operatorOperation, development, SLA, integration, support and cybersecurity
Data OwnersQuality, legal regime, interfaces, versions and correction of primary data
Regional centresLocal processes, integrations, training and user support
Scientific and Technical CouncilArchitecture, TIM, AI, data standards and technological independence
Independent verificationValidation of the result, KPI, impact, safety and reliability of evidence

10.2. Safety and sustainability

  • Sovereign architecture. Placement and processing in accordance with the data category, Russian requirements and the plan of technological independence.
  • Zero trust. Verify the user, device, role, context and minimum required authority.
  • Segmentation. Separation of open, service, commercial, personal and critical contours.
  • Unchanged audit. Access, modification, signature, source, and solution with undetectable deletion protection.
  • Sustainability. Backup, recovery, autonomous operation of critical processes and regular exercises.
  • Safe development. Threat modeling, dependency analysis, testing, vulnerability management and software supply chain.

10.3. Legal perimeter of the stage 0

Prior to the pilot, a legal card is executed: the status of the operator, the grounds for data exchange, the composition of the digital passport, electronic signature and power of attorney, personal and commercial data, the mode of information models, procurement, control, archival storage, responsibility for the quality and order of challenging analytical signals.

The initial regulatory perimeter includes the Town Planning Code of the Russian Federation, legislation on information and data protection, electronic signature, public services, contract system, procurement of certain types of legal entities, shared construction, technical security of buildings and structures, critical information infrastructure and archival business. Current editions and applicability are confirmed by the legal working group before launch.

Normative approach. First, ensure compatibility and legal traceability within the existing powers; only then propose point changes in legislation following the results of the pilot.

11. Economic model, KPI and effects

11.1. Principles of funding

  • Basic public services and mandatory functions are financed as a public digital infrastructure.
  • Integration of the existing state systems is included in the agreed departmental development plans;
  • Pilots can be funded through federal and regional programs, development institutions, and project agreements.
  • Extended B2B-services are allowed only in a separate legal and tariff circuit without limiting access to public functions;
  • ECO-PPA is used as a mechanism to reconcile resources, risks, liabilities and measurable impact of a project, rather than as a substitute for budgetary and procurement rules.

11.2. System of indicators

ContourMetricsPilot Orientation
Object passportProportion of pilot facilities with full passport100%
ReuseProportion of fields obtained from trusted sources without manual inputnot less than 70%
TraceabilityPercentage of significant events and decisions with source and evidencenot less than 90%
Complete gatePercentage of transitions without subsequent return due to missing informationGrowth to the base line
Term of coordinationTime of inter-system and inter-agency coordinationreduction of at least 20%
Rejection of the deadlineThe difference between planned and projected completionEarly Detection to Critical Path
Denial of valueUnjustified change in value relative to the approved baseDecrease to base line
QualityDefects, rework and elimination time frameDecrease to base line
SecurityCritical violations and reaction timeZero tolerance/reduced response
SuppliesProportion of critical resources with proven proven provenance and status100% in the pilot list
Operational readinessComplete transfer of passport, regulations and guarantees100%
User experienceEvaluating key user pathsnot lower than 4,2 of 5

Once the baselines are established, the core KPI expands to an industry-wide register of indicators compatible with ESG-IR 1.0 and a system of 260 human and territory development indicators. The indicators are grouped into 19 modules, life stages and decision-making levels.

11.3. Expected effects

  • For the state. Tracked execution, project comparability, early identification of systemic risks and less duplicative reporting.
  • for regions. A single set of integrations and services while maintaining regional specifics and data.
  • For business. Predictable project path, re-use of information, transparent requirements, access to cooperation and resources.
  • For citizens. Clear status, participation in the formation of the need, access to results and feedback.
  • For the industry. Accumulation of knowledge of the full life cycle, improving the quality of solutions and the development of domestic technologies.

12. MVP, pilot and road map

12.1. Composition MVP

MVP confirms the architecture on real processes and does not try to cover all 19 modules at once. The minimum product includes:

  • single input via ESIA and role model;
  • digital passport and ObjectID;
  • spatial map of the territory;
  • Journal of events, versions, decisions and evidence;
  • five key integrations: Public Services, Construction Complex.RF/GISOGD, NSPD/EGRN, EGRZ, FGIS CS;
  • G0-G4 and prototype G5-G8;
  • basic dashboards of time, cost, completeness and risk;
  • Verification archive and feedback mechanism.

