Home / Knowledge / Package to Alexander Shokhin and RSPP

Primary document · 25–29 August 2026

Package for Alexander Shokhin and the Russian Union of Industrialists and Entrepreneurs

A set of materials for discussion of the system of balances and programs with the Russian Union of Industrialists and Entrepreneurs.

Material for the article "Package to Alexander Shokhin and RSPP"
The first page of the presentation from the package of primary materials.

Brief annotation

About the document

A set of materials for discussion of the system of balances and programs with the Russian Union of Industrialists and Entrepreneurs.

Presentation

Paket_Shokhinu_AN_RSPP.pptx

Page — from —
Width

Downloading the document...

For viewing prepared PDF-copy of the presentation. PowerPoint animations and transitions are not played.

Scroll through the pages and change the scale on the viewbar.

EQUILIBRIUM · ECO-PPA · SPECZASHCHITA · ESG-IR · SFERA

President of RSPP Alexander Shokhin

Initiator: Sokolov Sergey Leonidovich · 29 August 2026

Status: Proposal for expert discussion; not a solution or standard of the RUIE

02 / OFFICIAL TREATMENT

the President of the Russian Union

Industrialists and Entrepreneurs

Shokhin Alexander Nikolaevich

Sokolov Sergey Leonidovich

About carrying out on the site of RSPP 90-day approbation of the contour of formation and verification of industrial, environmental and social projects

Dear Alexander Nikolaevich!

Russian business needs an agreed mechanism linking the strategic task of the company or territory with the project solution, the obligations of the parties, resources, calendar, primary data and independently verifiable result.

I propose to hold on the site of RSPP 90-day organizational and methodological approbation of the author 's design and analytical outline "EQUILIBRIUM — ECO-PPA — SPECZASHCHITA — ESG-IR — SFERAthe Materials of Voluntary Participating Companies and Industry Associations.

Limit of offer

Approbation does not create funding obligations for the RSPP, does not mean the acceptance of the methodology by the RSPP standard and does not replace audit, mandatory reporting, expertise or government regulation.

Support 90-day testing.

To instruct the RSPP staff to identify a coordinator and prepare the composition of the working group and the technical task within 15 calendar days.

Invite relevant committees and voluntarily participating companies to submit up to three project cases to test the methodology.

Following the test, consider the consolidated report and decide on a 12-month pilot, revision of the methodology or completion of the experiment.

I am ready to present the architecture of the system and the draft of the technical task at a working meeting at a convenient time for you.

With respect,

Sokolov Sergey Leonidovich

severa70@mail.ru

03 / SOLUTION CARD

One limited solution is required

Allow verification of the mechanism on voluntary cases - without financial and reputational advance from the RSPP.

Draft decision
To support 90-day organizational and methodological testing; to identify a coordinator; to form a working group; to select up to three cases; on 90-th day to take a decision GO / GO WITH CONDITIONS / NO-GO.

ParameterProposed design
PlaygroundRSPP as an institutional coordinator of the business circuit.
SubjectProject passport, obligations, resources, data, risks, evidence and adjustment rules.
ParticipantsUp to three voluntary cases; preferably at least two companies and two industry contexts.
Timeframe90 calendar days from the approval of the technical specification.
ResultProven methodology, demonstration register, expert opinions, list of gaps and decision on further status.
What is not requiredRUIE financing, investment guarantee, acceptance of commercial or technological risk, preliminary recognition of the standard.

Logic corresponds to the previously formulated principle: RSPP is proposed not to adopt the system, but to jointly test the model.

04 / CONFORMITY OF THE RUIE

The proposal meets the current business agenda of the RSPP

Approbation combines the tasks of investment, technological sovereignty, cooperation, digitalization and evidence-based sustainability.

