Home / Knowledge / Register 741 fields "SOYUZ-741"

Primary document · 25–29 August 2026

Register of the 741 Fields of SOYUZ741

A register of systemic fields and connections used in the SOYUZ741 architecture.

Registry Image: Ordered Records and Communications in the Common System
Registry Image: Ordered records and communications in a common system. Artistic visualization; source documents are available below.

Brief annotation

About the document

A register of systemic fields and connections used in the SOYUZ741 architecture.

Presentation

Реестр_741_Полей_СОЮЗ-741.pptx

Page — from —
Width

Downloading the document...

For viewing prepared PDF-copy of the presentation. PowerPoint animations and transitions are not played.

Scroll through the pages and change the scale on the viewbar.

Version 1.0 · 25 August 2026

Registry architecture

741 = 13 Field Families × 19 Base Nodes × 3 Status.

Condition: D - Diagnostics; K - Coordination; R is development.

Module code: Sxx-Nxx-D/K/R. Example: S05-N06-D - diagnostics of knowledge in the family "Information and data".

Each module passport contains: code, function, metrics, data, formula, links and validation criteria.

The registry is an author's system model. Index formulas are project operating models and require calibration on empirical data for each application circuit.

Legend of formulas

D: D = 0,40·C + 0,35·Q + 0,25·T. C - completeness of coverage; Q - quality/reliability; T - relevance of data.

K: K = 0,40·A + 0,30·L + 0,30·R. A is consistency; L - Connectivity; R - availability of resources.

R: R = 0,40·G + 0,30·S + 0,30·V. G - increase in result; S - stability; V - reproducibility/scalability.

S01 · Unity and Management

Family function: integrity, subjectivity, and coherent management. Modules: 57 (19 Node × 3 Status).

CodeFunctionIndicatorsDataFormulaConnectionsValidation criteria
S01-N01-DDiagnostics of the "Subject" node in the contour of the management field: to measure the current state and deviations.identification of subjects; completeness of roles; level of responsibility; baselineregisters of subjects; organizational structures; contracts; role profilesD = 0,40·C + 0,35·Q + 0,25·TS01-N01-K, S01-N01-R, S01-N02-D, S13-N01-D, S02-N01-DData coverage ≥ 90%; relevance in the given SLA; We trace the source; recalculation gives a deviation ≤ 5%
S01-N01-KCoordination of the "Subject" node in the contour of the management field: coordinate participants, restrictions and actions.identification of subjects; completeness of roles; level of responsibility; consistency indexregisters of subjects; organizational structures; contracts; role profilesK = 0,40·A + 0,30·L + 0,30·RS01-N01-D, S01-N01-R, S01-N02-K, S13-N01-K, S02-N01-K≥ 80% key actors agreed; roles and solutions fixed; critical conflicts closed; resource gap ≤ 10%
S01-N01-RDevelopment of the "Subject" node in the contour of the management field: change the state and increase the potential.Identification of subjects; completeness of roles; level of responsibility; increase to the baselineregisters of subjects; organizational structures; contracts; role profilesR = 0,40·G + 0,30·S + 0,30·VS01-N01-D, S01-N01-K, S01-N02-R, S13-N01-R, S02-N01-Rtarget effect confirmed by data; improvement against base line ≥ 10% or reach an approved threshold; the effect is stable ≥ 2 Measurement Cycles
S01-N02-DDiagnostics of the "Purpose" node in the contour of the management field: to measure the current state and deviations.Measurability of objectives; consistency of objectives; proportion of objectives achieved; baselinestrategies; KPI; programs; decision protocolsD = 0,40·C + 0,35·Q + 0,25·TS01-N02-K, S01-N02-R, S01-N01-D, S01-N03-D, S13-N02-D, S02-N02-DData coverage ≥ 90%; relevance in the given SLA; We trace the source; recalculation gives a deviation ≤ 5%
S01-N02-KCoordination of the "Purpose" node in the contour of the management field: coordinate participants, restrictions and actions.Measurability of objectives; Coherence of objectives; Percentage of objectives achieved; Coherence indexstrategies; KPI; programs; decision protocolsK = 0,40·A + 0,30·L + 0,30·RS01-N02-D, S01-N02-R, S01-N01-K, S01-N03-K, S13-N02-K, S02-N02-K≥ 80% key actors agreed; roles and solutions fixed; critical conflicts closed; resource gap ≤ 10%
S01-N02-RDevelopment of the “Purpose” node in the contour of the management field: change the state and increase the potential.measurability of the goal; consistency of goals; proportion of goals achieved; increase to the baselinestrategies; KPI; programs; decision protocolsR = 0,40·G + 0,30·S + 0,30·VS01-N02-D, S01-N02-K, S01-N01-R, S01-N03-R, S13-N02-R, S02-N02-Rtarget effect confirmed by data; improvement against base line ≥ 10% or reach an approved threshold; the effect is stable ≥ 2 Measurement Cycles
S01-N03-DDiagnostics of the Border node in the contour of the management field: measure the current state and deviations.clarity of boundaries; number of boundary conflicts; contour stability; baselinecontour maps; regulations; access rights; territorial dataD = 0,40·C + 0,35·Q + 0,25·TS01-N03-K, S01-N03-R, S01-N02-D, S01-N04-D, S13-N03-D, S02-N03-DData coverage ≥ 90%; relevance in the given SLA; We trace the source; recalculation gives a deviation ≤ 5%
S01-N03-KCoordination of the Border node in the contour of the management field: coordinate participants, restrictions and actions.clarity of boundaries; number of boundary conflicts; stability of contour; consistency indexcontour maps; regulations; access rights; territorial dataK = 0,40·A + 0,30·L + 0,30·RS01-N03-D, S01-N03-R, S01-N02-K, S01-N04-K, S13-N03-K, S02-N03-K≥ 80% key actors agreed; roles and solutions fixed; critical conflicts closed; resource gap ≤ 10%
S01-N03-RDevelopment of the Border node in the contour of the management field: change the state and increase the potential.clarity of borders; number of border conflicts; stability of the contour; increment to the baselinecontour maps; regulations; access rights; territorial dataR = 0,40·G + 0,30·S + 0,30·VS01-N03-D, S01-N03-K, S01-N02-R, S01-N04-R, S13-N03-R, S02-N03-Rtarget effect confirmed by data; improvement against base line ≥ 10% or reach an approved threshold; the effect is stable ≥ 2 Measurement Cycles
S01-N04-DDiagnostics of the Resource node in the contour of the management field: measure the current state and deviations.resource availability; deficit/surplus; efficiency of use; baselinebalance of resources; warehouse/ERP; energy balance; capacityD = 0,40·C + 0,35·Q + 0,25·TS01-N04-K, S01-N04-R, S01-N03-D, S01-N05-D, S13-N04-D, S02-N04-DData coverage ≥ 90%; relevance in the given SLA; We trace the source; recalculation gives a deviation ≤ 5%
S01-N04-KCoordination of the Resource node in the contour of the management field: coordinate participants, restrictions and actions.resource availability; deficit/surplus; efficiency of use; consistency indexbalance of resources; warehouse/ERP; energy balance; capacityK = 0,40·A + 0,30·L + 0,30·RS01-N04-D, S01-N04-R, S01-N03-K, S01-N05-K, S13-N04-K, S02-N04-K≥ 80% key actors agreed; roles and solutions fixed; critical conflicts closed; resource gap ≤ 10%
S01-N04-RDevelopment of the Resource node in the contour of the management field: change the state and increase the potential.resource availability; deficit/surplus; efficiency of use; increase to the baselinebalance of resources; warehouse/ERP; energy balance; capacityR = 0,40·G + 0,30·S + 0,30·VS01-N04-D, S01-N04-K, S01-N03-R, S01-N05-R, S13-N04-R, S02-N04-Rtarget effect confirmed by data; improvement against base line ≥ 10% or reach an approved threshold; the effect is stable ≥ 2 Measurement Cycles
S01-N05-DDiagnostics of the Signal node in the contour of the management field: measure the current state and deviations.reliability of signals; signal delay; fraction of false alarms; baselinesensors; event logs; appeals; media/network monitoringD = 0,40·C + 0,35·Q + 0,25·TS01-N05-K, S01-N05-R, S01-N04-D, S01-N06-D, S13-N05-D, S02-N05-DData coverage ≥ 90%; relevance in the given SLA; We trace the source; recalculation gives a deviation ≤ 5%
S01-N05-KCoordination of the node "Signal" in the contour of the management field: to coordinate participants, restrictions and actions.reliability of signals; signal delay; proportion of false alarms; consistency indexsensors; event logs; appeals; media/network monitoringK = 0,40·A + 0,30·L + 0,30·RS01-N05-D, S01-N05-R, S01-N04-K, S01-N06-K, S13-N05-K, S02-N05-K≥ 80% key actors agreed; roles and solutions fixed; critical conflicts closed; resource gap ≤ 10%
S01-N05-RDevelopment of the Signal node in the contour of the management field: change the state and increase the potential.reliability of signals; signal delay; fraction of false alarms; increment to base linesensors; event logs; appeals; media/network monitoringR = 0,40·G + 0,30·S + 0,30·VS01-N05-D, S01-N05-K, S01-N04-R, S01-N06-R, S13-N05-R, S02-N05-Rtarget effect confirmed by data; improvement against base line ≥ 10% or reach an approved threshold; the effect is stable ≥ 2 Measurement Cycles
S01-N06-DDiagnostics of the Knowledge node in the contour of the management field: measure the current state and deviations.completeness of knowledge; relevance of knowledge; level of evidence; baselineResearch; knowledge bases; publications; expertise; archivesD = 0,40·C + 0,35·Q + 0,25·TS01-N06-K, S01-N06-R, S01-N05-D, S01-N07-D, S13-N06-D, S02-N06-DData coverage ≥ 90%; relevance in the given SLA; We trace the source; recalculation gives a deviation ≤ 5%
S01-N06-KCoordination of the Knowledge node in the contour of the management field: coordinate participants, restrictions and actions.completeness of knowledge; relevance of knowledge; level of evidence; consistency indexResearch; knowledge bases; publications; expertise; archivesK = 0,40·A + 0,30·L + 0,30·RS01-N06-D, S01-N06-R, S01-N05-K, S01-N07-K, S13-N06-K, S02-N06-K≥ 80% key actors agreed; roles and solutions fixed; critical conflicts closed; resource gap ≤ 10%
S01-N06-RDevelopment of the Knowledge node in the contour of the management field: change the state and increase the potential.completeness of knowledge; relevance of knowledge; level of evidence; increase to the baselineResearch; knowledge bases; publications; expertise; archivesR = 0,40·G + 0,30·S + 0,30·VS01-N06-D, S01-N06-K, S01-N05-R, S01-N07-R, S13-N06-R, S02-N06-Rtarget effect confirmed by data; improvement against base line ≥ 10% or reach an approved threshold; the effect is stable ≥ 2 Measurement Cycles
S01-N07-DDiagnostics of the "Solution" node in the contour of the management field: measure the current state and deviations.speed of decision; quality of decision; proportion of decisions executed; baselineEDMS; protocols; tasks; approval logsD = 0,40·C + 0,35·Q + 0,25·TS01-N07-K, S01-N07-R, S01-N06-D, S01-N08-D, S13-N07-D, S02-N07-DData coverage ≥ 90%; relevance in the given SLA; We trace the source; recalculation gives a deviation ≤ 5%
S01-N07-KCoordination of the "Solution" node in the contour of the management field: coordinate participants, restrictions and actions.speed of decision; quality of decision; proportion of decisions executed; consistency indexEDMS; protocols; tasks; approval logsK = 0,40·A + 0,30·L + 0,30·RS01-N07-D, S01-N07-R, S01-N06-K, S01-N08-K, S13-N07-K, S02-N07-K≥ 80% key actors agreed; roles and solutions fixed; critical conflicts closed; resource gap ≤ 10%
S01-N07-RDevelopment of the "Solution" node in the contour of the management field: change the state and increase the potential.speed of decision; quality of decision; share of executed decisions; increase to the base lineEDMS; protocols; tasks; approval logsR = 0,40·G + 0,30·S + 0,30·VS01-N07-D, S01-N07-K, S01-N06-R, S01-N08-R, S13-N07-R, S02-N07-Rtarget effect confirmed by data; improvement against base line ≥ 10% or reach an approved threshold; the effect is stable ≥ 2 Measurement Cycles
S01-N08-DDiagnostics of the Action node in the contour of the management field: measure the current state and deviations.intensity of actions; compliance with deadlines; effectiveness of actions; baselinework plans; trackers; production systems; execution actsD = 0,40·C + 0,35·Q + 0,25·TS01-N08-K, S01-N08-R, S01-N07-D, S01-N09-D, S13-N08-D, S02-N08-DData coverage ≥ 90%; relevance in the given SLA; We trace the source; recalculation gives a deviation ≤ 5%
S01-N08-KCoordination of the node "Action" in the contour of the management field: to coordinate participants, restrictions and actions.intensity of actions; compliance with deadlines; effectiveness of actions; consistency indexwork plans; trackers; production systems; execution actsK = 0,40·A + 0,30·L + 0,30·RS01-N08-D, S01-N08-R, S01-N07-K, S01-N09-K, S13-N08-K, S02-N08-K≥ 80% key actors agreed; roles and solutions fixed; critical conflicts closed; resource gap ≤ 10%
S01-N08-RDevelopment of the Action node in the contour of the management field: change the state and increase the potential.intensity of actions; compliance with deadlines; effectiveness of actions; increase to the baselinework plans; trackers; production systems; execution actsR = 0,40·G + 0,30·S + 0,30·VS01-N08-D, S01-N08-K, S01-N07-R, S01-N09-R, S13-N08-R, S02-N08-Rtarget effect confirmed by data; improvement against base line ≥ 10% or reach an approved threshold; the effect is stable ≥ 2 Measurement Cycles
S01-N09-DDiagnostics of the "Feedback" node in the contour of the management field: measure the current state and deviations.frequency of feedback; correction rate; the proportion of closed deviations; baselineuser feedback; audits; telemetry; control measurementsD = 0,40·C + 0,35·Q + 0,25·TS01-N09-K, S01-N09-R, S01-N08-D, S01-N10-D, S13-N09-D, S02-N09-DData coverage ≥ 90%; relevance in the given SLA; We trace the source; recalculation gives a deviation ≤ 5%
S01-N09-KCoordination of the "Feedback" node in the contour of the management field: coordinate participants, restrictions and actions.frequency of feedback; correction rate; proportion of closed deviations; consistency indexuser feedback; audits; telemetry; control measurementsK = 0,40·A + 0,30·L + 0,30·RS01-N09-D, S01-N09-R, S01-N08-K, S01-N10-K, S13-N09-K, S02-N09-K≥ 80% key actors agreed; roles and solutions fixed; critical conflicts closed; resource gap ≤ 10%