12.2. Plan for the first 90 days

PeriodFocusResult
Days 1–15Mandate and boundariesWorking group, map of authority, process owners, pilot selection
Days 16–30ArchitectureDigital passport v0.1, data card, integration contracts, threat model
Days 31–60PrototypeSingle entrance, passport, event log, object map, first integrations and gates
Days 61–75TestUser scenarios, load, security, data quality, training
Days 76–90PilotThree objects, baseline measurement, independent verification and phase solution 2

12.3. Pilot types of objects

ContourWhat we checkRecommended scale
HousingCheck the bundle of land, EITI, permits, financing, construction and inputOne complex residential development object
Social infrastructureCheck budget, purchase, standard solution, control and commissioningSchool, polyclinic or sports facility
Industrial and infrastructure facilityCheck cooperation, materials, logistics, security and ECO-PPACandidate: Syzran-Rameno-Smolkino cluster, after a separate decision

12.4. Road map 2026–2030

PeriodStageKey result
2026Design and PilotPassport standard, MVP, three types of objects, assessment of legal and technological gaps
2027Regional replicationConnection of selected subjects, typical integrations, training and service model
2028Federal ScalabilityExtension of modules, life situations, industry registries and independent verification
2029Economics of CooperationResource balances, production capacities, logistics, insurance and life cycle services
2030Predictive managementDigital twins of territories, early warning and feedback in norms and programs

13. Risks and solutions required to start

13.1. Register of key risks

RiskManifestationManagement
Duplication of systemsCreating another base and cabinetInventory, architectural ban on unreasonable replication
Blurring of powersIt is unclear who is taking and responding.Matrix of decisions, sources of truth and legal grounds
Poor data qualityDisagreements block the process or distort the analyticsField owner, quality control, correction procedure in the primary source
Resistance of participantsAdditional load and system bypassReducing manual input, joint path design, training
Dependence on supplierClosed formats and high cost of changesOpen API, export, modularity, state ownership of key specifications
CyberattackViolation of accessibility, integrity or confidentialitySegmentation, zero trust, reservation, constant monitoring
Invalid signal AIAn incorrect recommendation affects the decisionThe person in the outline, explanatory, testing, logging, right of challenge
Regional gapInequality of actorsTypical cloud core, adapters, connection funding and competence center
Unsustainable financingStopping after the pilotFull cost of ownership plan and permanent operator decision up to phase 2
Unproven effectScaling without resultsBaseline, pilot KPI and independent verification

13.2. Seven solutions to launch

  1. To approve the Unified Construction Portal as an integration layer of the object’s life cycle, and not a replacement for existing systems.
  2. Identify a federal coordinator and form an interdepartmental council with the participation of owners of key systems.
  3. In 30 days, you will be tasked with mapping processes, data, authorities and integrations.
  4. Approve the standard of digital passport v0.1, ObjectID and event log for pilot.
  5. Choose three pilot objects and fix the owners of the result, base lines and KPI.
  6. Define operator MVP, safety model and budget of the total cost of the pilot.
  7. After 90 days, consider the independent report and decide on regional replication.

Bottom line. A single construction portal should make the object manageable through departments, organizations and stages - without destroying the current digital vertical and without transferring responsibility to the algorithm.

ANNEX A

The responsibility matrix on the pilot

Solution / ProcessWho claimsWho performsWho is attracted
Goals and PilotsInteragency CouncilFederal CoordinatorRegions, customers, industry
Passport StandardFederal CoordinatorThe Architectural CouncilSystem owners, operator
IntegrationsOwners of systemsPortal operatorRegional IT teams
Data qualityPrimary Source OwnerQuality Control OperatorUsers and Audit
Pilot processOwner of the objectProject OfficeAll participants in the life cycle
Analytical signalsAuthorized personEQUILIBRIUM / IACExperts and Data Owners
SecurityOperator and system ownerthe Center of Information SecurityConnected participants
Effect evaluationInteragency CouncilIndependent VerifierProject office and users

ANNEX B

Minimum requirements for the integration contract

  1. the owner and legal basis for the provision of data;
  2. composition, semantics, classifiers and permissible values;
  3. identifiers of the object, territory, participant and document;
  4. Receiving mode: request, event, package or reference;
  5. version, time of relevance and cancellation procedure;
  6. requirements for electronic signature and power of attorney;
  7. SLA, error handling, re-delivery and reconciliation;
  8. data category, access log, storage and deletion;
  9. responsibility for quality and correction procedure;
  10. conditions for testing, monitoring and changing the interface.

Annex B

Short dictionary

TermDefinition
Archive of evidenceA related set of signed documents, events, measurements, and conclusions that confirm the decision or result.
Check gateComputer-readable verification of the readiness of the object for the next stage on the basis of existing decisions and evidence.
ObjectIDAn immutable object identifier that links records of different systems and stages.
Event MagazineChronology of changes in the state of the object with the source, time, initiator and basis.
The Source of TruthA system or registry that is legally or organizationally mandated to maintain specific information.
Digital passportCross-cutting representation of the object: identifiers, statuses, participants, documents, models, events, metrics and evidence.
Digital twinA related model of the current and forecast state of an object or territory for scenario analysis.
ECO-PPAProject mechanism for harmonizing resources, commitments, risks and measurable environmental, social and economic outcomes.