RUIE priorityPackage pairing pointSource
Balanced growth and investmentSelection of projects on the completeness of the mandate, resources, risks and measurable results.[1], [2]
Project and infrastructure financingPreparation of a verifiable project dossier before attracting PPP instruments, credit or bonds.[1], [3]
Technological SovereigntyAccounting for R&D, software, technology rights, engineering, localization and independent expertise.[4], [5]
Industrial cooperationAssembling a consortium to the specific request of the enterprise and replicating only a proven solution.[5]
Digitalization and productivityUnified data passport, reproducible calculation and protected demonstration register.[6], [7]
Responsible business practicesThe project chain of evidence as a complement to the current indices and public assurance of the RSPP.[8]
Ecology and climateMeasurable effect, adaptation, natural data and balance of environmental objectives with the capabilities of companies.[9], [10]

Positioning
Not a new comprehensive system, but a limited protocol for the preparation and verification of design solutions, compatible with the existing tools of companies and RSPP.

05 / VERIFIED PROBLEM

Initiative and report often exist separately from the proven result

  • Break 1. The strategic task is not translated into a single passport with the owner, borders and initial condition.
  • Break 2. Resources and obligations are accounted for in different systems and do not form a common chain of responsibility.
  • Break 3. The result indicator is fixed without a pre-approved methodology, baseline and data source.
  • Break 4. The executor, data owner and verifier may depend on each other.
  • Break 5. Reporting appears after execution and does not manage adjustments during the project.
  • Break 6. A successful case is difficult to replicate and scale without a common solution dossier.

Approbation Hypothesis
By linking mandate, passport, commitment, resources, primary data and independent verification in a single version chain, the decision to fund and scale will become more explainable and verifiable. This hypothesis must be confirmed or refuted by real cases.

06 / TRAVEL ROUTE

From enterprise request to scaling decision

Short formula
RSPP forms a request → EQUILIBRIUM Design Options → ECO-PPA consolidates the project and obligations → SPECZASHCHITA Collects execution → ESG-IR proves the result → SFERA Scaling a Verified Solution.

1. Request. A company or industry association formulates the problem, the owner of the solution and the boundaries of the case.

2. Diagnostics. EQUILIBRIUM Comparing the initial state, 19 Balance Sheets, Risks, Scenarios and Data Shortages.

3. Design. ECO-PPA converts the selected scenario into a passport, obligations, resource plan, calendar and result conditions.

4. Cooperation. SPECZASHCHITA forms performers, work packages, supply chain and evidentiary materials.

5. Verification. ESG-IR records the methods, origin of the data, independence of verification and status of each statement.

6. Portfolio. SFERA collects proven solutions and partners; The RSPP decides on further approbation or scaling.

Confirmed data is returned to EQUILIBRIUM for a new cycle of analysis and adjustment.

07 / PROJECT COUNTING SYSTEM

Eight related registries maintain the integrity of the project

This is not a replacement for accounting, ERP, EDMS or state information systems, but a connecting layer of project events.

R1 Mandate and authority - who is entitled to initiate, select, execute, own, verify and challenge data.

R2 Rights and Assets - What is owned, available, licensed, limited or encumbered.

R3 Obligations and risks - who, what, to whom and by what date should; who carries the risk of rejection.

R4 Resources and financing - sources, limits, reserves, conditions of use and actual consumption.

R5 Designs and solutions - options, selected scenario, feasibility study, calendar, assumptions and solution version.

R6 Actions and Executions - Work Packages, Deliveries, Checkpoints, and Deviations

R7 Data and evidence - source, owner, methodology, signature, measurement, origin and status of verification.

R8 Results and adjustments - change before/after, attribution, output, new version event and project lesson.

End-to-end identifier
One event identifier links records in all affected registries. An unrelated record cannot serve as the basis for a final calculation or statement of effect.

08 / UNIVERSAL PASSPORT

Passport of the project event — atom of approbation

BlockRequired fieldsMonitoring
IdentityID, type, territory, time, version.uniqueness, immutability
Basislaw, mandate, agreement, limit.authority, term
Problem and baselineboundaries, initial state, cut-off date.materiality, comparability
Partiesinitiator, owner, executor, beneficiary, validator.Division of roles
Sign inright, resource, data, obligation, risk.ownership, quality, access
Decisionscenario, feasibility study, calendar, assumptions, stop conditions.approval, version
Withdrawalnew condition, result, residue, side effect.Attribution, double counting
Evidencemethodology, measurement, document, signature, expert verification.origin, independence
Responsibilityowner of risk, SLA, dispute, correction.Escalation, adjustment

Version Rule
The error is not erased: a compensating event is created with a reference to the original record, the cause, the author, the time and a new version of the technique.