S01-N09-RDevelopment of the feedback node in the contour of the management field: change the state and increase the potential.frequency of feedback; correction rate; the proportion of closed deviations; increase to the base lineuser feedback; audits; telemetry; control measurementsR = 0,40·G + 0,30·S + 0,30·VS01-N09-D, S01-N09-K, S01-N08-R, S01-N10-R, S13-N09-R, S02-N09-Rtarget effect confirmed by data; improvement against base line ≥ 10% or reach an approved threshold; the effect is stable ≥ 2 Measurement Cycles
S01-N10-DDiagnostics of the Risk node in the contour of the management field: measure the current state and deviations.probability of risk; extent of damage; residual risk; baselinerisk registers; incidents; insurance events; scenario modelsD = 0,40·C + 0,35·Q + 0,25·TS01-N10-K, S01-N10-R, S01-N09-D, S01-N11-D, S13-N10-D, S02-N10-DData coverage ≥ 90%; relevance in the given SLA; We trace the source; recalculation gives a deviation ≤ 5%
S01-N10-KCoordination of the Risk node in the contour of the management field: coordinate participants, restrictions and actions.probability of risk; extent of damage; residual risk; consistency indexrisk registers; incidents; insurance events; scenario modelsK = 0,40·A + 0,30·L + 0,30·RS01-N10-D, S01-N10-R, S01-N09-K, S01-N11-K, S13-N10-K, S02-N10-K≥ 80% key actors agreed; roles and solutions fixed; critical conflicts closed; resource gap ≤ 10%
S01-N10-RDevelopment of the Risk node in the contour of the management field: change the state and increase the potential.probability of risk; extent of damage; residual risk; increment to baselinerisk registers; incidents; insurance events; scenario modelsR = 0,40·G + 0,30·S + 0,30·VS01-N10-D, S01-N10-K, S01-N09-R, S01-N11-R, S13-N10-R, S02-N10-Rtarget effect confirmed by data; improvement against base line ≥ 10% or reach an approved threshold; the effect is stable ≥ 2 Measurement Cycles
S01-N11-DDiagnostics of the "Trust" node in the contour of the management field: to measure the current state and deviations.trust index; share of confirmed commitments; stability of interactions; baselinehistory of obligations; ratings; contracts; trust surveysD = 0,40·C + 0,35·Q + 0,25·TS01-N11-K, S01-N11-R, S01-N10-D, S01-N12-D, S13-N11-D, S02-N11-DData coverage ≥ 90%; relevance in the given SLA; We trace the source; recalculation gives a deviation ≤ 5%
S01-N11-KCoordination of the “Trust” node in the contour of the management field: coordinate participants, restrictions and actions.trust index; share of confirmed commitments; stability of interactions; consistency indexhistory of obligations; ratings; contracts; trust surveysK = 0,40·A + 0,30·L + 0,30·RS01-N11-D, S01-N11-R, S01-N10-K, S01-N12-K, S13-N11-K, S02-N11-K≥ 80% key actors agreed; roles and solutions fixed; critical conflicts closed; resource gap ≤ 10%
S01-N11-RDevelopment of the trust node in the contour of the management field: change the state and increase the potential.trust index; share of confirmed commitments; stability of interactions; increase to baselinehistory of obligations; ratings; contracts; trust surveysR = 0,40·G + 0,30·S + 0,30·VS01-N11-D, S01-N11-K, S01-N10-R, S01-N12-R, S13-N11-R, S02-N11-Rtarget effect confirmed by data; improvement against base line ≥ 10% or reach an approved threshold; the effect is stable ≥ 2 Measurement Cycles
S01-N12-DDiagnostics of the "Cooperation" node in the contour of the management field: measure the current state and deviations.number of active links; density of cooperation; share of joint projects; baselinegraph links; agreements; consortia; joint projectsD = 0,40·C + 0,35·Q + 0,25·TS01-N12-K, S01-N12-R, S01-N11-D, S01-N13-D, S13-N12-D, S02-N12-DData coverage ≥ 90%; relevance in the given SLA; We trace the source; recalculation gives a deviation ≤ 5%
S01-N12-KCoordination of the "Cooperation" node in the contour of the management field: coordinate participants, restrictions and actions.number of active links; density of cooperation; proportion of joint projects; consistency indexgraph links; agreements; consortia; joint projectsK = 0,40·A + 0,30·L + 0,30·RS01-N12-D, S01-N12-R, S01-N11-K, S01-N13-K, S13-N12-K, S02-N12-K≥ 80% key actors agreed; roles and solutions fixed; critical conflicts closed; resource gap ≤ 10%
S01-N12-RDevelopment of the "Cooperation" node in the contour of the management field: change the state and increase the potential.number of active links; density of cooperation; share of joint projects; increase to the baselinegraph links; agreements; consortia; joint projectsR = 0,40·G + 0,30·S + 0,30·VS01-N12-D, S01-N12-K, S01-N11-R, S01-N13-R, S13-N12-R, S02-N12-Rtarget effect confirmed by data; improvement against base line ≥ 10% or reach an approved threshold; the effect is stable ≥ 2 Measurement Cycles
S01-N13-DDiagnostics of the "Infrastructure" node in the contour of the management field: to measure the current state and deviations.infrastructure availability; reliability; capacity utilization; base lineGIS; object passports; dispatching; operational logsD = 0,40·C + 0,35·Q + 0,25·TS01-N13-K, S01-N13-R, S01-N12-D, S01-N14-D, S13-N13-D, S02-N13-DData coverage ≥ 90%; relevance in the given SLA; We trace the source; recalculation gives a deviation ≤ 5%
S01-N13-KCoordination of the "Infrastructure" node in the contour of the management field: coordinate participants, restrictions and actions.infrastructure availability; reliability; capacity utilization; consistency indexGIS; object passports; dispatching; operational logsK = 0,40·A + 0,30·L + 0,30·RS01-N13-D, S01-N13-R, S01-N12-K, S01-N14-K, S13-N13-K, S02-N13-K≥ 80% key actors agreed; roles and solutions fixed; critical conflicts closed; resource gap ≤ 10%
S01-N13-RDevelopment of the Infrastructure node in the contour of the management field: change the state and increase the potential.infrastructure availability; reliability; capacity utilization; increase to base lineGIS; object passports; dispatching; operational logsR = 0,40·G + 0,30·S + 0,30·VS01-N13-D, S01-N13-K, S01-N12-R, S01-N14-R, S13-N13-R, S02-N13-Rtarget effect confirmed by data; improvement against base line ≥ 10% or reach an approved threshold; the effect is stable ≥ 2 Measurement Cycles
S01-N14-DDiagnostics of the "Standard" node in the contour of the management field: to measure the current state and deviations.standards coverage; compliance; number of deviations; baselinenormative documents; standards; checklists; audit resultsD = 0,40·C + 0,35·Q + 0,25·TS01-N14-K, S01-N14-R, S01-N13-D, S01-N15-D, S13-N14-D, S02-N14-DData coverage ≥ 90%; relevance in the given SLA; We trace the source; recalculation gives a deviation ≤ 5%
S01-N14-KCoordination of the “Standard” node in the contour of the management field: coordinate participants, restrictions and actions.standards coverage; compliance; number of deviations; consistency indexnormative documents; standards; checklists; audit resultsK = 0,40·A + 0,30·L + 0,30·RS01-N14-D, S01-N14-R, S01-N13-K, S01-N15-K, S13-N14-K, S02-N14-K≥ 80% key actors agreed; roles and solutions fixed; critical conflicts closed; resource gap ≤ 10%
S01-N14-RDevelopment of the Standard node in the contour of the management field: change the state and increase the potential.coverage standards; compliance; number of deviations; increase to baselinenormative documents; standards; checklists; audit resultsR = 0,40·G + 0,30·S + 0,30·VS01-N14-D, S01-N14-K, S01-N13-R, S01-N15-R, S13-N14-R, S02-N14-Rtarget effect confirmed by data; improvement against base line ≥ 10% or reach an approved threshold; the effect is stable ≥ 2 Measurement Cycles
S01-N15-DDiagnostics of the "Finance" node in the contour of the management field: measure the current state and deviations.liquidity; resource cost; financial stability; baselineaccounting; budgets; treasury; banking and investment dataD = 0,40·C + 0,35·Q + 0,25·TS01-N15-K, S01-N15-R, S01-N14-D, S01-N16-D, S13-N15-D, S02-N15-DData coverage ≥ 90%; relevance in the given SLA; We trace the source; recalculation gives a deviation ≤ 5%
S01-N15-KCoordination of the "Finance" node in the contour of the management field: coordinate participants, restrictions and actions.liquidity; resource cost; financial stability; consistency indexaccounting; budgets; treasury; banking and investment dataK = 0,40·A + 0,30·L + 0,30·RS01-N15-D, S01-N15-R, S01-N14-K, S01-N16-K, S13-N15-K, S02-N15-K≥ 80% key actors agreed; roles and solutions fixed; critical conflicts closed; resource gap ≤ 10%
S01-N15-RDevelopment of the "Finance" node in the contour of the management field: change the state and increase the potential.liquidity; cost of resource; financial stability; growth to the baselineaccounting; budgets; treasury; banking and investment dataR = 0,40·G + 0,30·S + 0,30·VS01-N15-D, S01-N15-K, S01-N14-R, S01-N16-R, S13-N15-R, S02-N15-Rtarget effect confirmed by data; improvement against base line ≥ 10% or reach an approved threshold; the effect is stable ≥ 2 Measurement Cycles
S01-N16-DDiagnostics of the "Personnel" node in the contour of the management field: measure the current state and deviations.staffing; level of competence; fluidity/continuity; baselineHRIS; competence registers; training; certificationsD = 0,40·C + 0,35·Q + 0,25·TS01-N16-K, S01-N16-R, S01-N15-D, S01-N17-D, S13-N16-D, S02-N16-DData coverage ≥ 90%; relevance in the given SLA; We trace the source; recalculation gives a deviation ≤ 5%
S01-N16-KCoordination of the "Personnel" node in the contour of the management field: coordinate participants, restrictions and actions.staff security; level of competence; fluidity/continuity; consistency indexHRIS; competence registers; training; certificationsK = 0,40·A + 0,30·L + 0,30·RS01-N16-D, S01-N16-R, S01-N15-K, S01-N17-K, S13-N16-K, S02-N16-K≥ 80% key actors agreed; roles and solutions fixed; critical conflicts closed; resource gap ≤ 10%
S01-N16-RDevelopment of the Personnel node in the contour of the management field: change the state and increase the potential.staffing; level of competence; fluidity/continuity; increment to baselineHRIS; competence registers; training; certificationsR = 0,40·G + 0,30·S + 0,30·VS01-N16-D, S01-N16-K, S01-N15-R, S01-N17-R, S13-N16-R, S02-N16-Rtarget effect confirmed by data; improvement against base line ≥ 10% or reach an approved threshold; the effect is stable ≥ 2 Measurement Cycles
S01-N17-DDiagnostics of the "Technology" node in the contour of the management field: to measure the current state and deviations.technology readiness; technology efficiency; scalability; base lineTRL/MRL; patents; tests; digital models; technical cardsD = 0,40·C + 0,35·Q + 0,25·TS01-N17-K, S01-N17-R, S01-N16-D, S01-N18-D, S13-N17-D, S02-N17-DData coverage ≥ 90%; relevance in the given SLA; We trace the source; recalculation gives a deviation ≤ 5%
S01-N17-KCoordination of the "Technology" node in the contour of the management field: coordinate participants, restrictions and actions.technology readiness; technology efficiency; scalability; consistency indexTRL/MRL; patents; tests; digital models; technical cardsK = 0,40·A + 0,30·L + 0,30·RS01-N17-D, S01-N17-R, S01-N16-K, S01-N18-K, S13-N17-K, S02-N17-K≥ 80% key actors agreed; roles and solutions fixed; critical conflicts closed; resource gap ≤ 10%
S01-N17-RDevelopment of the "Technology" node in the contour of the management field: change the state and increase the potential.technology readiness; technology efficiency; scalability; growth to the baselineTRL/MRL; patents; tests; digital models; technical cardsR = 0,40·G + 0,30·S + 0,30·VS01-N17-D, S01-N17-K, S01-N16-R, S01-N18-R, S13-N17-R, S02-N17-Rtarget effect confirmed by data; improvement against base line ≥ 10% or reach an approved threshold; the effect is stable ≥ 2 Measurement Cycles
S01-N18-DDiagnosis of the "Wednesday" node in the contour of the management field: measure the current state and deviations.environmental quality; load on the environment; recovery potential; baselineenvironmental monitoring; GIS; meteo; biocenose observationsD = 0,40·C + 0,35·Q + 0,25·TS01-N18-K, S01-N18-R, S01-N17-D, S01-N19-D, S13-N18-D, S02-N18-DData coverage ≥ 90%; relevance in the given SLA; We trace the source; recalculation gives a deviation ≤ 5%
S01-N18-KCoordination of the node "Environment" in the contour of the management field: to coordinate participants, restrictions and actions.quality of the environment; load on the environment; recovery potential; consistency indexenvironmental monitoring; GIS; meteo; biocenose observationsK = 0,40·A + 0,30·L + 0,30·RS01-N18-D, S01-N18-R, S01-N17-K, S01-N19-K, S13-N18-K, S02-N18-K≥ 80% key actors agreed; roles and solutions fixed; critical conflicts closed; resource gap ≤ 10%
S01-N18-RDevelopment of the “Environment” node in the contour of the management field: change the state and increase the potential.quality of the environment; load on the environment; recovery potential; increase to the baselineenvironmental monitoring; GIS; meteo; biocenose observationsR = 0,40·G + 0,30·S + 0,30·VS01-N18-D, S01-N18-K, S01-N17-R, S01-N19-R, S13-N18-R, S02-N18-Rtarget effect confirmed by data; improvement against base line ≥ 10% or reach an approved threshold; the effect is stable ≥ 2 Measurement Cycles
S01-N19-DDiagnostics of the node "Result" in the contour of the management field: to measure the current state and deviations.result achievement; effect/costs; result stability; baselineKPI; effects statistics; acceptance acts; impact assessmentD = 0,40·C + 0,35·Q + 0,25·TS01-N19-K, S01-N19-R, S01-N18-D, S13-N19-D, S02-N19-DData coverage ≥ 90%; relevance in the given SLA; We trace the source; recalculation gives a deviation ≤ 5%
S01-N19-KCoordination of the node "Result" in the contour of the management field: to coordinate participants, restrictions and actions.achievement of result; effect/costs; sustainability of result; consistency indexKPI; effects statistics; acceptance acts; impact assessmentK = 0,40·A + 0,30·L + 0,30·RS01-N19-D, S01-N19-R, S01-N18-K, S13-N19-K, S02-N19-K≥ 80% key actors agreed; roles and solutions fixed; critical conflicts closed; resource gap ≤ 10%
S01-N19-RDevelopment of the node "Result" in the contour of the management field: to change the state and increase the potential.result achievement; effect/costs; result stability; increase to baselineKPI; effects statistics; acceptance acts; impact assessmentR = 0,40·G + 0,30·S + 0,30·VS01-N19-D, S01-N19-K, S01-N18-R, S13-N19-R, S02-N19-Rtarget effect confirmed by data; improvement against base line ≥ 10% or reach an approved threshold; the effect is stable ≥ 2 Measurement Cycles