Annex G

Official sources and points of integration

  • The Russian government has updated the strategic direction of digital transformation of construction and housing and utilities until 2030
  • UIS "Stroycomplex.RF"
  • FGIS EDS NSPD — Rosreestr
  • NSPD portal
  • Unified State Register of Conclusions — Glavgosexpertiza of Russia
  • FGIS CS - Minstroy Russia
  • Unified housing information system
  • Unified information system in procurement
  • Public services - issuing a building permit
  • Glavgosexpertiza of Russia — digital vertical of the construction industry

Sources are used to determine the current digital perimeter. The specific composition of integrations, legal grounds and current versions of normative acts are subject to confirmation at the stage 0.

Source materials

Originals and versions of the document

  • Ediny_stroitelny_portal_Kontseptsiya.docxDOCX · main document
  • Ediny_stroitelny_portal_Prezentatsiya.pptxPPTX · related version
  • Единый_строительный_портал_архитектура_398-р.docxDOCX · related version
  • Единый_строительный_портал_398-р_презентация.pptxPPTX · related version

Other editions in web format

Each version is disclosed separately; the sequence of the source document is saved.

SINGLE CONSTRUCTION PORTALEdiny_stroitelny_portal_Prezentatsiya.pptx · web text

State digital ecosystem of full life cycle management of capital construction objects

One object - a single digital passport - a managed life cycle

Initiator: Sokolov Sergey Leonidovich • Moscow • 2026

Version 1.0

DOES NOT DOUBLE

MAIN THESIS

Not another portal.

COMMUNICATE

existing GIS, registers,

services and powers

object, data, solutions,

Responsibility and result

Construction complex.RF • GISOGD • NSPD / EGRN • EGRZ

FGIS CS • EWISS • Procurement EIS • Public services • ICUP

A portal is a trusted integration and transaction layer around an object.

SINGLE CONSTRUCTION PORTAL

One object - seven breaks

EASTERN SITUATION

Gaps make the project

a Set of Unrelated Windows

ID

Object

Versions

Roles

Data

Risks

Reverse

Communication

Result

Risk becomes visible after losing time and money — instead of an early scenario warning.

SINGLE CONSTRUCTION PORTAL

Target model: one ID and passport

ARCHITECTURE

The object becomes the central unit of management - not a departmental form.

DURATION

COSTS

Plan • fact • forecast

Base • change • cause

ObjectID

DIGITAL PASSPORT

Events • Version • Sources • Evidence

QUALITY

SAFETY

Defect • Elimination • Proof

Risk • reaction • liability

Source → version → power → solution → proof

SINGLE CONSTRUCTION PORTAL

Object life cycle: 10 stages

PROCESS

Need

Land and territory

Investment Model

Design

Expertise

and permissions

Procurement

and contract

Construction and supply

Monitoring

and input

Operation and repair

Renovation / Conclusion

At each stage, a measurable result and an archive of evidence.

SINGLE CONSTRUCTION PORTAL

19 modules — four functional layers

FUNCTIONAL MODEL

6–10

11–16

17–19

ZAMYSEL

AND TERRITORY

PROJECT

AND AUTHORIZATION

EXECUTION

EXPLOITATION

AND KNOWLEDGE

Initiatives

Land and territory

Digital passport

Participants

Requirements

TIM and research

Expertise

Permits and services

Cost

Financing

Procurement

Cooperation

Materials and logistics

Construction management

Monitoring

Input

Operation and repair

Impact and verification

Analytics and Forecasting

SINGLE CONSTRUCTION PORTAL

Ecosystem roles without parallel vertical

RESPONSIBILITY

Each component is responsible for its own measurable result.

SFERA

ECO-PPA

Requirements • initiatives • participants

Program • resources • contract • risk

SINGLE

PORTAL

ObjectID

passport • events

SPECZASHCHITA

EQUILIBRIUM

Cooperation • execution • delivery

Observation • forecast • verification

IAC - Decision Support

A person affirms and bears responsibility

SINGLE CONSTRUCTION PORTAL

The portal connects, but does not replace

STATE ARCHITECTURE

EXISTING

SYSTEMS

The Source of Truth

LAST

THE SINGLE WAY

ESIA / Public Services

Construction complex.RF

Regional GISOGD

NSPD / EGRN

EGRZ / ECPE

FGIS CS

EITI / EITI Procurement

ICUP / supervision / housing and communal services

the Registry Owner

• Outdoor API

• event exchange

• link to primary source

• minimum replication

• version and time of relevance

ObjectID

Digital passport

Event Magazine

Check gate

Archive of evidence

SINGLE CONSTRUCTION PORTAL

Digital passport: a single data model

TRUST IN DATA

ObjectID + TerritoryID

object, complex, site, zone or linear corridor

PartyID

Role, authority and responsibility of the participant

RequirementID + DocumentID

requirement, applicability, version, signature and source

ContractID + ResourceID

commitment, term, cost, material and delivery

EventID + EvidenceID

change, initiator, basis and confirmation

MetricID

base • planned • actual • forecast value

User always sees: source • time • version • confirmation • dependent solution

SINGLE CONSTRUCTION PORTAL

Check gate G0-G8

TRANSITION MANAGEMENT

Not a new agreement, but a machine-readable check of readiness for the next stage.