09 / MATRICA FULL

3 × 13 × 19 = 741 — The author's engineering hypothesis of completeness

Formula
Three Scales - Man, State, Planet - × thirteen phases of the life cycle × nineteen balances = 741 verification position. Each position answers: what is known, who is responsible, what is confirmed and whether an adjustment is required?

StatusMeaningManagement action
0 - no datasource is missing or unassignedappoint the owner and term
1 - observationdata is available, the threshold is not confirmedcheck the quality
2 - Riskcorridor is broken or insufficient evidenceEscalation to the owner of risk
3 — managementmandate, resource and action recordedMonitoring of execution
4 — provenThe result is independently verifiedcalculation and possible replication
5 — adjustmentconditions have changed or an error has been detectedcreate a new version event

Limitation
The matrix 741 is not claimed to be an RUIE standard, company rating or regulatory requirement. In approbation, only its practical utility for identifying unknown critical areas is tested.

10 / ECO-PPA

ECO-PPA collects project, commitment and resources

The working mechanism of the project assembly - until the final legal design of each case is determined.

Passport. object, territory, problem, baseline, parties and version of the design solution

Commitments. who provides the resource, who performs the action, who accepts the result and who carries the risk

Economic sources, budget and extra-budgetary instruments, the price of the result, reserves and calculation conditions

Calendar. Checkpoints, conditions of beginning, stopping, revision and completion

Evidence. metrics, methodologies, primary data, quality control and independent verification

Adjustment. order of change of initial condition, price, volume, terms and responsibility

Legal disclaimer
ECO-PPA is not declared an independent type of contract established by law. In each case, the lawyers qualify the applicable design: supply contract, contract, service, offset, concession, PPP, project financing or their acceptable combination.

Approbation ends not with the signing of the transaction, but with a verified project dossier and a list of legal options.

11 / PROOF ESG-IR

Each significant statement passes one chain of verification

Chain
Indicator → Methodology → baseline → Primary data → Owner → date → calculation → Proof → independent verification → status.

Method to result. The unit, boundaries, formula, assumptions, periodicity and criterion of materiality are fixed in advance.

Origin of data. The source, access right, version, quality control and all conversions are retained.

Status of approval. “confirmed”, “waiting for verification”, “rejected” or “not applicable”; there are no significant unsigned findings.

Independence. The Contractor does not confirm its own result; the conflict of interest is disclosed and managed.

Reproduction. The expert can repeat the calculation according to the same version of the data and methodology.

Conjugation with RSPP practice
ESG-IR is proposed as an experimental project layer of evidence, complementing, rather than replacing, the existing indices, non-financial reporting and public certification of the RSPP [8].

ESG-IR does not replace audit, EIA, government review, mandatory reporting or supervisory procedures.

12 / DIVISION OF TERMS

No circuit selects, executes and confirms its result simultaneously

ContourResponsibilityNot
RSPPplatform, business mandate, companies, rules of approbation and final decisionan investor, operator or verifier of projects
EQUILIBRIUMDiagnostics, Balances, Scenarios, Priorities and Analytical Optionsthe Corporate or State Decision Body
ECO-PPApassport, obligations, resources, calendar, risks and contractual assemblyIndependent type of contract without legal qualification
SPECZASHCHITAconsortium, organization, execution and supporting materialsIndependent reviewer of own results
ESG-IRindicators, data origin, verification rules and independent reviewreplacement of audit, reporting or state examination
SFERAportfolio, communication, search for partners and replication of provenSource of primary evidence or admission authority

Formula of responsibility
RSPP sets the platform and business mandate; EQUILIBRIUM see and prepare options; ECO-PPA collects the project; SPECZASHCHITA organizes execution; ESG-IR proves; SFERA Distributes only verified.