S02 · Meaning and Values

The function of the family: purpose, values, identity and social meaning. Modules: 57 (19 Node × 3 Status).

CodeFunctionIndicatorsDataFormulaConnectionsValidation criteria
S02-N01-DDiagnosis of the "Subject" node in the contour of the semantic field: measure the current state and deviations.identification of subjects; completeness of roles; level of responsibility; baselineregisters of subjects; organizational structures; contracts; role profilesD = 0,40·C + 0,35·Q + 0,25·TS02-N01-K, S02-N01-R, S02-N02-D, S01-N01-D, S03-N01-DData coverage ≥ 90%; relevance in the given SLA; We trace the source; recalculation gives a deviation ≤ 5%
S02-N01-KCoordination of the node "Subject" in the contour of the semantic field: to coordinate participants, restrictions and actions.identification of subjects; completeness of roles; level of responsibility; consistency indexregisters of subjects; organizational structures; contracts; role profilesK = 0,40·A + 0,30·L + 0,30·RS02-N01-D, S02-N01-R, S02-N02-K, S01-N01-K, S03-N01-K≥ 80% key actors agreed; roles and solutions fixed; critical conflicts closed; resource gap ≤ 10%
S02-N01-RDevelopment of the node "Subject" in the contour of the semantic field: change the state and increase the potential.Identification of subjects; completeness of roles; level of responsibility; increase to the baselineregisters of subjects; organizational structures; contracts; role profilesR = 0,40·G + 0,30·S + 0,30·VS02-N01-D, S02-N01-K, S02-N02-R, S01-N01-R, S03-N01-Rtarget effect confirmed by data; improvement against base line ≥ 10% or reach an approved threshold; the effect is stable ≥ 2 Measurement Cycles
S02-N02-DDiagnostics of the "Purpose" node in the contour of the semantic field: measure the current state and deviations.Measurability of objectives; consistency of objectives; proportion of objectives achieved; baselinestrategies; KPI; programs; decision protocolsD = 0,40·C + 0,35·Q + 0,25·TS02-N02-K, S02-N02-R, S02-N01-D, S02-N03-D, S01-N02-D, S03-N02-DData coverage ≥ 90%; relevance in the given SLA; We trace the source; recalculation gives a deviation ≤ 5%
S02-N02-KCoordination of the "Purpose" node in the contour of the semantic field: coordinate participants, restrictions and actions.Measurability of objectives; Coherence of objectives; Percentage of objectives achieved; Coherence indexstrategies; KPI; programs; decision protocolsK = 0,40·A + 0,30·L + 0,30·RS02-N02-D, S02-N02-R, S02-N01-K, S02-N03-K, S01-N02-K, S03-N02-K≥ 80% key actors agreed; roles and solutions fixed; critical conflicts closed; resource gap ≤ 10%
S02-N02-RDevelopment of the "Purpose" node in the contour of the semantic field: change the state and increase the potential.measurability of the goal; consistency of goals; proportion of goals achieved; increase to the baselinestrategies; KPI; programs; decision protocolsR = 0,40·G + 0,30·S + 0,30·VS02-N02-D, S02-N02-K, S02-N01-R, S02-N03-R, S01-N02-R, S03-N02-Rtarget effect confirmed by data; improvement against base line ≥ 10% or reach an approved threshold; the effect is stable ≥ 2 Measurement Cycles
S02-N03-DDiagnostics of the Border node in the contour of the semantic field: measure the current state and deviations.clarity of boundaries; number of boundary conflicts; contour stability; baselinecontour maps; regulations; access rights; territorial dataD = 0,40·C + 0,35·Q + 0,25·TS02-N03-K, S02-N03-R, S02-N02-D, S02-N04-D, S01-N03-D, S03-N03-DData coverage ≥ 90%; relevance in the given SLA; We trace the source; recalculation gives a deviation ≤ 5%
S02-N03-KCoordination of the Border node in the contour of the semantic field: coordinate participants, restrictions and actions.clarity of boundaries; number of boundary conflicts; stability of contour; consistency indexcontour maps; regulations; access rights; territorial dataK = 0,40·A + 0,30·L + 0,30·RS02-N03-D, S02-N03-R, S02-N02-K, S02-N04-K, S01-N03-K, S03-N03-K≥ 80% key actors agreed; roles and solutions fixed; critical conflicts closed; resource gap ≤ 10%
S02-N03-RDevelopment of the Border node in the contour of the semantic field: change the state and increase the potential.clarity of borders; number of border conflicts; stability of the contour; increment to the baselinecontour maps; regulations; access rights; territorial dataR = 0,40·G + 0,30·S + 0,30·VS02-N03-D, S02-N03-K, S02-N02-R, S02-N04-R, S01-N03-R, S03-N03-Rtarget effect confirmed by data; improvement against base line ≥ 10% or reach an approved threshold; the effect is stable ≥ 2 Measurement Cycles
S02-N04-DDiagnostics of the Resource node in the contour of the semantic field: measure the current state and deviations.resource availability; deficit/surplus; efficiency of use; baselinebalance of resources; warehouse/ERP; energy balance; capacityD = 0,40·C + 0,35·Q + 0,25·TS02-N04-K, S02-N04-R, S02-N03-D, S02-N05-D, S01-N04-D, S03-N04-DData coverage ≥ 90%; relevance in the given SLA; We trace the source; recalculation gives a deviation ≤ 5%
S02-N04-KCoordination of the Resource node in the contour of the semantic field: coordinate participants, restrictions and actions.resource availability; deficit/surplus; efficiency of use; consistency indexbalance of resources; warehouse/ERP; energy balance; capacityK = 0,40·A + 0,30·L + 0,30·RS02-N04-D, S02-N04-R, S02-N03-K, S02-N05-K, S01-N04-K, S03-N04-K≥ 80% key actors agreed; roles and solutions fixed; critical conflicts closed; resource gap ≤ 10%
S02-N04-RDevelopment of the Resource node in the contour of the semantic field: change the state and increase the potential.resource availability; deficit/surplus; efficiency of use; increase to the baselinebalance of resources; warehouse/ERP; energy balance; capacityR = 0,40·G + 0,30·S + 0,30·VS02-N04-D, S02-N04-K, S02-N03-R, S02-N05-R, S01-N04-R, S03-N04-Rtarget effect confirmed by data; improvement against base line ≥ 10% or reach an approved threshold; the effect is stable ≥ 2 Measurement Cycles
S02-N05-DDiagnostics of the Signal node in the contour of the semantic field: measure the current state and deviations.reliability of signals; signal delay; fraction of false alarms; baselinesensors; event logs; appeals; media/network monitoringD = 0,40·C + 0,35·Q + 0,25·TS02-N05-K, S02-N05-R, S02-N04-D, S02-N06-D, S01-N05-D, S03-N05-DData coverage ≥ 90%; relevance in the given SLA; We trace the source; recalculation gives a deviation ≤ 5%
S02-N05-KCoordination of the node "Signal" in the contour of the semantic field: to coordinate participants, restrictions and actions.reliability of signals; signal delay; proportion of false alarms; consistency indexsensors; event logs; appeals; media/network monitoringK = 0,40·A + 0,30·L + 0,30·RS02-N05-D, S02-N05-R, S02-N04-K, S02-N06-K, S01-N05-K, S03-N05-K≥ 80% key actors agreed; roles and solutions fixed; critical conflicts closed; resource gap ≤ 10%
S02-N05-RDevelopment of the Signal node in the contour of the semantic field: change the state and increase the potential.reliability of signals; signal delay; fraction of false alarms; increment to base linesensors; event logs; appeals; media/network monitoringR = 0,40·G + 0,30·S + 0,30·VS02-N05-D, S02-N05-K, S02-N04-R, S02-N06-R, S01-N05-R, S03-N05-Rtarget effect confirmed by data; improvement against base line ≥ 10% or reach an approved threshold; the effect is stable ≥ 2 Measurement Cycles
S02-N06-DDiagnostics of the Knowledge node in the contour of the semantic field: measure the current state and deviations.completeness of knowledge; relevance of knowledge; level of evidence; baselineResearch; knowledge bases; publications; expertise; archivesD = 0,40·C + 0,35·Q + 0,25·TS02-N06-K, S02-N06-R, S02-N05-D, S02-N07-D, S01-N06-D, S03-N06-DData coverage ≥ 90%; relevance in the given SLA; We trace the source; recalculation gives a deviation ≤ 5%
S02-N06-KCoordination of the node "Knowledge" in the contour of the semantic field: to coordinate participants, restrictions and actions.completeness of knowledge; relevance of knowledge; level of evidence; consistency indexResearch; knowledge bases; publications; expertise; archivesK = 0,40·A + 0,30·L + 0,30·RS02-N06-D, S02-N06-R, S02-N05-K, S02-N07-K, S01-N06-K, S03-N06-K≥ 80% key actors agreed; roles and solutions fixed; critical conflicts closed; resource gap ≤ 10%
S02-N06-RDevelopment of the node "Knowledge" in the contour of the semantic field: change the state and increase the potential.completeness of knowledge; relevance of knowledge; level of evidence; increase to the baselineResearch; knowledge bases; publications; expertise; archivesR = 0,40·G + 0,30·S + 0,30·VS02-N06-D, S02-N06-K, S02-N05-R, S02-N07-R, S01-N06-R, S03-N06-Rtarget effect confirmed by data; improvement against base line ≥ 10% or reach an approved threshold; the effect is stable ≥ 2 Measurement Cycles
S02-N07-DDiagnostics of the node "Solution" in the contour of the semantic field: to measure the current state and deviations.speed of decision; quality of decision; proportion of decisions executed; baselineEDMS; protocols; tasks; approval logsD = 0,40·C + 0,35·Q + 0,25·TS02-N07-K, S02-N07-R, S02-N06-D, S02-N08-D, S01-N07-D, S03-N07-DData coverage ≥ 90%; relevance in the given SLA; We trace the source; recalculation gives a deviation ≤ 5%
S02-N07-KCoordination of the node "Solution" in the contour of the semantic field: to coordinate participants, restrictions and actions.speed of decision; quality of decision; proportion of decisions executed; consistency indexEDMS; protocols; tasks; approval logsK = 0,40·A + 0,30·L + 0,30·RS02-N07-D, S02-N07-R, S02-N06-K, S02-N08-K, S01-N07-K, S03-N07-K≥ 80% key actors agreed; roles and solutions fixed; critical conflicts closed; resource gap ≤ 10%
S02-N07-RDevelopment of the node "Solution" in the contour of the semantic field: change the state and increase the potential.speed of decision; quality of decision; share of executed decisions; increase to the base lineEDMS; protocols; tasks; approval logsR = 0,40·G + 0,30·S + 0,30·VS02-N07-D, S02-N07-K, S02-N06-R, S02-N08-R, S01-N07-R, S03-N07-Rtarget effect confirmed by data; improvement against base line ≥ 10% or reach an approved threshold; the effect is stable ≥ 2 Measurement Cycles
S02-N08-DDiagnostics of the "Action" node in the contour of the semantic field: measure the current state and deviations.intensity of actions; compliance with deadlines; effectiveness of actions; baselinework plans; trackers; production systems; execution actsD = 0,40·C + 0,35·Q + 0,25·TS02-N08-K, S02-N08-R, S02-N07-D, S02-N09-D, S01-N08-D, S03-N08-DData coverage ≥ 90%; relevance in the given SLA; We trace the source; recalculation gives a deviation ≤ 5%
S02-N08-KCoordination of the node "Action" in the contour of the semantic field: to coordinate participants, restrictions and actions.intensity of actions; compliance with deadlines; effectiveness of actions; consistency indexwork plans; trackers; production systems; execution actsK = 0,40·A + 0,30·L + 0,30·RS02-N08-D, S02-N08-R, S02-N07-K, S02-N09-K, S01-N08-K, S03-N08-K≥ 80% key actors agreed; roles and solutions fixed; critical conflicts closed; resource gap ≤ 10%
S02-N08-RDevelopment of the node "Action" in the contour of the semantic field: change the state and increase the potential.intensity of actions; compliance with deadlines; effectiveness of actions; increase to the baselinework plans; trackers; production systems; execution actsR = 0,40·G + 0,30·S + 0,30·VS02-N08-D, S02-N08-K, S02-N07-R, S02-N09-R, S01-N08-R, S03-N08-Rtarget effect confirmed by data; improvement against base line ≥ 10% or reach an approved threshold; the effect is stable ≥ 2 Measurement Cycles
S02-N09-DDiagnosis of the "Feedback" node in the contour of the semantic field: measure the current state and deviations.frequency of feedback; correction rate; the proportion of closed deviations; baselineuser feedback; audits; telemetry; control measurementsD = 0,40·C + 0,35·Q + 0,25·TS02-N09-K, S02-N09-R, S02-N08-D, S02-N10-D, S01-N09-D, S03-N09-DData coverage ≥ 90%; relevance in the given SLA; We trace the source; recalculation gives a deviation ≤ 5%
S02-N09-KCoordination of the "Feedback" node in the contour of the semantic field: coordinate participants, restrictions and actions.frequency of feedback; correction rate; proportion of closed deviations; consistency indexuser feedback; audits; telemetry; control measurementsK = 0,40·A + 0,30·L + 0,30·RS02-N09-D, S02-N09-R, S02-N08-K, S02-N10-K, S01-N09-K, S03-N09-K≥ 80% key actors agreed; roles and solutions fixed; critical conflicts closed; resource gap ≤ 10%
S02-N09-RDevelopment of the feedback node in the contour of the semantic field: change the state and increase the potential.frequency of feedback; correction rate; the proportion of closed deviations; increase to the base lineuser feedback; audits; telemetry; control measurementsR = 0,40·G + 0,30·S + 0,30·VS02-N09-D, S02-N09-K, S02-N08-R, S02-N10-R, S01-N09-R, S03-N09-Rtarget effect confirmed by data; improvement against base line ≥ 10% or reach an approved threshold; the effect is stable ≥ 2 Measurement Cycles
S02-N10-DDiagnosis of the "Risk" node in the contour of the semantic field: measure the current state and deviations.probability of risk; extent of damage; residual risk; baselinerisk registers; incidents; insurance events; scenario modelsD = 0,40·C + 0,35·Q + 0,25·TS02-N10-K, S02-N10-R, S02-N09-D, S02-N11-D, S01-N10-D, S03-N10-DData coverage ≥ 90%; relevance in the given SLA; We trace the source; recalculation gives a deviation ≤ 5%