Need

Verified

Territory

Permissible

Model

Stable

Project is ready

the Expertise

Expertise

and permissions

Contract

and resources

Stroyka

Managed

Readiness

to enter

Result

Verified

The portal shows the missing conditions; the decision is made by the authorized person.

SINGLE CONSTRUCTION PORTAL

WARNING. COMPARISON. Explains.

AI AND DIGITAL DOUBLE

Analytics explains - a person decides

Early warning

term • cost • resources • quality • safety

Scenario analysis

Territory • Project • Supply • Schedule • Financing

Conformity check

passport • TIM • estimate • contract • fact

Extraction of claims

norm → project element → proof

Re-use of knowledge

analogs • causes of deviations • feedback

0 opaque automatic refusals, sanctions or ratings

SINGLE CONSTRUCTION PORTAL

Trust, security, independent verification

CONTOUR OF MANAGEMENT

SAFETY

LEGAL

TRAVELING

INDEPENDENT

VERIFICATION

Sovereign architecture

Zero trust

Segmentation of contours

Unchanged audit

Reservations

Safe development

Source and owner

Reason for access

Electronic signature

Version of the solution

Right of challenge

Archive of evidence

Base Line

Pilots KPI

Verification of the result

Impact check

Security Check

Decision on scale

Signal AI is disputed. The decision is signed by the person and is responsible.

SINGLE CONSTRUCTION PORTAL

MVP for 90 days

STARTING

DAYS 1–15

DAYS 16–30

DAYS 31–60

DAYS 61–75

DAYS 76–90

Mandate

and borders

Architecture

Prototype

Test

Pilot

MVP = 8 Mandatory elements

1 Single entrance and roles

2 ObjectID and digital passport

3 Spatial card

4 Event and Version Log

5 Five Key Integrations

6 Gate G0–G4 + Prototype G5–G8

7 Dashboards of time, cost and risk

8 Verification archive and feedback

Three real objects • base line • independent report • phase decision 2

SINGLE CONSTRUCTION PORTAL

Pilot and scaling 2026–2030

ROAD MAP

THREE TYPES OF PILOT OBJECTS

MASSHTAB

2026

Passport Standard • MVP • Pilot

HOUSING

Land • USGS • Resolution • Financing • Input

2027

Regional replication

SOCIAL INFRASTRUCTURE

2028

Extension of modules and registries

budget • procurement • standard solution • operation

2029

Economics of cooperation and resources

INDUSTRIAL-INFRASTRUCTURE

cooperation • logistics • security • ECO-PPA

Predictive management and feedback

Candidate: Syzran-Rameno-Smolkino (separate decision)

Scaling - only after the confirmed effect.

SINGLE CONSTRUCTION PORTAL

Seven solutions to launch

SUBJECT OF AGREEMENT

Approve the portal as the integration layer of the object life cycle.

Select three pilot objects and the owners of the result.

Identify a federal coordinator and an interagency council.

Determine operator MVP, safety and full pilot budget.

In 30 days, prepare a map of processes, data and authorities.

In 90 days to decide on regional replication.

Approve passport v0.1, ObjectID and event log.

To make the object manageable through departments, organizations and stages - without destroying the current digital vertical and without transferring responsibility to the algorithm.

SINGLE CONSTRUCTION PORTAL

Sources indicated in the presentation 22
  • Draft concept "Single construction portal", version 1.0, 25.08.2026.
  • The Government of the Russian Federation is the strategic direction of digital transformation of construction and housing and utilities up to 2030 years: https://government.ru/news/57980/
  • Construction complex.RF: https://стройкомплекс.рф/
  • FGIS EDS NSPD — Rosreestr: https://rosreestr.gov.ru/activity/gosudarstvennye-programmy/natsionalnaya-sistema-prostranstvennykh-dannykh/fgis-etsp-nspd/
  • The draft concept "Single Construction Portal", section 2 - the initial situation and the task.
  • The draft concept of "Single Construction Portal", sections 3 and 7 - target model and digital passport.
  • The project of the concept "Single Construction Portal", section 4.2 - ten stages of the end-to-end life cycle.
  • The project concept "Single construction portal", section 5 - nineteen functional modules.
  • Draft concept "Single construction portal", section 6.2 - the role of the project ecosystem.
  • NSPD portal: https://nspd.gov.ru/
  • Unified State Register of Conclusions: https://gge.ru/services/egrz/
  • FGIS CS: https://fgiscs.minstroyrf.ru/
  • Unified housing information system: https://наш.дом.рф/
  • Unified information system in procurement: https://zakupki.gov.ru/
  • Public services — building permit: https://www.gosuslugi.ru/600168/1
  • The project of the concept "Single Construction Portal", section 7 - a single data model and a digital passport.
  • The project concept "Single Construction Portal", section 8 - through process and control gate.
  • The project of the concept "Single Construction Portal", section 9 - analytics, artificial intelligence and digital twin.
  • Draft concept "Single construction portal", section 10 - management, security and legal contour.
  • The draft concept "Single Construction Portal", section 12.1–12.2 - composition MVP and plan for the first 90 days.
  • The project concept "Single construction portal", sections 12.3–12.4 - pilots and road map.
  • The draft concept "Single Construction Portal", section 13.2 - seven solutions for launch.
SINGLE CONSTRUCTION PORTALSingle_building_portal_architecture_398-p.docx · web text