13 / APPRECIATION BODIES

The working group manages the experiment, not the projects of the companies

Coordinator from RSPP. convenes a working group, fixes decisions, routes cases and monitors mandate compliance

Participating companies. provide the case voluntarily, appoint the owners of the decision and data, determine the confidentiality regime

Industry experts. check the applicability of the methodology, technological assumptions and industry restrictions

The operator of the technique. prepares passports, dictionaries, a demonstration register and methodological materials

Legal and information security. checks law, data, trade secrets, IP, intellectual rights and cyber risks

Independent reviewers. evaluate the reproducibility of calculations, the sufficiency of evidence and conflicts of interest

Recommended sites for routing by the decision of the RSPP Office:

  • Committee on Environment and Climate Policy;
  • Committee on Sustainable Development and Population Policy;
  • Coordinating Council on Technological Leadership and Industrial Policy;
  • profile financial, digital and industry contours of RSPP.

14 / PLAN 90 DAYS

Six steps lead to a testable solution on day 90

TimeframeStageVerified result
1–10Mandate and perimetercoordinator, working group, TK, restrictions, confidentiality
11–25Selection of casesup to three cases, owners, source materials, materiality criteria
26–45Passportspassports ECO-PPA, baseline, roles, risks, indicators, data deficit
46–65Evidencedata dictionary, methods, ESG-IR-chains, legal and information security check
66–80End-to-end testdemonstration register, two consecutive sections, reproducibility test
81–90Decisionfinal report, independent review, plan 12 months, GO / conditions / NO-GO

Results 90 days
Regulations on the working group; a single dictionary; case passports; register of risks and obligations; protocol ESG-IR; conclusions on law, data and information security; demonstration register; project 12-month pilot.

It is recommended to complete at least two cases with a full end-to-end test; incomplete cases are documented as proven limitations of the technique.

15 / LAW, DATA AND INTELLECTUAL PROPERTY

Evidence is built without excessive data disclosure

  • Minimization. Only the amount of data required for a specific check is transmitted.
  • Possession. The source and legal owner of the data are recorded; participation does not change ownership automatically.
  • Separation of access. Open, working, confidential and protected layers have different modes.
  • Versionality. The original records, conversions, methodologies and adjustment decisions are retained.
  • Publication. External disclosure is allowed only with the consent of the owner and after verification of trade secrets.
  • Intellectual rights. The methodology, initial decisions of the companies and joint results are delimited by the agreement before the work begins.

Stop-conditions
Approbation is suspended if there is no legal basis for data processing; it is impossible to separate the operator from the verifier; critical infrastructure is disclosed; third-party rights are violated; there is no appeal mechanism.

Specific requirements are determined by lawyers, data owners and information security specialists for each case.

16 / TRANSITION CRITERIA

Transition to 12 months is possible only under critical conditions

  • At least two companies confirm further participation in writing.
  • Each case has a decision owner and data owner.
  • Mandatory passport fields are filled or the data deficit is officially accepted by the working group.
  • For key indicators, a unit, baseline, source, methodology, frequency and method of verification are determined.
  • All significant statements have signed status; calculations are reproduced by an independent expert.
  • At least two consecutive data slices are obtained.
  • There are no unresolved critical legal, informational or ethical risks.
  • The contractor does not confirm its own result.
  • The companies approved a resource and organizational plan for a 12-month-old pilot.
DecisionCondition
GOAll critical conditions are met
GO WITH CONDITIONSThere are only non-critical breaks with the owner and the approved deadline for elimination.
NO-GO / REDESIGNno owner, the result is immeasurable, the calculation is irreproducible or a critical conflict of interest persists

17 / CONTOUR 12-MONTH PILOT

Pilot Scales Proven Process, Not Promised Effect

PeriodMain objectiveResult of period
Months 1–3Regulatory and technical architecturecontracts, data model, integration, independence rules
Months 4–6Production cycles of casesoperational events, control sections, deflection management
Months 7–9effect and reproducibility checkindependent calculations, adjustments, industry comparison
Months 10–12Scaling AssessmentFinal dossier, economic and legal assessment, decision of RSPP and companies

Prior to the start of the pilot, a separate approval is required:

  • perimeter of companies, cases, data and integrations;
  • budget and sources of funding - without assuming that the RSPP finances the pilot;
  • methods of indicators, independent reviewer and rules of conflict of interest;
  • order of publication, protection of trade secrets and distribution of intellectual property rights;
  • Stop conditions, order of dispute, adjustment and completion.