S02-N10-KCoordination of the node "Risk" in the contour of the semantic field: to coordinate participants, restrictions and actions.probability of risk; extent of damage; residual risk; consistency indexrisk registers; incidents; insurance events; scenario modelsK = 0,40·A + 0,30·L + 0,30·RS02-N10-D, S02-N10-R, S02-N09-K, S02-N11-K, S01-N10-K, S03-N10-K≥ 80% key actors agreed; roles and solutions fixed; critical conflicts closed; resource gap ≤ 10%
S02-N10-RDevelopment of the Risk node in the contour of the semantic field: change the state and increase the potential.probability of risk; extent of damage; residual risk; increment to baselinerisk registers; incidents; insurance events; scenario modelsR = 0,40·G + 0,30·S + 0,30·VS02-N10-D, S02-N10-K, S02-N09-R, S02-N11-R, S01-N10-R, S03-N10-Rtarget effect confirmed by data; improvement against base line ≥ 10% or reach an approved threshold; the effect is stable ≥ 2 Measurement Cycles
S02-N11-DDiagnostics of the "Trust" node in the contour of the semantic field: measure the current state and deviations.trust index; share of confirmed commitments; stability of interactions; baselinehistory of obligations; ratings; contracts; trust surveysD = 0,40·C + 0,35·Q + 0,25·TS02-N11-K, S02-N11-R, S02-N10-D, S02-N12-D, S01-N11-D, S03-N11-DData coverage ≥ 90%; relevance in the given SLA; We trace the source; recalculation gives a deviation ≤ 5%
S02-N11-KCoordination of the "Trust" node in the contour of the semantic field: coordinate participants, restrictions and actions.trust index; share of confirmed commitments; stability of interactions; consistency indexhistory of obligations; ratings; contracts; trust surveysK = 0,40·A + 0,30·L + 0,30·RS02-N11-D, S02-N11-R, S02-N10-K, S02-N12-K, S01-N11-K, S03-N11-K≥ 80% key actors agreed; roles and solutions fixed; critical conflicts closed; resource gap ≤ 10%
S02-N11-RThe development of the "Trust" node in the contour of the semantic field: change the state and increase the potential.trust index; share of confirmed commitments; stability of interactions; increase to baselinehistory of obligations; ratings; contracts; trust surveysR = 0,40·G + 0,30·S + 0,30·VS02-N11-D, S02-N11-K, S02-N10-R, S02-N12-R, S01-N11-R, S03-N11-Rtarget effect confirmed by data; improvement against base line ≥ 10% or reach an approved threshold; the effect is stable ≥ 2 Measurement Cycles
S02-N12-DDiagnosis of the "Cooperation" node in the contour of the semantic field: measure the current state and deviations.number of active links; density of cooperation; share of joint projects; baselinegraph links; agreements; consortia; joint projectsD = 0,40·C + 0,35·Q + 0,25·TS02-N12-K, S02-N12-R, S02-N11-D, S02-N13-D, S01-N12-D, S03-N12-DData coverage ≥ 90%; relevance in the given SLA; We trace the source; recalculation gives a deviation ≤ 5%
S02-N12-KCoordination of the "Cooperation" node in the contour of the semantic field: coordinate participants, restrictions and actions.number of active links; density of cooperation; proportion of joint projects; consistency indexgraph links; agreements; consortia; joint projectsK = 0,40·A + 0,30·L + 0,30·RS02-N12-D, S02-N12-R, S02-N11-K, S02-N13-K, S01-N12-K, S03-N12-K≥ 80% key actors agreed; roles and solutions fixed; critical conflicts closed; resource gap ≤ 10%
S02-N12-RDevelopment of the "Cooperation" node in the contour of the semantic field: change the state and increase the potential.number of active links; density of cooperation; share of joint projects; increase to the baselinegraph links; agreements; consortia; joint projectsR = 0,40·G + 0,30·S + 0,30·VS02-N12-D, S02-N12-K, S02-N11-R, S02-N13-R, S01-N12-R, S03-N12-Rtarget effect confirmed by data; improvement against base line ≥ 10% or reach an approved threshold; the effect is stable ≥ 2 Measurement Cycles
S02-N13-DDiagnostics of the node "Infrastructure" in the contour of the semantic field: to measure the current state and deviations.infrastructure availability; reliability; capacity utilization; base lineGIS; object passports; dispatching; operational logsD = 0,40·C + 0,35·Q + 0,25·TS02-N13-K, S02-N13-R, S02-N12-D, S02-N14-D, S01-N13-D, S03-N13-DData coverage ≥ 90%; relevance in the given SLA; We trace the source; recalculation gives a deviation ≤ 5%
S02-N13-KCoordination of the node "Infrastructure" in the contour of the semantic field: to coordinate participants, restrictions and actions.infrastructure availability; reliability; capacity utilization; consistency indexGIS; object passports; dispatching; operational logsK = 0,40·A + 0,30·L + 0,30·RS02-N13-D, S02-N13-R, S02-N12-K, S02-N14-K, S01-N13-K, S03-N13-K≥ 80% key actors agreed; roles and solutions fixed; critical conflicts closed; resource gap ≤ 10%
S02-N13-RDevelopment of the node "Infrastructure" in the contour of the semantic field: change the state and increase the potential.infrastructure availability; reliability; capacity utilization; increase to base lineGIS; object passports; dispatching; operational logsR = 0,40·G + 0,30·S + 0,30·VS02-N13-D, S02-N13-K, S02-N12-R, S02-N14-R, S01-N13-R, S03-N13-Rtarget effect confirmed by data; improvement against base line ≥ 10% or reach an approved threshold; the effect is stable ≥ 2 Measurement Cycles
S02-N14-DDiagnostics of the node "Standard" in the contour of the semantic field: measure the current state and deviations.standards coverage; compliance; number of deviations; baselinenormative documents; standards; checklists; audit resultsD = 0,40·C + 0,35·Q + 0,25·TS02-N14-K, S02-N14-R, S02-N13-D, S02-N15-D, S01-N14-D, S03-N14-DData coverage ≥ 90%; relevance in the given SLA; We trace the source; recalculation gives a deviation ≤ 5%
S02-N14-KCoordination of the node "Standard" in the contour of the semantic field: to coordinate participants, restrictions and actions.standards coverage; compliance; number of deviations; consistency indexnormative documents; standards; checklists; audit resultsK = 0,40·A + 0,30·L + 0,30·RS02-N14-D, S02-N14-R, S02-N13-K, S02-N15-K, S01-N14-K, S03-N14-K≥ 80% key actors agreed; roles and solutions fixed; critical conflicts closed; resource gap ≤ 10%
S02-N14-RDevelopment of the node "Standard" in the contour of the semantic field: change the state and increase the potential.coverage standards; compliance; number of deviations; increase to baselinenormative documents; standards; checklists; audit resultsR = 0,40·G + 0,30·S + 0,30·VS02-N14-D, S02-N14-K, S02-N13-R, S02-N15-R, S01-N14-R, S03-N14-Rtarget effect confirmed by data; improvement against base line ≥ 10% or reach an approved threshold; the effect is stable ≥ 2 Measurement Cycles
S02-N15-DDiagnosis of the "Finance" node in the contour of the semantic field: measure the current state and deviations.liquidity; resource cost; financial stability; baselineaccounting; budgets; treasury; banking and investment dataD = 0,40·C + 0,35·Q + 0,25·TS02-N15-K, S02-N15-R, S02-N14-D, S02-N16-D, S01-N15-D, S03-N15-DData coverage ≥ 90%; relevance in the given SLA; We trace the source; recalculation gives a deviation ≤ 5%
S02-N15-KCoordination of the "Finance" node in the contour of the semantic field: coordinate participants, restrictions and actions.liquidity; resource cost; financial stability; consistency indexaccounting; budgets; treasury; banking and investment dataK = 0,40·A + 0,30·L + 0,30·RS02-N15-D, S02-N15-R, S02-N14-K, S02-N16-K, S01-N15-K, S03-N15-K≥ 80% key actors agreed; roles and solutions fixed; critical conflicts closed; resource gap ≤ 10%
S02-N15-RDevelopment of the "Finance" node in the contour of the semantic field: change the state and increase the potential.liquidity; cost of resource; financial stability; growth to the baselineaccounting; budgets; treasury; banking and investment dataR = 0,40·G + 0,30·S + 0,30·VS02-N15-D, S02-N15-K, S02-N14-R, S02-N16-R, S01-N15-R, S03-N15-Rtarget effect confirmed by data; improvement against base line ≥ 10% or reach an approved threshold; the effect is stable ≥ 2 Measurement Cycles
S02-N16-DDiagnosis of the "Personnel" node in the contour of the semantic field: measure the current state and deviations.staffing; level of competence; fluidity/continuity; baselineHRIS; competence registers; training; certificationsD = 0,40·C + 0,35·Q + 0,25·TS02-N16-K, S02-N16-R, S02-N15-D, S02-N17-D, S01-N16-D, S03-N16-DData coverage ≥ 90%; relevance in the given SLA; We trace the source; recalculation gives a deviation ≤ 5%
S02-N16-KCoordination of the "Personnel" node in the contour of the semantic field: coordinate participants, restrictions and actions.staff security; level of competence; fluidity/continuity; consistency indexHRIS; competence registers; training; certificationsK = 0,40·A + 0,30·L + 0,30·RS02-N16-D, S02-N16-R, S02-N15-K, S02-N17-K, S01-N16-K, S03-N16-K≥ 80% key actors agreed; roles and solutions fixed; critical conflicts closed; resource gap ≤ 10%
S02-N16-RDevelopment of the "Personnel" node in the contour of the semantic field: change the state and increase the potential.staffing; level of competence; fluidity/continuity; increment to baselineHRIS; competence registers; training; certificationsR = 0,40·G + 0,30·S + 0,30·VS02-N16-D, S02-N16-K, S02-N15-R, S02-N17-R, S01-N16-R, S03-N16-Rtarget effect confirmed by data; improvement against base line ≥ 10% or reach an approved threshold; the effect is stable ≥ 2 Measurement Cycles
S02-N17-DDiagnostics of the node "Technology" in the contour of the semantic field: to measure the current state and deviations.technology readiness; technology efficiency; scalability; base lineTRL/MRL; patents; tests; digital models; technical cardsD = 0,40·C + 0,35·Q + 0,25·TS02-N17-K, S02-N17-R, S02-N16-D, S02-N18-D, S01-N17-D, S03-N17-DData coverage ≥ 90%; relevance in the given SLA; We trace the source; recalculation gives a deviation ≤ 5%
S02-N17-KCoordination of the node "Technology" in the contour of the semantic field: to coordinate participants, restrictions and actions.technology readiness; technology efficiency; scalability; consistency indexTRL/MRL; patents; tests; digital models; technical cardsK = 0,40·A + 0,30·L + 0,30·RS02-N17-D, S02-N17-R, S02-N16-K, S02-N18-K, S01-N17-K, S03-N17-K≥ 80% key actors agreed; roles and solutions fixed; critical conflicts closed; resource gap ≤ 10%
S02-N17-RDevelopment of the "Technology" node in the contour of the semantic field: change the state and increase the potential.technology readiness; technology efficiency; scalability; growth to the baselineTRL/MRL; patents; tests; digital models; technical cardsR = 0,40·G + 0,30·S + 0,30·VS02-N17-D, S02-N17-K, S02-N16-R, S02-N18-R, S01-N17-R, S03-N17-Rtarget effect confirmed by data; improvement against base line ≥ 10% or reach an approved threshold; the effect is stable ≥ 2 Measurement Cycles
S02-N18-DDiagnosis of the node "Wednesday" in the contour of the semantic field: to measure the current state and deviations.environmental quality; load on the environment; recovery potential; baselineenvironmental monitoring; GIS; meteo; biocenose observationsD = 0,40·C + 0,35·Q + 0,25·TS02-N18-K, S02-N18-R, S02-N17-D, S02-N19-D, S01-N18-D, S03-N18-DData coverage ≥ 90%; relevance in the given SLA; We trace the source; recalculation gives a deviation ≤ 5%
S02-N18-KCoordination of the node "Wednesday" in the contour of the semantic field: to coordinate participants, restrictions and actions.quality of the environment; load on the environment; recovery potential; consistency indexenvironmental monitoring; GIS; meteo; biocenose observationsK = 0,40·A + 0,30·L + 0,30·RS02-N18-D, S02-N18-R, S02-N17-K, S02-N19-K, S01-N18-K, S03-N18-K≥ 80% key actors agreed; roles and solutions fixed; critical conflicts closed; resource gap ≤ 10%
S02-N18-RDevelopment of the node "Environment" in the contour of the semantic field: change the state and increase the potential.quality of the environment; load on the environment; recovery potential; increase to the baselineenvironmental monitoring; GIS; meteo; biocenose observationsR = 0,40·G + 0,30·S + 0,30·VS02-N18-D, S02-N18-K, S02-N17-R, S02-N19-R, S01-N18-R, S03-N18-Rtarget effect confirmed by data; improvement against base line ≥ 10% or reach an approved threshold; the effect is stable ≥ 2 Measurement Cycles
S02-N19-DDiagnostics of the node "Result" in the contour of the semantic field: measure the current state and deviations.result achievement; effect/costs; result stability; baselineKPI; effects statistics; acceptance acts; impact assessmentD = 0,40·C + 0,35·Q + 0,25·TS02-N19-K, S02-N19-R, S02-N18-D, S01-N19-D, S03-N19-DData coverage ≥ 90%; relevance in the given SLA; We trace the source; recalculation gives a deviation ≤ 5%
S02-N19-KCoordination of the node "Result" in the contour of the semantic field: to coordinate participants, restrictions and actions.achievement of result; effect/costs; sustainability of result; consistency indexKPI; effects statistics; acceptance acts; impact assessmentK = 0,40·A + 0,30·L + 0,30·RS02-N19-D, S02-N19-R, S02-N18-K, S01-N19-K, S03-N19-K≥ 80% key actors agreed; roles and solutions fixed; critical conflicts closed; resource gap ≤ 10%
S02-N19-RDevelopment of the node "Result" in the contour of the semantic field: change the state and increase the potential.result achievement; effect/costs; result stability; increase to baselineKPI; effects statistics; acceptance acts; impact assessmentR = 0,40·G + 0,30·S + 0,30·VS02-N19-D, S02-N19-K, S02-N18-R, S01-N19-R, S03-N19-Rtarget effect confirmed by data; improvement against base line ≥ 10% or reach an approved threshold; the effect is stable ≥ 2 Measurement Cycles