Architecture of a single digital platform for construction management and housing and utilities

Concept and top-level technical task in the development of the order of the Government of the Russian Federation of 2 March 2026 No 398-r

Horizon2030
SubjectConstruction + Utilities + OX Life Cycle
The architectural principleRegistry core + process layer + TIM + integration + analytics/AI
VersionConcept 1.0 / August 2026

Regulatory basis: Order of the Government of the Russian Federation No. 02.03.2026 of 398-p. Official publication: government.ru.

1. Summary of the decision

It is proposed to create a single digital contour of the management of the capital construction object and municipal infrastructure - from initiative, land-urban preparation and design to commissioning, operation, repair and modernization.

  • The platform does not replace the existing state information systems, but connects them through single data entities, API and event exchange.
  • The center of architecture is a digital passport of the object and a single history of decisions, documents, models, deadlines, cost and responsibility.
  • The TIM/information model is seen as a working lifecycle model rather than as a separate designer file.
  • For the authorities, a management outline is formed: monitoring the timing, risks, cost, digital maturity and data quality.
  • For the market, there is a single participant’s office, clear procedures, machine-readable documents and a reduction in manual re-entry data.

2. Normative binding to order No. 398-r

ContourFunctionResult
The Unified Digital EnvironmentLink federal, regional and facility management levelsDigital Outline of the Industry
Electronic proceduresConvert the interaction of participants of the investment and construction cycle to digital formReducing time and transaction costs
TIM and Digital TwinsUse information models throughout the life cycleTrackable object digital twin
Construction complex.RF / GISOGDProvide data exchange and integrationA unified picture of spatial and urban data
UtilitiesElectronic passports of municipal infrastructure and digital accounting of housing stockTransition from documents to data and events
AIAutomate control, analysis and adoption of standard decisionsRisk forecasting and productivity improvement

3. Target architecture

Five levels of platform

ContourFunctionResult
1. Registry CoreObjects, participants, documents, models, networks, contracts, eventsUnified version of truth
2. Process layerRoutes, statuses, coordination, control of terms and responsibilityManaged investment and construction cycle
3. TIM / Digital DoubleModel versions, verification, comments, executive and operational modelEnd-to-end life cycle model
4. Service layerCabinets, Superservices, Notifications, Electronic FormsConvenient interaction of participants
5. Analytics and AIRisks, cost, timing, quality, maturity, forecastManagement decisions on data

4. Data Model: Main Entities

Capital construction object: Single identifier, address / coordinates, type, stage, parameters, status.

Territory / land: Borders, rights, restrictions, urban conditions, infrastructure.

Project: Goals, parameters, stages, financing, schedule, budget, responsible.

Information model: TIM version, composition, format, checks, comments, relationship to documentation and fact.

Document: Type, version, author, status, machine-readable structure, signature, connection to the procedure.

Procedure / coordination: Foundation, participants, deadline, decision, comments, result.

Contract / commitment: Parties, subject, price, terms, stages, performance, security.

Work / stage: Plan, fact, resources, scope, executor, quality control.

Engineering network / housing and communal services facility: Passport, characteristics, condition, accidents, repairs, investment activities.

Event: Status change, incident, check, data upload, decision, rejection.

5. Functional modules MVP

Module 1. Digital object passport

Single object card; participants; stage; key indicators; decision history; related models and documents.

Module 2. The route of the investment and construction cycle

Step-by-step route of procedures; dependencies; responsible; deadlines; locks; automatic notifications.

Module 3. TIM / digital model

Download; view; versions; checks; collisions; comments; binding to estimates, schedules and executive documentation.

Module 4. Examination and approval

Completeness; comments; answers; electronic solutions; control of regulatory deadlines.

Module 5. Construction control

Plan-fact; executive documentation; photo/video; prescriptions; acts; deviations from design decisions.

Module 6. Utilities

Electronic passport; TU; connections; accidents; repairs; investment activities; readiness for the heating season.