The criterion of success
At least one reproducible route from signal to adjustment where authority, resource, action, data, proof, and solution can be restored.

18 / DRAFT RESOLUTION

Draft order of the President of RSPP

1. Support
Conducting 90-day organizational and methodological testing without the obligations of the RSPP to finance projects and without prior recognition of the methodology as an instrument or standard of the RSPP.

2. RSPP, together with the interested committees and departments, shall submit within 15 calendar days:

  • the candidate coordinator;
  • Draft regulations on the working group;
  • technical task;
  • list of voluntarily participating organizations and cases;
  • rules for working with data, trade secrets and approbation results.

3. The Working Group shall ensure:

  • testing the methodology on a limited set of voluntary cases;
  • independent legal, technical and methodological review;
  • preservation of the right of companies to terminate participation in the manner prescribed by the terms of reference.

4. Upon completion 90 days
Submit to the President of the RSPP the final report and draft decision: go to the 12-month pilot; continue refining with the conditions; or complete the experiment.

The wording is a project for legal and organizational improvement by the RSPP.

19 / SET OF APPLICATIONS

Package ready for review at the first working meeting

  1. Annex 1. One-page solution card and testing limits.
  2. Annex 2. Draft regulation on the working group.
  3. Annex 3. Technical specifications for 90 days.
  4. Annex 4. Passport form of the project event / ECO-PPA.
  5. Annex 5. Dictionary of eight registers, 19 balances and 13 phases.
  6. Annex 6. Map of completeness 741 and status rules.
  7. Annex 7. Protocol ESG-IR and verification independence requirements.
  8. Annex 8. Form of voluntary consent of the company and confidentiality regime.
  9. Annex 9. Criteria for selection of cases and the template of the initial data.
  10. Annex 10. Register of risks, conflicts of interest and stop conditions.
  11. Annex 11. GO / GO Criteria WITH CONDITIONS / NO-GO.
  12. Annex 12. Contour 12-month pilot and a list of solutions before launch.

Proposed first step
30- minute working performance: 10 minutes - problem and contour; 10 minutes — passport and proof; 10 minutes — decision on the composition of the working group and cases.

20 / OFFICIAL SOURCES

Current agenda and status of the addressee checked on materials of RSPP and Kremlin

[1] Draft resolution XXXV of the Congress of the RUIE, 23.03.2026

[2] Results XXXV Congress of the RSPP, 27.03.2026

[3] Investments and structural shifts, RSPP, 19.08.2026

[4] Investments, cooperation, localization, RSPP, 24.08.2026

[5] Results of "Innoprom-2026", RSPP, 09.07.2026

[6] Digital Forum: Barriers to Development AI, RSPP, 24.02.2026

[7] Labor productivity, RSPP, 27.06.2026

[8] RSPP Responsible Business Practices Report 2022–2026

[9] RSPP Committee on Ecology and Climate Policy, 18.04.2026

[10] National Climate Agenda Report, RSPP, 04.06.2026

Structure of RSPP: President of RSPP A.N. Shokhin

Working meeting of the President of the Russian Federation with the President of RSPP A.N. Shokhin, 26.05.2026

Document status
Author's concept. Any legal, financial, technical, metrological and industry conclusions arise only after independent verification of specific cases. Access to sources verified 29 August 2026

Sokolov Sergey Leonidovich · EQUILIBRIUM — ECO-PPA — SPECZASHCHITA — ESG-IR — SFERA

Source materials

Originals and versions of the document

Other editions in web format

Each version is disclosed separately; the sequence of the source document is saved.

Package to A.N. ShokhinPaket_Shokhinu_AN_RSPP.pptx · web text

Project Cycle Counting System

RSPP proposal to jointly test the model on voluntary cases - without funding commitments and without premature status of the standard.

Sokolov Sergey Leonidovich

29 August 2026

01 / 15

One solution runs a no-commitment test

COUNTING SYSTEM

Authorize joint testing of the counting model on a limited set of voluntary cases.

RSPP forms a request and a verification site.