S03 · Time and Cycles

Family Function: Rhythms, Stages, Timing, Scenarios and Development Cycles. Modules: 57 (19 Node × 3 Status).

CodeFunctionIndicatorsDataFormulaConnectionsValidation criteria
S03-N01-DDiagnosis of the "Subject" node in the time field contour: measure the current state and deviations.identification of subjects; completeness of roles; level of responsibility; baselineregisters of subjects; organizational structures; contracts; role profilesD = 0,40·C + 0,35·Q + 0,25·TS03-N01-K, S03-N01-R, S03-N02-D, S02-N01-D, S04-N01-DData coverage ≥ 90%; relevance in the given SLA; We trace the source; recalculation gives a deviation ≤ 5%
S03-N01-KCoordination of the node "Subject" in the contour of the time field: agree on participants, restrictions and actions.identification of subjects; completeness of roles; level of responsibility; consistency indexregisters of subjects; organizational structures; contracts; role profilesK = 0,40·A + 0,30·L + 0,30·RS03-N01-D, S03-N01-R, S03-N02-K, S02-N01-K, S04-N01-K≥ 80% key actors agreed; roles and solutions fixed; critical conflicts closed; resource gap ≤ 10%
S03-N01-RDevelopment of the subject node in the contour of the time field: change the state and increase the potential.Identification of subjects; completeness of roles; level of responsibility; increase to the baselineregisters of subjects; organizational structures; contracts; role profilesR = 0,40·G + 0,30·S + 0,30·VS03-N01-D, S03-N01-K, S03-N02-R, S02-N01-R, S04-N01-Rtarget effect confirmed by data; improvement against base line ≥ 10% or reach an approved threshold; the effect is stable ≥ 2 Measurement Cycles
S03-N02-DDiagnostics of the "Purpose" node in the time field contour: measure the current state and deviations.Measurability of objectives; consistency of objectives; proportion of objectives achieved; baselinestrategies; KPI; programs; decision protocolsD = 0,40·C + 0,35·Q + 0,25·TS03-N02-K, S03-N02-R, S03-N01-D, S03-N03-D, S02-N02-D, S04-N02-DData coverage ≥ 90%; relevance in the given SLA; We trace the source; recalculation gives a deviation ≤ 5%
S03-N02-KCoordination of the "Purpose" node in the contour of the time field: coordinate participants, restrictions and actions.Measurability of objectives; Coherence of objectives; Percentage of objectives achieved; Coherence indexstrategies; KPI; programs; decision protocolsK = 0,40·A + 0,30·L + 0,30·RS03-N02-D, S03-N02-R, S03-N01-K, S03-N03-K, S02-N02-K, S04-N02-K≥ 80% key actors agreed; roles and solutions fixed; critical conflicts closed; resource gap ≤ 10%
S03-N02-RDevelopment of the "Target" node in the contour of the time field: change the state and increase the potential.measurability of the goal; consistency of goals; proportion of goals achieved; increase to the baselinestrategies; KPI; programs; decision protocolsR = 0,40·G + 0,30·S + 0,30·VS03-N02-D, S03-N02-K, S03-N01-R, S03-N03-R, S02-N02-R, S04-N02-Rtarget effect confirmed by data; improvement against base line ≥ 10% or reach an approved threshold; the effect is stable ≥ 2 Measurement Cycles
S03-N03-DDiagnostics of the Border node in the time field contour: measure the current state and deviations.clarity of boundaries; number of boundary conflicts; contour stability; baselinecontour maps; regulations; access rights; territorial dataD = 0,40·C + 0,35·Q + 0,25·TS03-N03-K, S03-N03-R, S03-N02-D, S03-N04-D, S02-N03-D, S04-N03-DData coverage ≥ 90%; relevance in the given SLA; We trace the source; recalculation gives a deviation ≤ 5%
S03-N03-KCoordination of the Border node in the contour of the time field: coordinate participants, restrictions and actions.clarity of boundaries; number of boundary conflicts; stability of contour; consistency indexcontour maps; regulations; access rights; territorial dataK = 0,40·A + 0,30·L + 0,30·RS03-N03-D, S03-N03-R, S03-N02-K, S03-N04-K, S02-N03-K, S04-N03-K≥ 80% key actors agreed; roles and solutions fixed; critical conflicts closed; resource gap ≤ 10%
S03-N03-RDevelopment of the Border node in the contour of the time field: change the state and increase the potential.clarity of borders; number of border conflicts; stability of the contour; increment to the baselinecontour maps; regulations; access rights; territorial dataR = 0,40·G + 0,30·S + 0,30·VS03-N03-D, S03-N03-K, S03-N02-R, S03-N04-R, S02-N03-R, S04-N03-Rtarget effect confirmed by data; improvement against base line ≥ 10% or reach an approved threshold; the effect is stable ≥ 2 Measurement Cycles
S03-N04-DDiagnosis of the Resource node in the time field contour: measure the current state and deviations.resource availability; deficit/surplus; efficiency of use; baselinebalance of resources; warehouse/ERP; energy balance; capacityD = 0,40·C + 0,35·Q + 0,25·TS03-N04-K, S03-N04-R, S03-N03-D, S03-N05-D, S02-N04-D, S04-N04-DData coverage ≥ 90%; relevance in the given SLA; We trace the source; recalculation gives a deviation ≤ 5%
S03-N04-KCoordination of the Resource node in the contour of the time field: coordinate participants, restrictions and actions.resource availability; deficit/surplus; efficiency of use; consistency indexbalance of resources; warehouse/ERP; energy balance; capacityK = 0,40·A + 0,30·L + 0,30·RS03-N04-D, S03-N04-R, S03-N03-K, S03-N05-K, S02-N04-K, S04-N04-K≥ 80% key actors agreed; roles and solutions fixed; critical conflicts closed; resource gap ≤ 10%
S03-N04-RDevelopment of the Resource node in the contour of the time field: change the state and increase the potential.resource availability; deficit/surplus; efficiency of use; increase to the baselinebalance of resources; warehouse/ERP; energy balance; capacityR = 0,40·G + 0,30·S + 0,30·VS03-N04-D, S03-N04-K, S03-N03-R, S03-N05-R, S02-N04-R, S04-N04-Rtarget effect confirmed by data; improvement against base line ≥ 10% or reach an approved threshold; the effect is stable ≥ 2 Measurement Cycles
S03-N05-DDiagnostics of the Signal node in the time field contour: measure the current state and deviations.reliability of signals; signal delay; fraction of false alarms; baselinesensors; event logs; appeals; media/network monitoringD = 0,40·C + 0,35·Q + 0,25·TS03-N05-K, S03-N05-R, S03-N04-D, S03-N06-D, S02-N05-D, S04-N05-DData coverage ≥ 90%; relevance in the given SLA; We trace the source; recalculation gives a deviation ≤ 5%
S03-N05-KCoordination of the node "Signal" in the contour of the time field: to coordinate participants, restrictions and actions.reliability of signals; signal delay; proportion of false alarms; consistency indexsensors; event logs; appeals; media/network monitoringK = 0,40·A + 0,30·L + 0,30·RS03-N05-D, S03-N05-R, S03-N04-K, S03-N06-K, S02-N05-K, S04-N05-K≥ 80% key actors agreed; roles and solutions fixed; critical conflicts closed; resource gap ≤ 10%
S03-N05-RDevelopment of the Signal node in the time field contour: change the state and increase the potential.reliability of signals; signal delay; fraction of false alarms; increment to base linesensors; event logs; appeals; media/network monitoringR = 0,40·G + 0,30·S + 0,30·VS03-N05-D, S03-N05-K, S03-N04-R, S03-N06-R, S02-N05-R, S04-N05-Rtarget effect confirmed by data; improvement against base line ≥ 10% or reach an approved threshold; the effect is stable ≥ 2 Measurement Cycles
S03-N06-DDiagnosis of the Knowledge node in the time field contour: measure the current state and deviations.completeness of knowledge; relevance of knowledge; level of evidence; baselineResearch; knowledge bases; publications; expertise; archivesD = 0,40·C + 0,35·Q + 0,25·TS03-N06-K, S03-N06-R, S03-N05-D, S03-N07-D, S02-N06-D, S04-N06-DData coverage ≥ 90%; relevance in the given SLA; We trace the source; recalculation gives a deviation ≤ 5%
S03-N06-KCoordination of the node "Knowledge" in the contour of the time field: coordinate participants, restrictions and actions.completeness of knowledge; relevance of knowledge; level of evidence; consistency indexResearch; knowledge bases; publications; expertise; archivesK = 0,40·A + 0,30·L + 0,30·RS03-N06-D, S03-N06-R, S03-N05-K, S03-N07-K, S02-N06-K, S04-N06-K≥ 80% key actors agreed; roles and solutions fixed; critical conflicts closed; resource gap ≤ 10%
S03-N06-RDevelopment of the Knowledge node in the time field contour: change the state and increase the potential.completeness of knowledge; relevance of knowledge; level of evidence; increase to the baselineResearch; knowledge bases; publications; expertise; archivesR = 0,40·G + 0,30·S + 0,30·VS03-N06-D, S03-N06-K, S03-N05-R, S03-N07-R, S02-N06-R, S04-N06-Rtarget effect confirmed by data; improvement against base line ≥ 10% or reach an approved threshold; the effect is stable ≥ 2 Measurement Cycles
S03-N07-DDiagnosis of the "Solution" node in the time field contour: measure the current state and deviations.speed of decision; quality of decision; proportion of decisions executed; baselineEDMS; protocols; tasks; approval logsD = 0,40·C + 0,35·Q + 0,25·TS03-N07-K, S03-N07-R, S03-N06-D, S03-N08-D, S02-N07-D, S04-N07-DData coverage ≥ 90%; relevance in the given SLA; We trace the source; recalculation gives a deviation ≤ 5%
S03-N07-KCoordination of the node "Solution" in the contour of the time field: to coordinate participants, restrictions and actions.speed of decision; quality of decision; proportion of decisions executed; consistency indexEDMS; protocols; tasks; approval logsK = 0,40·A + 0,30·L + 0,30·RS03-N07-D, S03-N07-R, S03-N06-K, S03-N08-K, S02-N07-K, S04-N07-K≥ 80% key actors agreed; roles and solutions fixed; critical conflicts closed; resource gap ≤ 10%
S03-N07-RDevelopment of the "Solution" node in the contour of the time field: change the state and increase the potential.speed of decision; quality of decision; share of executed decisions; increase to the base lineEDMS; protocols; tasks; approval logsR = 0,40·G + 0,30·S + 0,30·VS03-N07-D, S03-N07-K, S03-N06-R, S03-N08-R, S02-N07-R, S04-N07-Rtarget effect confirmed by data; improvement against base line ≥ 10% or reach an approved threshold; the effect is stable ≥ 2 Measurement Cycles
S03-N08-DDiagnostics of the Action node in the time field contour: measure the current state and deviations.intensity of actions; compliance with deadlines; effectiveness of actions; baselinework plans; trackers; production systems; execution actsD = 0,40·C + 0,35·Q + 0,25·TS03-N08-K, S03-N08-R, S03-N07-D, S03-N09-D, S02-N08-D, S04-N08-DData coverage ≥ 90%; relevance in the given SLA; We trace the source; recalculation gives a deviation ≤ 5%
S03-N08-KCoordination of the "Action" node in the contour of the time field: coordinate participants, restrictions and actions.intensity of actions; compliance with deadlines; effectiveness of actions; consistency indexwork plans; trackers; production systems; execution actsK = 0,40·A + 0,30·L + 0,30·RS03-N08-D, S03-N08-R, S03-N07-K, S03-N09-K, S02-N08-K, S04-N08-K≥ 80% key actors agreed; roles and solutions fixed; critical conflicts closed; resource gap ≤ 10%
S03-N08-RDevelopment of the Action node in the time field contour: change the state and increase the potential.intensity of actions; compliance with deadlines; effectiveness of actions; increase to the baselinework plans; trackers; production systems; execution actsR = 0,40·G + 0,30·S + 0,30·VS03-N08-D, S03-N08-K, S03-N07-R, S03-N09-R, S02-N08-R, S04-N08-Rtarget effect confirmed by data; improvement against base line ≥ 10% or reach an approved threshold; the effect is stable ≥ 2 Measurement Cycles
S03-N09-DDiagnosis of the "Feedback" node in the time field contour: measure the current state and deviations.frequency of feedback; correction rate; the proportion of closed deviations; baselineuser feedback; audits; telemetry; control measurementsD = 0,40·C + 0,35·Q + 0,25·TS03-N09-K, S03-N09-R, S03-N08-D, S03-N10-D, S02-N09-D, S04-N09-DData coverage ≥ 90%; relevance in the given SLA; We trace the source; recalculation gives a deviation ≤ 5%
S03-N09-KCoordination of the "Feedback" node in the contour of the time field: coordinate participants, restrictions and actions.frequency of feedback; correction rate; proportion of closed deviations; consistency indexuser feedback; audits; telemetry; control measurementsK = 0,40·A + 0,30·L + 0,30·RS03-N09-D, S03-N09-R, S03-N08-K, S03-N10-K, S02-N09-K, S04-N09-K≥ 80% key actors agreed; roles and solutions fixed; critical conflicts closed; resource gap ≤ 10%
S03-N09-RDevelopment of the feedback node in the time field contour: change the state and increase the potential.frequency of feedback; correction rate; the proportion of closed deviations; increase to the base lineuser feedback; audits; telemetry; control measurementsR = 0,40·G + 0,30·S + 0,30·VS03-N09-D, S03-N09-K, S03-N08-R, S03-N10-R, S02-N09-R, S04-N09-Rtarget effect confirmed by data; improvement against base line ≥ 10% or reach an approved threshold; the effect is stable ≥ 2 Measurement Cycles
S03-N10-DDiagnosis of the Risk node in the time field contour: measure the current state and deviations.probability of risk; extent of damage; residual risk; baselinerisk registers; incidents; insurance events; scenario modelsD = 0,40·C + 0,35·Q + 0,25·TS03-N10-K, S03-N10-R, S03-N09-D, S03-N11-D, S02-N10-D, S04-N10-DData coverage ≥ 90%; relevance in the given SLA; We trace the source; recalculation gives a deviation ≤ 5%