Module 7. Operation and Housing

Transfer of the object; technical condition; appeals; maintenance; overhaul; data for GIS of housing and communal services.

Module 8. Analytical Center

Dashboards; timing; cost; risks; data quality; problem rating; digital maturity; AI-forecast.

6. Role model

RoleWorkflow
Federal RegulatorPolicies, indicators, monitoring, regulatory requirements, interagency coordination
Region / municipalityPortfolio of objects, town planning procedures, infrastructure, time control
State CustomerPlanning, budget, contracting, project progress, acceptance
Developer / InvestorProject route, documents, approvals, terms, risks
Technical customerDesign and construction management, quality control and deadlines
DesignerTIM, documentation, versions, responses to comments
Examination / supervisionTests, observations, conclusions, prescriptions, model use
ContractorProduction of works, executive documentation, plan-fact
RSO / management organizationConnections, operation, accidents, repairs, technical condition
Citizen / ownerStatuses of services, addresses, housing and communal services data, digital interaction

7. Integration architecture

Principle: API-first, event exchange and no re-entry of information already in government systems.

  • EGISOGD "Stroykompleks.RF" and regional GISOGD/ISOGD.
  • FGIS EGRZ and the contours of state expertise.
  • FGIS CS and estimated price data.
  • EHRN and housing sector data.
  • GIS Housing and "Public Services House".
  • NSPD and cadastral-spatial services of Rosreestr.
  • EPGU/Public Services and Electronic Public Services.
  • Information systems of project management of state customers.
  • GIS TOR KND and digital state control/supervision.
  • Corporate ERP/PM/SOD/TIM environments of market participants through standardized API.

8. Technological architecture

ContourFunctionResult
Client LayerWeb/mobile cabinets, adaptive interface, role-oriented desktopsUnified user experience
API GatewayAuthentication, routing, quotas, loggingSecure Integrations
Process EngineBPMN/state machine, SLA, task routingEnforceable regulations
Master Data / RegistryUniform directories and identifiersData consistency
Documents and signatureEDI, versions, UCEP, machine-readable formsLegally significant digital process
TIM-servicesModel storage, viewer, checks, IFC/open formatsDigital twin
Data Lake / DWHHistory, telemetry, aggregates, showcasesAnalytical base
AI-servicesClassification, search, verification, forecast, detection of anomaliesReduction of manual labor
Integration tyreEvents, queues, ETL/ELT, APIConnectivity of federal and regional systems
Information security and auditRole Model, Segmentation, Action Log, ReservationSustainability and trust

9. Priority scenarios AI

  • Automatic verification of the completeness of the package of documents before submission.
  • Semantic comparison of requirements of regulatory documents with project solutions.
  • Search for contradictions between documents, TIM model, estimate and calendar schedule.
  • Forecast of the risk of failure of deadlines and exceeding the budget for the portfolio of objects.
  • Identification of anomalies in executive documentation and photo fixation.
  • Risk profile of contractor and supplier based on confirmed performance data.
  • Forecasting the emergency utility infrastructure by state, age and telemetry.
  • Intellectual assistant of the participant of the investment and construction cycle on procedures and statuses.

10. System of indicators

ContourFunctionResult
DeadlinesMedian duration of key procedures; duration of the full cycleReduction of project time
DigitalizationProportion of procedures without paper duplication; percentage of documents readable by machinesTransition to data
TIMPercentage of objects with current information model; Percentage of checks on the modelThe real use of the digital twin
IntegrationsPercentage of information received automatically; number of repeated manual inputsSeamlessness
QualityNumber of errors/returns; completeness and relevance of dataIncreased reliability
CostBudget/fact deviation; transaction and approval costsReduction of unproductive losses
UtilitiesCompleteness of electronic passports; accident; recovery timeInfrastructure management as at
ManagementProportion of objects with early detection of risk; response time to deviationProactive management

11. Road map of implementation

Stage 0 — 8–12 weeks — Architectural survey; entity register; integration map; pilot selection; regulatory matrix; interface layout.

Stage 1 - 4–6 months - MVP: object passport, route, documents, TIM-viewer, dashboard, 3–5 integrations.

Stage 2 — 6–12 months — Construction control, communal infrastructure, expansion of integrations, electronic acts, regional portfolio.

Stage 3 - 12–18 months - Operation / Housing, AI-scenarios, digital twin, replication to several regions.

Stage 4 - up to 2030 - Scaling, data model unification, industrial operation, industry showcases and interregional analysis.

12. Recommended Pilot

The pilot should not be a “portal for the sake of the portal”, but a demonstration of the through passage of one real object through a digital route.

  • One region / one major customer / 3–10 objects.
  • Fixed set of procedures: baseline data → Design → Expertise → permission → Construction → Executive documentation → input.
  • Mandatory TIM model and digital passport of the object.
  • Integrations with Stroykompleks.RF/regional GISOGD, expertise, NSPD and customer system.
  • Control metrics before/after: the duration of the procedure, the number of manual inputs, returns, errors, delays, reporting time.