NON-FINANCING

days

The method gets the status only after the facts and expertise.

NOT STANDARD

12 months are discussed only after a positive result.

NOT A PILOT A YEAR

PACKAGE K A.N. Shokhin

02 / 15

RSPP sets the request and rules for verification

Role of RSPP

Intersectoral cooperation

RSPP

not the project operator

Compare cases from different companies and industries.

Investment and ESG-agenda

Its value is to unite companies, fix the business issue and take the result according to previously agreed criteria.

Link the economics of the project with verifiable data.

Productivity and Scaling

Separate the reproducible mechanism from the single practice.

Request → Rules → Conclusion

PACKAGE K A.N. Shokhin

03 / 15

The project cycle is broken between documents

CYCLE DEVELOPMENT

Today

REQUEST

TECHMODELE

AGREEMENT

EXECUTION

DATA

DECISION

ROLES

DEVELOPMENTS

PROOF

Liability limits are not fixed

The contract and the actual event differ

Data is collected post-facto

We need a common counting circuit that links the decision, commitment, event, and confirmation.

PACKAGE K A.N. Shokhin

04 / 15

Six functions form a cross-cutting contour

DISTRIBUTION OF FUNCTIONS

One circuit - different owners of functions

forms a request

Designing

RSPP

EQUILIBRIUM

unites and implements

Strengthens the economy

SPECZASHCHITA

ECO-PPA

proves the result

Scaling

ESG-IR

SFERA

Inquiry → Project → Implementation → Economy → Proof → Scale

PACKAGE K A.N. Shokhin

05 / 15

Eight registers collect the project in a single ledger

WORKING MODEL

Request and mandate

ECO-PPA

What is being checked and who is authorized

Economic obligations and conditions

Participants and roles

Events

Responsibility, Access and Conflict of Functions

What happened, when and to what extent

Project solutions

ESG-IR

versions, assumptions and points of choice

chain of evidence and verification

Data

Decisions

source, owner, quality and period

GO, Conditions, Stop or Scaling

Registers are subject to verification, not a ready-made regulatory form.

PACKAGE K A.N. Shokhin

06 / 15

ECO-PPA

ECONOMY

ECO-PPA enshrines economic logic in event passport

EXPERIMENTAL MECHANISM

WHAT IS AGREED

object · base · indicator · commitment

A working passport that links a condition, a measurable event, and an economic consequence.

WHAT HAPPENED

Event · Period · Deviation · Owner

WHAT IS CONFIRMED

It does not promise profitability. It does not replace the contract. Checks the model connectivity.

Source · Method · Verification · Conclusion

The passport becomes a common reference point for business, project and evidentiary function.

PACKAGE K A.N. Shokhin

07 / 15

ESG-IR concludes reproducible, not declarative

EVALUATION CHARGE

EXPERIMENTAL MECHANISM · each total passes one chain of origin of data

REQUIREMENT

SOURCE

EVENT

What needs to be proved

Where the data came from

what happened and when

METHOD

VERIFICATION

CONCLUSION

How the indicator is calculated

Who and what checked

What can be asserted

If the link is not confirmed, the conclusion is marked as conditional or unproven.

PACKAGE K A.N. Shokhin

08 / 15

741

MAP VERIFICATION

741 — completeness card, not standard

3 × 13 × 19

facility · enterprise · inter-industry circuit

3 scales

Test combination

Project and operational cycle sequence

13 Phases

The coating helps to see omissions and repetitions - it does not prove the applicability of each combination.

Economics, Resources, Commitments and Evidence

19 balances

On the 90-th day the map is revised on the actual cases.

PACKAGE K A.N. Shokhin

09 / 15

Separation of Functions Protects Self-Esteem Verification

ROLES AND BORDERS

Each participant is responsible for his own site; the result is formed only by comparing independent contours.

CONTOURFUNCTIONBORDER
RSPPrequest and rulesNot an operator and not a verifier
EQUILIBRIUMArchitecture Modelsdoes not confirm its own result
SPECZASHCHITAIntegration and executionNot the only source of data
ECO-PPAexperimental economic passportNo guarantee of effect or funding
ESG-IRExperimental chain of evidenceoutput only within the data
SFERAPropagationAfter the Go decision.