S03-N10-KCoordination of the node "Risk" in the contour of the time field: to coordinate participants, restrictions and actions.probability of risk; extent of damage; residual risk; consistency indexrisk registers; incidents; insurance events; scenario modelsK = 0,40·A + 0,30·L + 0,30·RS03-N10-D, S03-N10-R, S03-N09-K, S03-N11-K, S02-N10-K, S04-N10-K≥ 80% key actors agreed; roles and solutions fixed; critical conflicts closed; resource gap ≤ 10%
S03-N10-RDevelopment of the Risk node in the contour of the time field: change the state and increase the potential.probability of risk; extent of damage; residual risk; increment to baselinerisk registers; incidents; insurance events; scenario modelsR = 0,40·G + 0,30·S + 0,30·VS03-N10-D, S03-N10-K, S03-N09-R, S03-N11-R, S02-N10-R, S04-N10-Rtarget effect confirmed by data; improvement against base line ≥ 10% or reach an approved threshold; the effect is stable ≥ 2 Measurement Cycles
S03-N11-DDiagnostics of the Trust node in the time field contour: measure the current state and deviations.trust index; share of confirmed commitments; stability of interactions; baselinehistory of obligations; ratings; contracts; trust surveysD = 0,40·C + 0,35·Q + 0,25·TS03-N11-K, S03-N11-R, S03-N10-D, S03-N12-D, S02-N11-D, S04-N11-DData coverage ≥ 90%; relevance in the given SLA; We trace the source; recalculation gives a deviation ≤ 5%
S03-N11-KCoordination of the "Trust" node in the contour of the time field: coordinate participants, restrictions and actions.trust index; share of confirmed commitments; stability of interactions; consistency indexhistory of obligations; ratings; contracts; trust surveysK = 0,40·A + 0,30·L + 0,30·RS03-N11-D, S03-N11-R, S03-N10-K, S03-N12-K, S02-N11-K, S04-N11-K≥ 80% key actors agreed; roles and solutions fixed; critical conflicts closed; resource gap ≤ 10%
S03-N11-RDevelopment of the "Trust" node in the contour of the time field: change the state and increase the potential.trust index; share of confirmed commitments; stability of interactions; increase to baselinehistory of obligations; ratings; contracts; trust surveysR = 0,40·G + 0,30·S + 0,30·VS03-N11-D, S03-N11-K, S03-N10-R, S03-N12-R, S02-N11-R, S04-N11-Rtarget effect confirmed by data; improvement against base line ≥ 10% or reach an approved threshold; the effect is stable ≥ 2 Measurement Cycles
S03-N12-DDiagnosis of the "Cooperation" node in the time field contour: measure the current state and deviations.number of active links; density of cooperation; share of joint projects; baselinegraph links; agreements; consortia; joint projectsD = 0,40·C + 0,35·Q + 0,25·TS03-N12-K, S03-N12-R, S03-N11-D, S03-N13-D, S02-N12-D, S04-N12-DData coverage ≥ 90%; relevance in the given SLA; We trace the source; recalculation gives a deviation ≤ 5%
S03-N12-KCoordination of the "Cooperation" node in the contour of the time field: coordinate participants, restrictions and actions.number of active links; density of cooperation; proportion of joint projects; consistency indexgraph links; agreements; consortia; joint projectsK = 0,40·A + 0,30·L + 0,30·RS03-N12-D, S03-N12-R, S03-N11-K, S03-N13-K, S02-N12-K, S04-N12-K≥ 80% key actors agreed; roles and solutions fixed; critical conflicts closed; resource gap ≤ 10%
S03-N12-RDevelopment of the "Cooperation" node in the contour of the time field: change the state and increase the potential.number of active links; density of cooperation; share of joint projects; increase to the baselinegraph links; agreements; consortia; joint projectsR = 0,40·G + 0,30·S + 0,30·VS03-N12-D, S03-N12-K, S03-N11-R, S03-N13-R, S02-N12-R, S04-N12-Rtarget effect confirmed by data; improvement against base line ≥ 10% or reach an approved threshold; the effect is stable ≥ 2 Measurement Cycles
S03-N13-DDiagnostics of the Infrastructure node in the time field contour: measure the current state and deviations.infrastructure availability; reliability; capacity utilization; base lineGIS; object passports; dispatching; operational logsD = 0,40·C + 0,35·Q + 0,25·TS03-N13-K, S03-N13-R, S03-N12-D, S03-N14-D, S02-N13-D, S04-N13-DData coverage ≥ 90%; relevance in the given SLA; We trace the source; recalculation gives a deviation ≤ 5%
S03-N13-KCoordination of the "Infrastructure" node in the contour of the time field: coordinate participants, restrictions and actions.infrastructure availability; reliability; capacity utilization; consistency indexGIS; object passports; dispatching; operational logsK = 0,40·A + 0,30·L + 0,30·RS03-N13-D, S03-N13-R, S03-N12-K, S03-N14-K, S02-N13-K, S04-N13-K≥ 80% key actors agreed; roles and solutions fixed; critical conflicts closed; resource gap ≤ 10%
S03-N13-RDevelopment of the Infrastructure node in the contour of the time field: change the state and increase the potential.infrastructure availability; reliability; capacity utilization; increase to base lineGIS; object passports; dispatching; operational logsR = 0,40·G + 0,30·S + 0,30·VS03-N13-D, S03-N13-K, S03-N12-R, S03-N14-R, S02-N13-R, S04-N13-Rtarget effect confirmed by data; improvement against base line ≥ 10% or reach an approved threshold; the effect is stable ≥ 2 Measurement Cycles
S03-N14-DDiagnostics of the Standard node in the time field contour: measure current state and deviations.standards coverage; compliance; number of deviations; baselinenormative documents; standards; checklists; audit resultsD = 0,40·C + 0,35·Q + 0,25·TS03-N14-K, S03-N14-R, S03-N13-D, S03-N15-D, S02-N14-D, S04-N14-DData coverage ≥ 90%; relevance in the given SLA; We trace the source; recalculation gives a deviation ≤ 5%
S03-N14-KCoordination of the "Standard" node in the contour of the time field: coordinate participants, restrictions and actions.standards coverage; compliance; number of deviations; consistency indexnormative documents; standards; checklists; audit resultsK = 0,40·A + 0,30·L + 0,30·RS03-N14-D, S03-N14-R, S03-N13-K, S03-N15-K, S02-N14-K, S04-N14-K≥ 80% key actors agreed; roles and solutions fixed; critical conflicts closed; resource gap ≤ 10%
S03-N14-RDevelopment of the Standard node in the contour of the time field: change the state and increase the potential.coverage standards; compliance; number of deviations; increase to baselinenormative documents; standards; checklists; audit resultsR = 0,40·G + 0,30·S + 0,30·VS03-N14-D, S03-N14-K, S03-N13-R, S03-N15-R, S02-N14-R, S04-N14-Rtarget effect confirmed by data; improvement against base line ≥ 10% or reach an approved threshold; the effect is stable ≥ 2 Measurement Cycles
S03-N15-DDiagnostics of the "Finance" node in the time field contour: measure the current state and deviations.liquidity; resource cost; financial stability; baselineaccounting; budgets; treasury; banking and investment dataD = 0,40·C + 0,35·Q + 0,25·TS03-N15-K, S03-N15-R, S03-N14-D, S03-N16-D, S02-N15-D, S04-N15-DData coverage ≥ 90%; relevance in the given SLA; We trace the source; recalculation gives a deviation ≤ 5%
S03-N15-KCoordination of the "Finance" node in the contour of the time field: coordinate participants, restrictions and actions.liquidity; resource cost; financial stability; consistency indexaccounting; budgets; treasury; banking and investment dataK = 0,40·A + 0,30·L + 0,30·RS03-N15-D, S03-N15-R, S03-N14-K, S03-N16-K, S02-N15-K, S04-N15-K≥ 80% key actors agreed; roles and solutions fixed; critical conflicts closed; resource gap ≤ 10%
S03-N15-RDevelopment of the Finance node in the contour of the time field: change the state and increase the potential.liquidity; cost of resource; financial stability; growth to the baselineaccounting; budgets; treasury; banking and investment dataR = 0,40·G + 0,30·S + 0,30·VS03-N15-D, S03-N15-K, S03-N14-R, S03-N16-R, S02-N15-R, S04-N15-Rtarget effect confirmed by data; improvement against base line ≥ 10% or reach an approved threshold; the effect is stable ≥ 2 Measurement Cycles
S03-N16-DDiagnosis of the "Personnel" node in the time field contour: measure the current state and deviations.staffing; level of competence; fluidity/continuity; baselineHRIS; competence registers; training; certificationsD = 0,40·C + 0,35·Q + 0,25·TS03-N16-K, S03-N16-R, S03-N15-D, S03-N17-D, S02-N16-D, S04-N16-DData coverage ≥ 90%; relevance in the given SLA; We trace the source; recalculation gives a deviation ≤ 5%
S03-N16-KCoordination of the "Personnel" node in the contour of the time field: coordinate participants, restrictions and actions.staff security; level of competence; fluidity/continuity; consistency indexHRIS; competence registers; training; certificationsK = 0,40·A + 0,30·L + 0,30·RS03-N16-D, S03-N16-R, S03-N15-K, S03-N17-K, S02-N16-K, S04-N16-K≥ 80% key actors agreed; roles and solutions fixed; critical conflicts closed; resource gap ≤ 10%
S03-N16-RDevelopment of the "Personnel" node in the contour of the time field: change the state and increase the potential.staffing; level of competence; fluidity/continuity; increment to baselineHRIS; competence registers; training; certificationsR = 0,40·G + 0,30·S + 0,30·VS03-N16-D, S03-N16-K, S03-N15-R, S03-N17-R, S02-N16-R, S04-N16-Rtarget effect confirmed by data; improvement against base line ≥ 10% or reach an approved threshold; the effect is stable ≥ 2 Measurement Cycles
S03-N17-DDiagnostics of the node "Technology" in the contour of the time field: to measure the current state and deviations.technology readiness; technology efficiency; scalability; base lineTRL/MRL; patents; tests; digital models; technical cardsD = 0,40·C + 0,35·Q + 0,25·TS03-N17-K, S03-N17-R, S03-N16-D, S03-N18-D, S02-N17-D, S04-N17-DData coverage ≥ 90%; relevance in the given SLA; We trace the source; recalculation gives a deviation ≤ 5%
S03-N17-KCoordination of the node "Technology" in the contour of the time field: to coordinate participants, restrictions and actions.technology readiness; technology efficiency; scalability; consistency indexTRL/MRL; patents; tests; digital models; technical cardsK = 0,40·A + 0,30·L + 0,30·RS03-N17-D, S03-N17-R, S03-N16-K, S03-N18-K, S02-N17-K, S04-N17-K≥ 80% key actors agreed; roles and solutions fixed; critical conflicts closed; resource gap ≤ 10%
S03-N17-RDevelopment of the "Technology" node in the contour of the time field: change the state and increase the potential.technology readiness; technology efficiency; scalability; growth to the baselineTRL/MRL; patents; tests; digital models; technical cardsR = 0,40·G + 0,30·S + 0,30·VS03-N17-D, S03-N17-K, S03-N16-R, S03-N18-R, S02-N17-R, S04-N17-Rtarget effect confirmed by data; improvement against base line ≥ 10% or reach an approved threshold; the effect is stable ≥ 2 Measurement Cycles
S03-N18-DDiagnosis of the node "Wednesday" in the contour of the time field: to measure the current state and deviations.environmental quality; load on the environment; recovery potential; baselineenvironmental monitoring; GIS; meteo; biocenose observationsD = 0,40·C + 0,35·Q + 0,25·TS03-N18-K, S03-N18-R, S03-N17-D, S03-N19-D, S02-N18-D, S04-N18-DData coverage ≥ 90%; relevance in the given SLA; We trace the source; recalculation gives a deviation ≤ 5%
S03-N18-KCoordination of the "Wednesday" node in the contour of the time field: coordinate participants, restrictions and actions.quality of the environment; load on the environment; recovery potential; consistency indexenvironmental monitoring; GIS; meteo; biocenose observationsK = 0,40·A + 0,30·L + 0,30·RS03-N18-D, S03-N18-R, S03-N17-K, S03-N19-K, S02-N18-K, S04-N18-K≥ 80% key actors agreed; roles and solutions fixed; critical conflicts closed; resource gap ≤ 10%
S03-N18-RDevelopment of the node "Wednesday" in the contour of the time field: change the state and increase the potential.quality of the environment; load on the environment; recovery potential; increase to the baselineenvironmental monitoring; GIS; meteo; biocenose observationsR = 0,40·G + 0,30·S + 0,30·VS03-N18-D, S03-N18-K, S03-N17-R, S03-N19-R, S02-N18-R, S04-N18-Rtarget effect confirmed by data; improvement against base line ≥ 10% or reach an approved threshold; the effect is stable ≥ 2 Measurement Cycles
S03-N19-DDiagnostics of the node "Result" in the contour of the time field: measure the current state and deviations.result achievement; effect/costs; result stability; baselineKPI; effects statistics; acceptance acts; impact assessmentD = 0,40·C + 0,35·Q + 0,25·TS03-N19-K, S03-N19-R, S03-N18-D, S02-N19-D, S04-N19-DData coverage ≥ 90%; relevance in the given SLA; We trace the source; recalculation gives a deviation ≤ 5%
S03-N19-KCoordination of the node "Result" in the contour of the time field: agree on participants, restrictions and actions.achievement of result; effect/costs; sustainability of result; consistency indexKPI; effects statistics; acceptance acts; impact assessmentK = 0,40·A + 0,30·L + 0,30·RS03-N19-D, S03-N19-R, S03-N18-K, S02-N19-K, S04-N19-K≥ 80% key actors agreed; roles and solutions fixed; critical conflicts closed; resource gap ≤ 10%
S03-N19-RDevelopment of the node "Result" in the contour of the time field: change the state and increase the potential.result achievement; effect/costs; result stability; increase to baselineKPI; effects statistics; acceptance acts; impact assessmentR = 0,40·G + 0,30·S + 0,30·VS03-N19-D, S03-N19-K, S03-N18-R, S02-N19-R, S04-N19-Rtarget effect confirmed by data; improvement against base line ≥ 10% or reach an approved threshold; the effect is stable ≥ 2 Measurement Cycles

S04 · Energy and resources

Function of the family: resource security, energy and material flows. Modules: 57 (19 Node × 3 Status).