13. Organizational model

ContourFunctionResult
Project CouncilMinstroy/region/customer/operator/key departmentsDecisions on priorities and barriers
The Architectural CommitteeData, integrations, TIM, IS, standardsIntegrity of architecture
Product officeCustom scripts, backlog, metricsRapid product development
Data and Quality CenterNSI, passports, quality rules, shop windowsTrust in data
TIM Competence CenterFormats, models, checks, trainingUniform rules for working with models
Operation CenterSLA, incidents, releases, stabilityIndustrial reliability

14. Architectural principles

  • Data once: information is entered or retrieved from the primary source and reused.
  • The object as a digital entity: all documents and events are associated with a single passport.
  • Open interfaces: integrations through documented API and events.
  • Default machine readability: XML/JSON/structured forms instead of "PDF as databases".
  • Validity and provability: history of changes, authorship, signature and audit of each critical action.
  • Federality: Uniform rules and data models while maintaining regional and corporate systems.
  • Security by architecture: minimum rights, segmentation, logging, redundancy and control of the software supply chain.
  • Import independence: the priority of domestic components and portable open formats.

15. Decisions to be taken to launch

  • Approve the product owner and pilot territory/customer.
  • Approve the canonical data model and object identifier.
  • Define 5–7 mandatory integrations of the first stage.
  • Choose a reference route of the investment and construction cycle for MVP.
  • Record the requirements for the TIM model and the general data environment.
  • Approve KPI pilot and method of effect measurement.
  • Form an interdepartmental architectural group and a product office.

Sources

1. Order of the Government of the Russian Federation of 02.03.2026 No. 398-r "On approval of the strategic direction in the field of digital transformation of construction industries and housing and communal services of the Russian Federation up to 2030 years". Official website of the Government of Russia: https://government.ru/docs/all/163630/

2. Official PDF of the order: https://static.government.ru/media/files/A6eGtkkDnhcpleQoLgSn8XTLxP5RCvBT.pdf

The document is a conceptual architecture and does not replace regulations, technical requirements of state information systems and mandatory information security procedures.

SINGLE CONSTRUCTION PORTALSingle_building_portal_398-p_presentation.pptx · web text

Unified digital platform of construction management and housing and utilities

ANALYTICS + AI

SERVICES AND CABLES

TIM / DIGITAL DOUBLE

PROCESS LAY

Architecture in the development of the order of the Government of the Russian Federation of 2 March 2026 No 398-r

REGISTER NUCLEAR

CONSTRUCTION → ENTER → EXPLOITATION → Utilities

Concept 1.0 • August 2026

Why we need a platform now

No398-r sets the industry target state: a single digital environment, end-to-end procedures, TIM, digital twins, AI and digital housing and utilities.

The State Task

Technological transition

The HVAC as a continuation of the cycle

Convert the interaction of the participants of the investment and construction cycle to electronic form and reduce the duration of procedures.

Use TIM on the life cycle of the object and form digital twins of capital construction objects.

Electronic passports of municipal infrastructure, digital accounting of housing stock and platform management of housing and communal services.

The key gap today

→ Unified version of the truth about the object

Disjointed systems

Re-entering data

PDF instead of data

Lack of a single object history

Source: Government of Russia, Order No. 398-r of 02.03.2026.

Target architecture: 5 levels

The platform links data, processes, digital models, services, and management without creating another isolated GIS.

Forecast of timing, cost, risks, accidents; control of digital maturity

ANALYTICS AND AI

Role cabinets, super services, notifications, electronic forms

SERVICE SLAY

Versions of models, inspections, executive and operational model

TIM / DIGITAL DOUBLE

Routes, statuses, SLA, coordination, tasks, responsibility

PROCESS LAY

Objects, participants, documents, networks, contracts, events

REGISTER NUCLEAR

End-to-end object life cycle

The main object of management is not a document and not a departmental procedure, but a single digital essence of the OKS.

Initiative

Land / GPA

Searches

Design

Expertise

Permission

Construction

Input

Operation

Kapremont / Modernization

Object ID • Spatial Data • Participants • documents • TIM • Timeline • cost • Solutions • Events • technical condition

SINGLE DIGITAL PASSPORT OBJECT

One story of the object - from the first solution to operation.

Data Model: What Connects the Platform

If there are no common entities and identifiers, integration turns into file sharing.

OBJECT

TERRITORY

PROJECT

TIM MODEL

DOCUMENT

PROCEDURE

CONTRACT

WORK / STAGE

NETWORK / ACCOMMODATION

EVENT

Connection graph: who → that → when → on what basis → with what result

MVP: 8 functional modules

The first release should show the full digital route of the object, not the maximum number of functions.