PACKAGE K A.N. Shokhin

10 / 15

Up to three voluntary cases are enough for the first check

CASE SELECTION

Minimum Variability

Criteria for admission

Case

  • Volunteering. Written consent of the owner of the case.
  • Availability of data. The source and the responsible are identified.
  • Eventuality. There is a measurable change within 90 days.
  • Legally verifiable. There is no prohibition on contour analysis.
  • Comparability. There is a common minimum of fields between cases.

Managed Volume

Company

Not a single practice

Industry

tolerability check

Commercial data remains with the owners; access mode is agreed separately.

PACKAGE K A.N. Shokhin

11 / 15

90 days divided into three test stages

SCHEDULE OF APROBATION

Each stage ends with an artifact and a decision to continue.

DAYS 1–30

DAYS 31–60

DAYS 61–90

Assembly

PROGON

CONCLUSION

Mandate · cases · data · basic passports

Events · Deviations · Proof Chain

reconciliation · criteria · solution GO/NO-GO

Transition between stages - only in the presence of the data owner and the permitted mode of operation.

PACKAGE K A.N. Shokhin

12 / 15

Day 90: Six verifiable results

RESULTS OF THE APROBATION

Proven role scheme

Passport Cases

Who creates, transmits and confirms data

single minimum ECO-PPA for selected projects

Completed registers

Evidence Chains

consequences of decisions, events and deviations

ESG-IR marked with spaces

Legal Data Limitations

Outcome protocol

List of permits, risks and improvements

GO, conditional GO or NO-GO

The value of approbation is not a beautiful report, but the right to accept a negative conclusion on a verifiable basis.

PACKAGE K A.N. Shokhin

13 / 15

Outcome: data, law, reproducibility

CRITERIUM RESULT

The same criteria apply to each case and to the model as a whole.

CRITERIAGOCONDITIONAL GONO-GO
Data traceabilitySource and owner confirmedThere are closed gaps.Key source not available
Legal capacitymode applicableNeed to refine conditionsModel not applicable
ReproducibilityRepeat the resultRepeat with reservationsthe conclusion depends on the manual interpretation
Practical loadproportional to the taskneed to simplify the contourLoad Blocks Application
Readiness of participantsOwners are appointedNeed for additional commitmentsNo responsible parties

A 12-month pilot is only possible after GO or an agreed conditional GO.

PACKAGE K A.N. Shokhin

14 / 15

Resolution fixes limited next step

DECISION

"To support the joint 90-day testing of the project cycle counting system on voluntary cases of RSPP member companies. To instruct the working group to determine the composition of cases, the mode of working with data and the criteria for the final decision. The question of 12-month pilot to consider after the confirmation of the data, the legal and practical viability of the model.

Schedule a working meeting and agree on the owner of 90-day approbation

NEXT STEP

Sokolov Sergey Leonidovich · severa70@mail.ru

PACKAGE K A.N. Shokhin

15 / 15

Sources indicated in the presentation 7
  • https://rspp.ru/about/structure/
  • https://rspp.ru/events/news/na-sezde-rspp-s-uchastiem-prezidenta-rf-vladimira-putina-obsudili-perspektivy-vozvrashcheniya-ekonomiki-k-ustoychivomu-rostu-69c6a06a2db37/
  • https://rspp.ru/events/news/investitsii-i-strukturnye-sdvigi-chto-biznes-zhdet-ot-donastroyki-gospodderzhki-itogi-zasedaniya-soveta-po-strategicheskomu-razvitiyu-6a85c4928270a/
  • https://rspp.ru/events/news/investitsii-kooperatsiya-lokalizatsiya-koorsovet-rspp-v-tsfo-oboznachil-prioritety-promyshlennoy-politiki-6a8c04594bc28/
  • https://rspp.ru/events/news/proizvoditelnost-truda-kak-osnova-razvitiya-o-chem-govorili-na-federalnom-sovete-rspp-6a3f9781490a4/
  • https://rspp.ru/download/65ddb8db6f5289602e8d1aa18c76a1d934d4ce7093107c7f/
  • [/Sources]