CodeFunctionIndicatorsDataFormulaConnectionsValidation criteria
S04-N01-DDiagnostics of the "Subject" node in the resource field contour: measure the current state and deviations.identification of subjects; completeness of roles; level of responsibility; baselineregisters of subjects; organizational structures; contracts; role profilesD = 0,40·C + 0,35·Q + 0,25·TS04-N01-K, S04-N01-R, S04-N02-D, S03-N01-D, S05-N01-DData coverage ≥ 90%; relevance in the given SLA; We trace the source; recalculation gives a deviation ≤ 5%
S04-N01-KCoordination of the node "Subject" in the contour of the resource field: coordinate participants, restrictions and actions.identification of subjects; completeness of roles; level of responsibility; consistency indexregisters of subjects; organizational structures; contracts; role profilesK = 0,40·A + 0,30·L + 0,30·RS04-N01-D, S04-N01-R, S04-N02-K, S03-N01-K, S05-N01-K≥ 80% key actors agreed; roles and solutions fixed; critical conflicts closed; resource gap ≤ 10%
S04-N01-RDevelopment of the subject node in the contour of the resource field: change the state and increase the potential.Identification of subjects; completeness of roles; level of responsibility; increase to the baselineregisters of subjects; organizational structures; contracts; role profilesR = 0,40·G + 0,30·S + 0,30·VS04-N01-D, S04-N01-K, S04-N02-R, S03-N01-R, S05-N01-Rtarget effect confirmed by data; improvement against base line ≥ 10% or reach an approved threshold; the effect is stable ≥ 2 Measurement Cycles
S04-N02-DDiagnostics of the "Purpose" node in the resource field contour: measure the current state and deviations.Measurability of objectives; consistency of objectives; proportion of objectives achieved; baselinestrategies; KPI; programs; decision protocolsD = 0,40·C + 0,35·Q + 0,25·TS04-N02-K, S04-N02-R, S04-N01-D, S04-N03-D, S03-N02-D, S05-N02-DData coverage ≥ 90%; relevance in the given SLA; We trace the source; recalculation gives a deviation ≤ 5%
S04-N02-KCoordination of the "Purpose" node in the contour of the resource field: coordinate participants, restrictions and actions.Measurability of objectives; Coherence of objectives; Percentage of objectives achieved; Coherence indexstrategies; KPI; programs; decision protocolsK = 0,40·A + 0,30·L + 0,30·RS04-N02-D, S04-N02-R, S04-N01-K, S04-N03-K, S03-N02-K, S05-N02-K≥ 80% key actors agreed; roles and solutions fixed; critical conflicts closed; resource gap ≤ 10%
S04-N02-RDevelopment of the "Purpose" node in the contour of the resource field: change the state and increase the potential.measurability of the goal; consistency of goals; proportion of goals achieved; increase to the baselinestrategies; KPI; programs; decision protocolsR = 0,40·G + 0,30·S + 0,30·VS04-N02-D, S04-N02-K, S04-N01-R, S04-N03-R, S03-N02-R, S05-N02-Rtarget effect confirmed by data; improvement against base line ≥ 10% or reach an approved threshold; the effect is stable ≥ 2 Measurement Cycles
S04-N03-DDiagnostics of the Border node in the contour of the resource field: measure the current state and deviations.clarity of boundaries; number of boundary conflicts; contour stability; baselinecontour maps; regulations; access rights; territorial dataD = 0,40·C + 0,35·Q + 0,25·TS04-N03-K, S04-N03-R, S04-N02-D, S04-N04-D, S03-N03-D, S05-N03-DData coverage ≥ 90%; relevance in the given SLA; We trace the source; recalculation gives a deviation ≤ 5%
S04-N03-KCoordination of the Border node in the contour of the resource field: coordinate participants, restrictions and actions.clarity of boundaries; number of boundary conflicts; stability of contour; consistency indexcontour maps; regulations; access rights; territorial dataK = 0,40·A + 0,30·L + 0,30·RS04-N03-D, S04-N03-R, S04-N02-K, S04-N04-K, S03-N03-K, S05-N03-K≥ 80% key actors agreed; roles and solutions fixed; critical conflicts closed; resource gap ≤ 10%
S04-N03-RDevelopment of the Border node in the contour of the resource field: change the state and increase the potential.clarity of borders; number of border conflicts; stability of the contour; increment to the baselinecontour maps; regulations; access rights; territorial dataR = 0,40·G + 0,30·S + 0,30·VS04-N03-D, S04-N03-K, S04-N02-R, S04-N04-R, S03-N03-R, S05-N03-Rtarget effect confirmed by data; improvement against base line ≥ 10% or reach an approved threshold; the effect is stable ≥ 2 Measurement Cycles
S04-N04-DDiagnostics of the Resource node in the resource field contour: measure the current state and deviations.resource availability; deficit/surplus; efficiency of use; baselinebalance of resources; warehouse/ERP; energy balance; capacityD = 0,40·C + 0,35·Q + 0,25·TS04-N04-K, S04-N04-R, S04-N03-D, S04-N05-D, S03-N04-D, S05-N04-DData coverage ≥ 90%; relevance in the given SLA; We trace the source; recalculation gives a deviation ≤ 5%
S04-N04-KCoordination of the Resource node in the contour of the resource field: coordinate participants, restrictions and actions.resource availability; deficit/surplus; efficiency of use; consistency indexbalance of resources; warehouse/ERP; energy balance; capacityK = 0,40·A + 0,30·L + 0,30·RS04-N04-D, S04-N04-R, S04-N03-K, S04-N05-K, S03-N04-K, S05-N04-K≥ 80% key actors agreed; roles and solutions fixed; critical conflicts closed; resource gap ≤ 10%
S04-N04-RDevelopment of the Resource node in the contour of the resource field: change the state and increase the potential.resource availability; deficit/surplus; efficiency of use; increase to the baselinebalance of resources; warehouse/ERP; energy balance; capacityR = 0,40·G + 0,30·S + 0,30·VS04-N04-D, S04-N04-K, S04-N03-R, S04-N05-R, S03-N04-R, S05-N04-Rtarget effect confirmed by data; improvement against base line ≥ 10% or reach an approved threshold; the effect is stable ≥ 2 Measurement Cycles
S04-N05-DDiagnostics of the Signal node in the resource field contour: measure the current state and deviations.reliability of signals; signal delay; fraction of false alarms; baselinesensors; event logs; appeals; media/network monitoringD = 0,40·C + 0,35·Q + 0,25·TS04-N05-K, S04-N05-R, S04-N04-D, S04-N06-D, S03-N05-D, S05-N05-DData coverage ≥ 90%; relevance in the given SLA; We trace the source; recalculation gives a deviation ≤ 5%
S04-N05-KCoordination of the node "Signal" in the contour of the resource field: coordinate participants, restrictions and actions.reliability of signals; signal delay; proportion of false alarms; consistency indexsensors; event logs; appeals; media/network monitoringK = 0,40·A + 0,30·L + 0,30·RS04-N05-D, S04-N05-R, S04-N04-K, S04-N06-K, S03-N05-K, S05-N05-K≥ 80% key actors agreed; roles and solutions fixed; critical conflicts closed; resource gap ≤ 10%
S04-N05-RDevelopment of the Signal node in the contour of the resource field: change the state and increase the potential.reliability of signals; signal delay; fraction of false alarms; increment to base linesensors; event logs; appeals; media/network monitoringR = 0,40·G + 0,30·S + 0,30·VS04-N05-D, S04-N05-K, S04-N04-R, S04-N06-R, S03-N05-R, S05-N05-Rtarget effect confirmed by data; improvement against base line ≥ 10% or reach an approved threshold; the effect is stable ≥ 2 Measurement Cycles
S04-N06-DDiagnostics of the Knowledge node in the resource field contour: measure the current state and deviations.completeness of knowledge; relevance of knowledge; level of evidence; baselineResearch; knowledge bases; publications; expertise; archivesD = 0,40·C + 0,35·Q + 0,25·TS04-N06-K, S04-N06-R, S04-N05-D, S04-N07-D, S03-N06-D, S05-N06-DData coverage ≥ 90%; relevance in the given SLA; We trace the source; recalculation gives a deviation ≤ 5%
S04-N06-KCoordination of the node "Knowledge" in the contour of the resource field: coordinate participants, restrictions and actions.completeness of knowledge; relevance of knowledge; level of evidence; consistency indexResearch; knowledge bases; publications; expertise; archivesK = 0,40·A + 0,30·L + 0,30·RS04-N06-D, S04-N06-R, S04-N05-K, S04-N07-K, S03-N06-K, S05-N06-K≥ 80% key actors agreed; roles and solutions fixed; critical conflicts closed; resource gap ≤ 10%
S04-N06-RDevelopment of the Knowledge node in the resource field contour: change the state and increase the potential.completeness of knowledge; relevance of knowledge; level of evidence; increase to the baselineResearch; knowledge bases; publications; expertise; archivesR = 0,40·G + 0,30·S + 0,30·VS04-N06-D, S04-N06-K, S04-N05-R, S04-N07-R, S03-N06-R, S05-N06-Rtarget effect confirmed by data; improvement against base line ≥ 10% or reach an approved threshold; the effect is stable ≥ 2 Measurement Cycles
S04-N07-DDiagnostics of the node "Solution" in the contour of the resource field: measure the current state and deviations.speed of decision; quality of decision; proportion of decisions executed; baselineEDMS; protocols; tasks; approval logsD = 0,40·C + 0,35·Q + 0,25·TS04-N07-K, S04-N07-R, S04-N06-D, S04-N08-D, S03-N07-D, S05-N07-DData coverage ≥ 90%; relevance in the given SLA; We trace the source; recalculation gives a deviation ≤ 5%
S04-N07-KCoordination of the node "Solution" in the contour of the resource field: to coordinate participants, restrictions and actions.speed of decision; quality of decision; proportion of decisions executed; consistency indexEDMS; protocols; tasks; approval logsK = 0,40·A + 0,30·L + 0,30·RS04-N07-D, S04-N07-R, S04-N06-K, S04-N08-K, S03-N07-K, S05-N07-K≥ 80% key actors agreed; roles and solutions fixed; critical conflicts closed; resource gap ≤ 10%
S04-N07-RDevelopment of the "Solution" node in the contour of the resource field: change the state and increase the potential.speed of decision; quality of decision; share of executed decisions; increase to the base lineEDMS; protocols; tasks; approval logsR = 0,40·G + 0,30·S + 0,30·VS04-N07-D, S04-N07-K, S04-N06-R, S04-N08-R, S03-N07-R, S05-N07-Rtarget effect confirmed by data; improvement against base line ≥ 10% or reach an approved threshold; the effect is stable ≥ 2 Measurement Cycles
S04-N08-DDiagnostics of the Action node in the resource field contour: measure the current state and deviations.intensity of actions; compliance with deadlines; effectiveness of actions; baselinework plans; trackers; production systems; execution actsD = 0,40·C + 0,35·Q + 0,25·TS04-N08-K, S04-N08-R, S04-N07-D, S04-N09-D, S03-N08-D, S05-N08-DData coverage ≥ 90%; relevance in the given SLA; We trace the source; recalculation gives a deviation ≤ 5%
S04-N08-KCoordination of the node "Action" in the contour of the resource field: to coordinate participants, restrictions and actions.intensity of actions; compliance with deadlines; effectiveness of actions; consistency indexwork plans; trackers; production systems; execution actsK = 0,40·A + 0,30·L + 0,30·RS04-N08-D, S04-N08-R, S04-N07-K, S04-N09-K, S03-N08-K, S05-N08-K≥ 80% key actors agreed; roles and solutions fixed; critical conflicts closed; resource gap ≤ 10%
S04-N08-RDevelopment of the Action node in the contour of the resource field: change the state and increase the potential.intensity of actions; compliance with deadlines; effectiveness of actions; increase to the baselinework plans; trackers; production systems; execution actsR = 0,40·G + 0,30·S + 0,30·VS04-N08-D, S04-N08-K, S04-N07-R, S04-N09-R, S03-N08-R, S05-N08-Rtarget effect confirmed by data; improvement against base line ≥ 10% or reach an approved threshold; the effect is stable ≥ 2 Measurement Cycles
S04-N09-DDiagnostics of the "Feedback" node in the contour of the resource field: measure the current state and deviations.frequency of feedback; correction rate; the proportion of closed deviations; baselineuser feedback; audits; telemetry; control measurementsD = 0,40·C + 0,35·Q + 0,25·TS04-N09-K, S04-N09-R, S04-N08-D, S04-N10-D, S03-N09-D, S05-N09-DData coverage ≥ 90%; relevance in the given SLA; We trace the source; recalculation gives a deviation ≤ 5%
S04-N09-KCoordination of the "Feedback" node in the contour of the resource field: coordinate participants, restrictions and actions.frequency of feedback; correction rate; proportion of closed deviations; consistency indexuser feedback; audits; telemetry; control measurementsK = 0,40·A + 0,30·L + 0,30·RS04-N09-D, S04-N09-R, S04-N08-K, S04-N10-K, S03-N09-K, S05-N09-K≥ 80% key actors agreed; roles and solutions fixed; critical conflicts closed; resource gap ≤ 10%
S04-N09-RDevelopment of the "Feedback" node in the contour of the resource field: change the state and increase the potential.frequency of feedback; correction rate; the proportion of closed deviations; increase to the base lineuser feedback; audits; telemetry; control measurementsR = 0,40·G + 0,30·S + 0,30·VS04-N09-D, S04-N09-K, S04-N08-R, S04-N10-R, S03-N09-R, S05-N09-Rtarget effect confirmed by data; improvement against base line ≥ 10% or reach an approved threshold; the effect is stable ≥ 2 Measurement Cycles
S04-N10-DDiagnostics of the Risk node in the resource field contour: measure the current state and deviations.probability of risk; extent of damage; residual risk; baselinerisk registers; incidents; insurance events; scenario modelsD = 0,40·C + 0,35·Q + 0,25·TS04-N10-K, S04-N10-R, S04-N09-D, S04-N11-D, S03-N10-D, S05-N10-DData coverage ≥ 90%; relevance in the given SLA; We trace the source; recalculation gives a deviation ≤ 5%
S04-N10-KCoordination of the Risk node in the contour of the resource field: coordinate participants, restrictions and actions.probability of risk; extent of damage; residual risk; consistency indexrisk registers; incidents; insurance events; scenario modelsK = 0,40·A + 0,30·L + 0,30·RS04-N10-D, S04-N10-R, S04-N09-K, S04-N11-K, S03-N10-K, S05-N10-K≥ 80% key actors agreed; roles and solutions fixed; critical conflicts closed; resource gap ≤ 10%
S04-N10-RDevelopment of the Risk node in the resource field contour: change the state and increase the potential.probability of risk; extent of damage; residual risk; increment to baselinerisk registers; incidents; insurance events; scenario modelsR = 0,40·G + 0,30·S + 0,30·VS04-N10-D, S04-N10-K, S04-N09-R, S04-N11-R, S03-N10-R, S05-N10-Rtarget effect confirmed by data; improvement against base line ≥ 10% or reach an approved threshold; the effect is stable ≥ 2 Measurement Cycles
S04-N11-DDiagnostics of the "Trust" node in the resource field contour: measure the current state and deviations.trust index; share of confirmed commitments; stability of interactions; baselinehistory of obligations; ratings; contracts; trust surveysD = 0,40·C + 0,35·Q + 0,25·TS04-N11-K, S04-N11-R, S04-N10-D, S04-N12-D, S03-N11-D, S05-N11-DData coverage ≥ 90%; relevance in the given SLA; We trace the source; recalculation gives a deviation ≤ 5%
S04-N11-KCoordination of the node "Trust" in the contour of the resource field: to coordinate participants, restrictions and actions.trust index; share of confirmed commitments; stability of interactions; consistency indexhistory of obligations; ratings; contracts; trust surveysK = 0,40·A + 0,30·L + 0,30·RS04-N11-D, S04-N11-R, S04-N10-K, S04-N12-K, S03-N11-K, S05-N11-K≥ 80% key actors agreed; roles and solutions fixed; critical conflicts closed; resource gap ≤ 10%
S04-N11-RDevelopment of the "Trust" node in the contour of the resource field: change the state and increase the potential.trust index; share of confirmed commitments; stability of interactions; increase to baselinehistory of obligations; ratings; contracts; trust surveysR = 0,40·G + 0,30·S + 0,30·VS04-N11-D, S04-N11-K, S04-N10-R, S04-N12-R, S03-N11-R, S05-N11-Rtarget effect confirmed by data; improvement against base line ≥ 10% or reach an approved threshold; the effect is stable ≥ 2 Measurement Cycles
S04-N12-DDiagnostics of the "Cooperation" node in the resource field contour: measure the current state and deviations.number of active links; density of cooperation; share of joint projects; baselinegraph links; agreements; consortia; joint projectsD = 0,40·C + 0,35·Q + 0,25·TS04-N12-K, S04-N12-R, S04-N11-D, S04-N13-D, S03-N12-D, S05-N12-DData coverage ≥ 90%; relevance in the given SLA; We trace the source; recalculation gives a deviation ≤ 5%
S04-N12-KCoordination of the node "Cooperation" in the contour of the resource field: to coordinate participants, restrictions and actions.number of active links; density of cooperation; proportion of joint projects; consistency indexgraph links; agreements; consortia; joint projectsK = 0,40·A + 0,30·L + 0,30·RS04-N12-D, S04-N12-R, S04-N11-K, S04-N13-K, S03-N12-K, S05-N12-K≥ 80% key actors agreed; roles and solutions fixed; critical conflicts closed; resource gap ≤ 10%
S04-N12-RDevelopment of the "Cooperation" node in the contour of the resource field: change the state and increase the potential.number of active links; density of cooperation; share of joint projects; increase to the baselinegraph links; agreements; consortia; joint projectsR = 0,40·G + 0,30·S + 0,30·VS04-N12-D, S04-N12-K, S04-N11-R, S04-N13-R, S03-N12-R, S05-N12-Rtarget effect confirmed by data; improvement against base line ≥ 10% or reach an approved threshold; the effect is stable ≥ 2 Measurement Cycles
S04-N13-DDiagnostics of the Infrastructure node in the resource field contour: measure current state and deviations.infrastructure availability; reliability; capacity utilization; base lineGIS; object passports; dispatching; operational logsD = 0,40·C + 0,35·Q + 0,25·TS04-N13-K, S04-N13-R, S04-N12-D, S04-N14-D, S03-N13-D, S05-N13-DData coverage ≥ 90%; relevance in the given SLA; We trace the source; recalculation gives a deviation ≤ 5%
S04-N13-KCoordination of the "Infrastructure" node in the contour of the resource field: coordinate participants, restrictions and actions.infrastructure availability; reliability; capacity utilization; consistency indexGIS; object passports; dispatching; operational logsK = 0,40·A + 0,30·L + 0,30·RS04-N13-D, S04-N13-R, S04-N12-K, S04-N14-K, S03-N13-K, S05-N13-K≥ 80% key actors agreed; roles and solutions fixed; critical conflicts closed; resource gap ≤ 10%
S04-N13-RDevelopment of the Infrastructure node in the contour of the resource field: change the state and increase the potential.infrastructure availability; reliability; capacity utilization; increase to base lineGIS; object passports; dispatching; operational logsR = 0,40·G + 0,30·S + 0,30·VS04-N13-D, S04-N13-K, S04-N12-R, S04-N14-R, S03-N13-R, S05-N13-Rtarget effect confirmed by data; improvement against base line ≥ 10% or reach an approved threshold; the effect is stable ≥ 2 Measurement Cycles
S04-N14-DDiagnostics of the "Standard" node in the resource field contour: measure the current state and deviations.standards coverage; compliance; number of deviations; baselinenormative documents; standards; checklists; audit resultsD = 0,40·C + 0,35·Q + 0,25·TS04-N14-K, S04-N14-R, S04-N13-D, S04-N15-D, S03-N14-D, S05-N14-DData coverage ≥ 90%; relevance in the given SLA; We trace the source; recalculation gives a deviation ≤ 5%
S04-N14-KCoordination of the node "Standard" in the contour of the resource field: to coordinate participants, restrictions and actions.standards coverage; compliance; number of deviations; consistency indexnormative documents; standards; checklists; audit resultsK = 0,40·A + 0,30·L + 0,30·RS04-N14-D, S04-N14-R, S04-N13-K, S04-N15-K, S03-N14-K, S05-N14-K≥ 80% key actors agreed; roles and solutions fixed; critical conflicts closed; resource gap ≤ 10%
S04-N14-RDevelopment of the Standard node in the contour of the resource field: change the state and increase the potential.coverage standards; compliance; number of deviations; increase to baselinenormative documents; standards; checklists; audit resultsR = 0,40·G + 0,30·S + 0,30·VS04-N14-D, S04-N14-K, S04-N13-R, S04-N15-R, S03-N14-R, S05-N14-Rtarget effect confirmed by data; improvement against base line ≥ 10% or reach an approved threshold; the effect is stable ≥ 2 Measurement Cycles
S04-N15-DDiagnostics of the "Finance" node in the resource field contour: measure the current state and deviations.liquidity; resource cost; financial stability; baselineaccounting; budgets; treasury; banking and investment dataD = 0,40·C + 0,35·Q + 0,25·TS04-N15-K, S04-N15-R, S04-N14-D, S04-N16-D, S03-N15-D, S05-N15-DData coverage ≥ 90%; relevance in the given SLA; We trace the source; recalculation gives a deviation ≤ 5%
S04-N15-KCoordination of the "Finance" node in the contour of the resource field: coordinate participants, restrictions and actions.liquidity; resource cost; financial stability; consistency indexaccounting; budgets; treasury; banking and investment dataK = 0,40·A + 0,30·L + 0,30·RS04-N15-D, S04-N15-R, S04-N14-K, S04-N16-K, S03-N15-K, S05-N15-K≥ 80% key actors agreed; roles and solutions fixed; critical conflicts closed; resource gap ≤ 10%
S04-N15-RDevelopment of the "Finance" node in the contour of the resource field: change the state and increase the potential.liquidity; cost of resource; financial stability; growth to the baselineaccounting; budgets; treasury; banking and investment dataR = 0,40·G + 0,30·S + 0,30·VS04-N15-D, S04-N15-K, S04-N14-R, S04-N16-R, S03-N15-R, S05-N15-Rtarget effect confirmed by data; improvement against base line ≥ 10% or reach an approved threshold; the effect is stable ≥ 2 Measurement Cycles
S04-N16-DDiagnostics of the "Personnel" node in the contour of the resource field: measure the current state and deviations.staffing; level of competence; fluidity/continuity; baselineHRIS; competence registers; training; certificationsD = 0,40·C + 0,35·Q + 0,25·TS04-N16-K, S04-N16-R, S04-N15-D, S04-N17-D, S03-N16-D, S05-N16-DData coverage ≥ 90%; relevance in the given SLA; We trace the source; recalculation gives a deviation ≤ 5%
S04-N16-KCoordination of the "Personnel" node in the contour of the resource field: coordinate participants, restrictions and actions.staff security; level of competence; fluidity/continuity; consistency indexHRIS; competence registers; training; certificationsK = 0,40·A + 0,30·L + 0,30·RS04-N16-D, S04-N16-R, S04-N15-K, S04-N17-K, S03-N16-K, S05-N16-K≥ 80% key actors agreed; roles and solutions fixed; critical conflicts closed; resource gap ≤ 10%
S04-N16-RThe development of the "Personnel" node in the contour of the resource field: change the state and increase the potential.staffing; level of competence; fluidity/continuity; increment to baselineHRIS; competence registers; training; certificationsR = 0,40·G + 0,30·S + 0,30·VS04-N16-D, S04-N16-K, S04-N15-R, S04-N17-R, S03-N16-R, S05-N16-Rtarget effect confirmed by data; improvement against base line ≥ 10% or reach an approved threshold; the effect is stable ≥ 2 Measurement Cycles
S04-N17-DDiagnostics of the node "Technology" in the contour of the resource field: measure the current state and deviations.technology readiness; technology efficiency; scalability; base lineTRL/MRL; patents; tests; digital models; technical cardsD = 0,40·C + 0,35·Q + 0,25·TS04-N17-K, S04-N17-R, S04-N16-D, S04-N18-D, S03-N17-D, S05-N17-DData coverage ≥ 90%; relevance in the given SLA; We trace the source; recalculation gives a deviation ≤ 5%
S04-N17-KCoordination of the node "Technology" in the contour of the resource field: to coordinate participants, restrictions and actions.technology readiness; technology efficiency; scalability; consistency indexTRL/MRL; patents; tests; digital models; technical cardsK = 0,40·A + 0,30·L + 0,30·RS04-N17-D, S04-N17-R, S04-N16-K, S04-N18-K, S03-N17-K, S05-N17-K≥ 80% key actors agreed; roles and solutions fixed; critical conflicts closed; resource gap ≤ 10%
S04-N17-RDevelopment of the "Technology" node in the contour of the resource field: change the state and increase the potential.technology readiness; technology efficiency; scalability; growth to the baselineTRL/MRL; patents; tests; digital models; technical cardsR = 0,40·G + 0,30·S + 0,30·VS04-N17-D, S04-N17-K, S04-N16-R, S04-N18-R, S03-N17-R, S05-N17-Rtarget effect confirmed by data; improvement against base line ≥ 10% or reach an approved threshold; the effect is stable ≥ 2 Measurement Cycles
S04-N18-DDiagnosis of the node "Wednesday" in the contour of the resource field: to measure the current state and deviations.environmental quality; load on the environment; recovery potential; baselineenvironmental monitoring; GIS; meteo; biocenose observationsD = 0,40·C + 0,35·Q + 0,25·TS04-N18-K, S04-N18-R, S04-N17-D, S04-N19-D, S03-N18-D, S05-N18-DData coverage ≥ 90%; relevance in the given SLA; We trace the source; recalculation gives a deviation ≤ 5%
S04-N18-KCoordination of the node "Wednesday" in the contour of the resource field: to coordinate participants, restrictions and actions.quality of the environment; load on the environment; recovery potential; consistency indexenvironmental monitoring; GIS; meteo; biocenose observationsK = 0,40·A + 0,30·L + 0,30·RS04-N18-D, S04-N18-R, S04-N17-K, S04-N19-K, S03-N18-K, S05-N18-K≥ 80% key actors agreed; roles and solutions fixed; critical conflicts closed; resource gap ≤ 10%
S04-N18-RDevelopment of the "Environment" node in the contour of the resource field: change the state and increase the potential.quality of the environment; load on the environment; recovery potential; increase to the baselineenvironmental monitoring; GIS; meteo; biocenose observationsR = 0,40·G + 0,30·S + 0,30·VS04-N18-D, S04-N18-K, S04-N17-R, S04-N19-R, S03-N18-R, S05-N18-Rtarget effect confirmed by data; improvement against base line ≥ 10% or reach an approved threshold; the effect is stable ≥ 2 Measurement Cycles
S04-N19-DDiagnostics of the node "Result" in the contour of the resource field: measure the current state and deviations.result achievement; effect/costs; result stability; baselineKPI; effects statistics; acceptance acts; impact assessmentD = 0,40·C + 0,35·Q + 0,25·TS04-N19-K, S04-N19-R, S04-N18-D, S03-N19-D, S05-N19-DData coverage ≥ 90%; relevance in the given SLA; We trace the source; recalculation gives a deviation ≤ 5%
S04-N19-KCoordination of the node "Result" in the contour of the resource field: to coordinate participants, restrictions and actions.achievement of result; effect/costs; sustainability of result; consistency indexKPI; effects statistics; acceptance acts; impact assessmentK = 0,40·A + 0,30·L + 0,30·RS04-N19-D, S04-N19-R, S04-N18-K, S03-N19-K, S05-N19-K≥ 80% key actors agreed; roles and solutions fixed; critical conflicts closed; resource gap ≤ 10%
S04-N19-RDevelopment of the node "Result" in the contour of the resource field: change the state and increase the potential.result achievement; effect/costs; result stability; increase to baselineKPI; effects statistics; acceptance acts; impact assessmentR = 0,40·G + 0,30·S + 0,30·VS04-N19-D, S04-N19-K, S04-N18-R, S03-N19-R, S05-N19-Rtarget effect confirmed by data; improvement against base line ≥ 10% or reach an approved threshold; the effect is stable ≥ 2 Measurement Cycles