Object passport

Route ISC

TIM / Model

Expertise

Construction Control

Utilities

Operation / Utilities

Analytical Center

MVP = digital passport + route + Model + documents + control + 3–5 Integrations + Dashboard Management

Role model: one object - different jobs

Each role has its own set of tasks and KPI, but all work with one digital history of the object.

Federal Regulator

Region / municipality

Customer / Investor

Designer / Expert

Policies • KPI • monitoring

Portfolio • procedures • infrastructure

Terms • budget • decisions

TIM • documentation • comments

Contractor / technical customer

RSO / UK

Oversight

Citizen / owner

Works • acts • plan-fact

Connections • condition • accident

Inspections •

Services • calls • housing and communal services

Integration circuit

The platform is an orchestrator and a single point of user interaction, not a duplicate of primary state registers.

Public services

Construction complex.RF

GIS Utilities

SINGLE

BUILDING PORTAL

EWISS

GIZOGD

EGRZ / examination

NSPD / Rosreestr

ICUP

API • Events • Data Showcase • single identifiers • machine-readable formats

Top-level technology stack

The architecture should be modular, federative and portable between regions and customers.

Web / Mobile / Offices

Role-Oriented UX

API Gateway + IAM

Authentication, routing, audit

BPM / process engine

Implementing Regulations and SLA

Master Data + Registry

NSIs and common identifiers

Documents + UKEP

Versions and legal significance

TIM-services + CDE

Models, viewer, checks

DWH / Data Lake

History, telemetry, showcases

AI-services

Search, control, forecast, anomalies

Integration Bus

API, Events, ETL/ELT

Information security / monitoring

Segmentation, logs, reservation

AI: Only where there is a measurable effect

AI does not replace a legally significant solution - it reduces manual work, detects risks and prepares an evidence base.

Completeness

Regulatory control

Coherence

Timing and budget

Checking the package before serving

Comparison of requirements and project solutions

Documents ↔ TIM ↔ estimate ↔ schedule

Deviation forecast

Construction Control

Counterparts

Utilities

Assistant

Anomalies in acts and photo fixation

Risk profile of execution

Accident forecast

Tips on routes and statuses

KPI Platform

Evaluate not the number of functions, but the change in speed, quality and transparency of the investment and construction cycle.

DATE

DIGITALIZATION

TIM

INTEGRATION

Duration of procedures and full cycle

the proportion of processes without paper duplicate

model relevance and the proportion of model checks

share of data without re-entering

QUALITY

COSTS

Utilities

GOVERNANCE

errors, returns, completeness of data

Rejection Budget / Fact

completeness of passports, accident, recovery

Early detection of risks and speed of reaction

Main effect: less manual labor + less returns + earlier risk + faster input object

Pilot: one real object outline

The pilot has to prove the reduction of time and number of manual operations on specific procedures.

1 region / 1 customer

Mandatory TIM

Cross-country route

3–10 objects

Single Digital Passport

from source data to input

3–5 Integrations

Metrics "before / after"

Dashboard Management

GISOGD, expertise, NSPD, ISUP

terms, inputs, returns, errors

events, risks, blocking

The purpose of the pilot: not to introduce "everything", but to prove the performance of a single digital history of the object.

Road map

From an architectural survey to a replicable industry platform.

8–12 weeks

4–6 months

6–12 months

12–18 months

up to 2030

Architecture

Data Model

Pilot

MVP

Passport

route

TIM

Construction Control

Utilities networks

Integration

Operation

AI

several regions

Scaling

Unification

Industry Showcases

Each stage ends with a measurable result and a scaling decision.

Organizational management model

Technology without a data owner and process owner will not have an industry effect.

Project Council

The Architectural Committee

Product office

Priorities and inter-agency solutions

Data • TIM • integration •

Backlog • UX • metrics • releases

Data Center

TIM Competence Center

Operation Center

NSI • quality • shop windows

Formats • rules • training

SLA • Incidents • Sustainability

What you need to approve for launch

Seven solutions translate the concept from presentation to pilot project.

Product Owner and Pilot Area

Canonical data model and object ID

5–7 mandatory integrations MVP

Reference route of the investment and construction cycle

Requirements for TIM and general data environment

KPI pilots and the method of effect

Interdepartmental architectural group and product office

Next step: architectural survey + Pilot's Choice + layout of key screens

Normative support

Key theses of the presentation are built on the official text of the order of the Government of the Russian Federation No. 398-r.

Order of the Government of the Russian Federation 02.03.2026 № 398-r

"Strategic direction in the field of digital transformation of construction and housing and communal services of the Russian Federation up to 2030".

Official publication

government.ru/docs/all/163630/

Official PDF

static.government.ru/media/files/A6eGtkkDnhcpleQoLgSn8XTLxP5RCvBT.pdf

The concept of the platform is a project proposal and should be detailed taking into account the requirements of specific state information systems, information interaction regulations and information security requirements.