S05 · Information and data

Family function: data, knowledge, digital footprints and analytics. Modules: 57 (19 Node × 3 Status).

CodeFunctionIndicatorsDataFormulaConnectionsValidation criteria
S05-N01-DDiagnostics of the "Subject" node in the contour of the information field: measure the current state and deviations.identification of subjects; completeness of roles; level of responsibility; baselineregisters of subjects; organizational structures; contracts; role profilesD = 0,40·C + 0,35·Q + 0,25·TS05-N01-K, S05-N01-R, S05-N02-D, S04-N01-D, S06-N01-DData coverage ≥ 90%; relevance in the given SLA; We trace the source; recalculation gives a deviation ≤ 5%
S05-N01-KCoordination of the node "Subject" in the contour of the information field: to coordinate participants, restrictions and actions.identification of subjects; completeness of roles; level of responsibility; consistency indexregisters of subjects; organizational structures; contracts; role profilesK = 0,40·A + 0,30·L + 0,30·RS05-N01-D, S05-N01-R, S05-N02-K, S04-N01-K, S06-N01-K≥ 80% key actors agreed; roles and solutions fixed; critical conflicts closed; resource gap ≤ 10%
S05-N01-RDevelopment of the subject node in the contour of the information field: change the state and increase the potential.Identification of subjects; completeness of roles; level of responsibility; increase to the baselineregisters of subjects; organizational structures; contracts; role profilesR = 0,40·G + 0,30·S + 0,30·VS05-N01-D, S05-N01-K, S05-N02-R, S04-N01-R, S06-N01-Rtarget effect confirmed by data; improvement against base line ≥ 10% or reach an approved threshold; the effect is stable ≥ 2 Measurement Cycles
S05-N02-DDiagnostics of the "Purpose" node in the information field contour: measure the current state and deviations.Measurability of objectives; consistency of objectives; proportion of objectives achieved; baselinestrategies; KPI; programs; decision protocolsD = 0,40·C + 0,35·Q + 0,25·TS05-N02-K, S05-N02-R, S05-N01-D, S05-N03-D, S04-N02-D, S06-N02-DData coverage ≥ 90%; relevance in the given SLA; We trace the source; recalculation gives a deviation ≤ 5%
S05-N02-KCoordination of the "Purpose" node in the information field contour: coordinate participants, restrictions and actions.Measurability of objectives; Coherence of objectives; Percentage of objectives achieved; Coherence indexstrategies; KPI; programs; decision protocolsK = 0,40·A + 0,30·L + 0,30·RS05-N02-D, S05-N02-R, S05-N01-K, S05-N03-K, S04-N02-K, S06-N02-K≥ 80% key actors agreed; roles and solutions fixed; critical conflicts closed; resource gap ≤ 10%
S05-N02-RDevelopment of the "Purpose" node in the contour of the information field: change the state and increase the potential.measurability of the goal; consistency of goals; proportion of goals achieved; increase to the baselinestrategies; KPI; programs; decision protocolsR = 0,40·G + 0,30·S + 0,30·VS05-N02-D, S05-N02-K, S05-N01-R, S05-N03-R, S04-N02-R, S06-N02-Rtarget effect confirmed by data; improvement against base line ≥ 10% or reach an approved threshold; the effect is stable ≥ 2 Measurement Cycles
S05-N03-DDiagnostics of the Border node in the information field contour: measure the current state and deviations.clarity of boundaries; number of boundary conflicts; contour stability; baselinecontour maps; regulations; access rights; territorial dataD = 0,40·C + 0,35·Q + 0,25·TS05-N03-K, S05-N03-R, S05-N02-D, S05-N04-D, S04-N03-D, S06-N03-DData coverage ≥ 90%; relevance in the given SLA; We trace the source; recalculation gives a deviation ≤ 5%
S05-N03-KCoordination of the Border node in the contour of the information field: coordinate participants, restrictions and actions.clarity of boundaries; number of boundary conflicts; stability of contour; consistency indexcontour maps; regulations; access rights; territorial dataK = 0,40·A + 0,30·L + 0,30·RS05-N03-D, S05-N03-R, S05-N02-K, S05-N04-K, S04-N03-K, S06-N03-K≥ 80% key actors agreed; roles and solutions fixed; critical conflicts closed; resource gap ≤ 10%
S05-N03-RDevelopment of the Border node in the contour of the information field: change the state and increase the potential.clarity of borders; number of border conflicts; stability of the contour; increment to the baselinecontour maps; regulations; access rights; territorial dataR = 0,40·G + 0,30·S + 0,30·VS05-N03-D, S05-N03-K, S05-N02-R, S05-N04-R, S04-N03-R, S06-N03-Rtarget effect confirmed by data; improvement against base line ≥ 10% or reach an approved threshold; the effect is stable ≥ 2 Measurement Cycles
S05-N04-DDiagnostics of the Resource node in the information field contour: measure the current state and deviations.resource availability; deficit/surplus; efficiency of use; baselinebalance of resources; warehouse/ERP; energy balance; capacityD = 0,40·C + 0,35·Q + 0,25·TS05-N04-K, S05-N04-R, S05-N03-D, S05-N05-D, S04-N04-D, S06-N04-DData coverage ≥ 90%; relevance in the given SLA; We trace the source; recalculation gives a deviation ≤ 5%
S05-N04-KCoordination of the Resource node in the contour of the information field: coordinate participants, restrictions and actions.resource availability; deficit/surplus; efficiency of use; consistency indexbalance of resources; warehouse/ERP; energy balance; capacityK = 0,40·A + 0,30·L + 0,30·RS05-N04-D, S05-N04-R, S05-N03-K, S05-N05-K, S04-N04-K, S06-N04-K≥ 80% key actors agreed; roles and solutions fixed; critical conflicts closed; resource gap ≤ 10%
S05-N04-RDevelopment of the Resource node in the contour of the information field: change the state and increase the potential.resource availability; deficit/surplus; efficiency of use; increase to the baselinebalance of resources; warehouse/ERP; energy balance; capacityR = 0,40·G + 0,30·S + 0,30·VS05-N04-D, S05-N04-K, S05-N03-R, S05-N05-R, S04-N04-R, S06-N04-Rtarget effect confirmed by data; improvement against base line ≥ 10% or reach an approved threshold; the effect is stable ≥ 2 Measurement Cycles
S05-N05-DDiagnostics of the Signal node in the information field contour: measure the current state and deviations.reliability of signals; signal delay; fraction of false alarms; baselinesensors; event logs; appeals; media/network monitoringD = 0,40·C + 0,35·Q + 0,25·TS05-N05-K, S05-N05-R, S05-N04-D, S05-N06-D, S04-N05-D, S06-N05-DData coverage ≥ 90%; relevance in the given SLA; We trace the source; recalculation gives a deviation ≤ 5%
S05-N05-KCoordination of the Signal node in the contour of the information field: coordinate participants, restrictions and actions.reliability of signals; signal delay; proportion of false alarms; consistency indexsensors; event logs; appeals; media/network monitoringK = 0,40·A + 0,30·L + 0,30·RS05-N05-D, S05-N05-R, S05-N04-K, S05-N06-K, S04-N05-K, S06-N05-K≥ 80% key actors agreed; roles and solutions fixed; critical conflicts closed; resource gap ≤ 10%
S05-N05-RDevelopment of the Signal node in the information field contour: change the state and increase the potential.reliability of signals; signal delay; fraction of false alarms; increment to base linesensors; event logs; appeals; media/network monitoringR = 0,40·G + 0,30·S + 0,30·VS05-N05-D, S05-N05-K, S05-N04-R, S05-N06-R, S04-N05-R, S06-N05-Rtarget effect confirmed by data; improvement against base line ≥ 10% or reach an approved threshold; the effect is stable ≥ 2 Measurement Cycles
S05-N06-DDiagnostics of the Knowledge node in the information field contour: measure the current state and deviations.completeness of knowledge; relevance of knowledge; level of evidence; baselineResearch; knowledge bases; publications; expertise; archivesD = 0,40·C + 0,35·Q + 0,25·TS05-N06-K, S05-N06-R, S05-N05-D, S05-N07-D, S04-N06-D, S06-N06-DData coverage ≥ 90%; relevance in the given SLA; We trace the source; recalculation gives a deviation ≤ 5%
S05-N06-KCoordination of the node "Knowledge" in the contour of the information field: to coordinate participants, restrictions and actions.completeness of knowledge; relevance of knowledge; level of evidence; consistency indexResearch; knowledge bases; publications; expertise; archivesK = 0,40·A + 0,30·L + 0,30·RS05-N06-D, S05-N06-R, S05-N05-K, S05-N07-K, S04-N06-K, S06-N06-K≥ 80% key actors agreed; roles and solutions fixed; critical conflicts closed; resource gap ≤ 10%
S05-N06-RDevelopment of the Knowledge node in the contour of the information field: change the state and increase the potential.completeness of knowledge; relevance of knowledge; level of evidence; increase to the baselineResearch; knowledge bases; publications; expertise; archivesR = 0,40·G + 0,30·S + 0,30·VS05-N06-D, S05-N06-K, S05-N05-R, S05-N07-R, S04-N06-R, S06-N06-Rtarget effect confirmed by data; improvement against base line ≥ 10% or reach an approved threshold; the effect is stable ≥ 2 Measurement Cycles
S05-N07-DDiagnostics of the "Solution" node in the information field contour: measure the current state and deviations.speed of decision; quality of decision; proportion of decisions executed; baselineEDMS; protocols; tasks; approval logsD = 0,40·C + 0,35·Q + 0,25·TS05-N07-K, S05-N07-R, S05-N06-D, S05-N08-D, S04-N07-D, S06-N07-DData coverage ≥ 90%; relevance in the given SLA; We trace the source; recalculation gives a deviation ≤ 5%
S05-N07-KCoordination of the node "Solution" in the contour of the information field: to coordinate participants, restrictions and actions.speed of decision; quality of decision; proportion of decisions executed; consistency indexEDMS; protocols; tasks; approval logsK = 0,40·A + 0,30·L + 0,30·RS05-N07-D, S05-N07-R, S05-N06-K, S05-N08-K, S04-N07-K, S06-N07-K≥ 80% key actors agreed; roles and solutions fixed; critical conflicts closed; resource gap ≤ 10%
S05-N07-RDevelopment of the "Solution" node in the contour of the information field: change the state and increase the potential.speed of decision; quality of decision; share of executed decisions; increase to the base lineEDMS; protocols; tasks; approval logsR = 0,40·G + 0,30·S + 0,30·VS05-N07-D, S05-N07-K, S05-N06-R, S05-N08-R, S04-N07-R, S06-N07-Rtarget effect confirmed by data; improvement against base line ≥ 10% or reach an approved threshold; the effect is stable ≥ 2 Measurement Cycles
S05-N08-DDiagnostics of the Action node in the information field contour: measure the current state and deviations.intensity of actions; compliance with deadlines; effectiveness of actions; baselinework plans; trackers; production systems; execution actsD = 0,40·C + 0,35·Q + 0,25·TS05-N08-K, S05-N08-R, S05-N07-D, S05-N09-D, S04-N08-D, S06-N08-DData coverage ≥ 90%; relevance in the given SLA; We trace the source; recalculation gives a deviation ≤ 5%
S05-N08-KCoordination of the node "Action" in the contour of the information field: to coordinate participants, restrictions and actions.intensity of actions; compliance with deadlines; effectiveness of actions; consistency indexwork plans; trackers; production systems; execution actsK = 0,40·A + 0,30·L + 0,30·RS05-N08-D, S05-N08-R, S05-N07-K, S05-N09-K, S04-N08-K, S06-N08-K≥ 80% key actors agreed; roles and solutions fixed; critical conflicts closed; resource gap ≤ 10%
S05-N08-RDevelopment of the Action node in the information field contour: change the state and increase the potential.intensity of actions; compliance with deadlines; effectiveness of actions; increase to the baselinework plans; trackers; production systems; execution actsR = 0,40·G + 0,30·S + 0,30·VS05-N08-D, S05-N08-K, S05-N07-R, S05-N09-R, S04-N08-R, S06-N08-Rtarget effect confirmed by data; improvement against base line ≥ 10% or reach an approved threshold; the effect is stable ≥ 2 Measurement Cycles
S05-N09-DDiagnostics of the "Feedback" node in the contour of the information field: measure the current state and deviations.frequency of feedback; correction rate; the proportion of closed deviations; baselineuser feedback; audits; telemetry; control measurementsD = 0,40·C + 0,35·Q + 0,25·TS05-N09-K, S05-N09-R, S05-N08-D, S05-N10-D, S04-N09-D, S06-N09-DData coverage ≥ 90%; relevance in the given SLA; We trace the source; recalculation gives a deviation ≤ 5%
S05-N09-KCoordination of the "Feedback" node in the contour of the information field: coordinate participants, restrictions and actions.frequency of feedback; correction rate; proportion of closed deviations; consistency indexuser feedback; audits; telemetry; control measurementsK = 0,40·A + 0,30·L + 0,30·RS05-N09-D, S05-N09-R, S05-N08-K, S05-N10-K, S04-N09-K, S06-N09-K≥ 80% key actors agreed; roles and solutions fixed; critical conflicts closed; resource gap ≤ 10%
S05-N09-RDevelopment of the feedback node in the contour of the information field: change the state and increase the potential.frequency of feedback; correction rate; the proportion of closed deviations; increase to the base lineuser feedback; audits; telemetry; control measurementsR = 0,40·G + 0,30·S + 0,30·VS05-N09-D, S05-N09-K, S05-N08-R, S05-N10-R, S04-N09-R, S06-N09-Rtarget effect confirmed by data; improvement against base line ≥ 10% or reach an approved threshold; the effect is stable ≥ 2 Measurement Cycles
S05-N10-DDiagnostics of the Risk node in the information field contour: measure the current state and deviations.probability of risk; extent of damage; residual risk; baselinerisk registers; incidents; insurance events; scenario modelsD = 0,40·C + 0,35·Q + 0,25·TS05-N10-K, S05-N10-R, S05-N09-D, S05-N11-D, S04-N10-D, S06-N10-DData coverage ≥ 90%; relevance in the given SLA; We trace the source; recalculation gives a deviation ≤ 5%
S05-N10-KCoordination of the Risk node in the contour of the information field: coordinate participants, restrictions and actions.probability of risk; extent of damage; residual risk; consistency indexrisk registers; incidents; insurance events; scenario modelsK = 0,40·A + 0,30·L + 0,30·RS05-N10-D, S05-N10-R, S05-N09-K, S05-N11-K, S04-N10-K, S06-N10-K≥ 80% key actors agreed; roles and solutions fixed; critical conflicts closed; resource gap ≤ 10%
S05-N10-RDevelopment of the Risk node in the information field contour: change the state and increase the potential.probability of risk; extent of damage; residual risk; increment to baselinerisk registers; incidents; insurance events; scenario modelsR = 0,40·G + 0,30·S + 0,30·VS05-N10-D, S05-N10-K, S05-N09-R, S05-N11-R, S04-N10-R, S06-N10-Rtarget effect confirmed by data; improvement against base line ≥ 10% or reach an approved threshold; the effect is stable ≥ 2 Measurement Cycles
S05-N11-DDiagnostics of the "Trust" node in the information field contour: measure the current state and deviations.trust index; share of confirmed commitments; stability of interactions; baselinehistory of obligations; ratings; contracts; trust surveysD = 0,40·C + 0,35·Q + 0,25·TS05-N11-K, S05-N11-R, S05-N10-D, S05-N12-D, S04-N11-D, S06-N11-DData coverage ≥ 90%; relevance in the given SLA; We trace the source; recalculation gives a deviation ≤ 5%
S05-N11-KCoordination of the node "Trust" in the contour of the information field: to coordinate participants, restrictions and actions.trust index; share of confirmed commitments; stability of interactions; consistency indexhistory of obligations; ratings; contracts; trust surveysK = 0,40·A + 0,30·L + 0,30·RS05-N11-D, S05-N11-R, S05-N10-K, S05-N12-K, S04-N11-K, S06-N11-K≥ 80% key actors agreed; roles and solutions fixed; critical conflicts closed; resource gap ≤ 10%
S05-N11-RThe development of the "Trust" node in the contour of the information field: change the state and increase the potential.trust index; share of confirmed commitments; stability of interactions; increase to baselinehistory of obligations; ratings; contracts; trust surveysR = 0,40·G + 0,30·S + 0,30·VS05-N11-D, S05-N11-K, S05-N10-R, S05-N12-R, S04-N11-R, S06-N11-Rtarget effect confirmed by data; improvement against base line ≥ 10% or reach an approved threshold; the effect is stable ≥ 2 Measurement Cycles
S05-N12-DDiagnostics of the "Cooperation" node in the information field contour: measure the current state and deviations.number of active links; density of cooperation; share of joint projects; baselinegraph links; agreements; consortia; joint projectsD = 0,40·C + 0,35·Q + 0,25·TS05-N12-K, S05-N12-R, S05-N11-D, S05-N13-D, S04-N12-D, S06-N12-DData coverage ≥ 90%; relevance in the given SLA; We trace the source; recalculation gives a deviation ≤ 5%
S05-N12-KCoordination of the node "Cooperation" in the contour of the information field: to coordinate participants, restrictions and actions.number of active links; density of cooperation; proportion of joint projects; consistency indexgraph links; agreements; consortia; joint projectsK = 0,40·A + 0,30·L + 0,30·RS05-N12-D, S05-N12-R, S05-N11-K, S05-N13-K, S04-N12-K, S06-N12-K≥ 80% key actors agreed; roles and solutions fixed; critical conflicts closed; resource gap ≤ 10%
S05-N12-RDevelopment of the "Cooperation" node in the contour of the information field: change the state and increase the potential.number of active links; density of cooperation; share of joint projects; increase to the baselinegraph links; agreements; consortia; joint projectsR = 0,40·G + 0,30·S + 0,30·VS05-N12-D, S05-N12-K, S05-N11-R, S05-N13-R, S04-N12-R, S06-N12-Rtarget effect confirmed by data; improvement against base line ≥ 10% or reach an approved threshold; the effect is stable ≥ 2 Measurement Cycles
S05-N13-DDiagnostics of the "Infrastructure" node in the contour of the information field: measure the current state and deviations.infrastructure availability; reliability; capacity utilization; base lineGIS; object passports; dispatching; operational logsD = 0,40·C + 0,35·Q + 0,25·TS05-N13-K, S05-N13-R, S05-N12-D, S05-N14-D, S04-N13-D, S06-N13-DData coverage ≥ 90%; relevance in the given SLA; We trace the source; recalculation gives a deviation ≤ 5%
S05-N13-KCoordination of the "Infrastructure" node in the contour of the information field: coordinate participants, restrictions and actions.infrastructure availability; reliability; capacity utilization; consistency indexGIS; object passports; dispatching; operational logsK = 0,40·A + 0,30·L + 0,30·RS05-N13-D, S05-N13-R, S05-N12-K, S05-N14-K, S04-N13-K, S06-N13-K≥ 80% key actors agreed; roles and solutions fixed; critical conflicts closed; resource gap ≤ 10%
S05-N13-RThe development of the "Infrastructure" node in the contour of the information field: change the state and increase the potential.infrastructure availability; reliability; capacity utilization; increase to base lineGIS; object passports; dispatching; operational logsR = 0,40·G + 0,30·S + 0,30·VS05-N13-D, S05-N13-K, S05-N12-R, S05-N14-R, S04-N13-R, S06-N13-Rtarget effect confirmed by data; improvement against base line ≥ 10% or reach an approved threshold; the effect is stable ≥ 2 Measurement Cycles
S05-N14-DDiagnostics of the "Standard" node in the information field contour: measure the current state and deviations.standards coverage; compliance; number of deviations; baselinenormative documents; standards; checklists; audit resultsD = 0,40·C + 0,35·Q + 0,25·TS05-N14-K, S05-N14-R, S05-N13-D, S05-N15-D, S04-N14-D, S06-N14-DData coverage ≥ 90%; relevance in the given SLA; We trace the source; recalculation gives a deviation ≤ 5%
S05-N14-KCoordination of the "Standard" node in the contour of the information field: coordinate participants, restrictions and actions.standards coverage; compliance; number of deviations; consistency indexnormative documents; standards; checklists; audit resultsK = 0,40·A + 0,30·L + 0,30·RS05-N14-D, S05-N14-R, S05-N13-K, S05-N15-K, S04-N14-K, S06-N14-K≥ 80% key actors agreed; roles and solutions fixed; critical conflicts closed; resource gap ≤ 10%
S05-N14-RDevelopment of the Standard node in the contour of the information field: change the state and increase the potential.coverage standards; compliance; number of deviations; increase to baselinenormative documents; standards; checklists; audit resultsR = 0,40·G + 0,30·S + 0,30·VS05-N14-D, S05-N14-K, S05-N13-R, S05-N15-R, S04-N14-R, S06-N14-Rtarget effect confirmed by data; improvement against base line ≥ 10% or reach an approved threshold; the effect is stable ≥ 2 Measurement Cycles
S05-N15-DDiagnostics of the "Finance" node in the information field contour: to measure the current state and deviations.liquidity; resource cost; financial stability; baselineaccounting; budgets; treasury; banking and investment dataD = 0,40·C + 0,35·Q + 0,25·TS05-N15-K, S05-N15-R, S05-N14-D, S05-N16-D, S04-N15-D, S06-N15-DData coverage ≥ 90%; relevance in the given SLA; We trace the source; recalculation gives a deviation ≤ 5%
S05-N15-KCoordination of the "Finance" node in the contour of the information field: coordinate participants, restrictions and actions.liquidity; resource cost; financial stability; consistency indexaccounting; budgets; treasury; banking and investment dataK = 0,40·A + 0,30·L + 0,30·RS05-N15-D, S05-N15-R, S05-N14-K, S05-N16-K, S04-N15-K, S06-N15-K≥ 80% key actors agreed; roles and solutions fixed; critical conflicts closed; resource gap ≤ 10%
S05-N15-RDevelopment of the "Finance" node in the contour of the information field: change the state and increase the potential.liquidity; cost of resource; financial stability; growth to the baselineaccounting; budgets; treasury; banking and investment dataR = 0,40·G + 0,30·S + 0,30·VS05-N15-D, S05-N15-K, S05-N14-R, S05-N16-R, S04-N15-R, S06-N15-Rtarget effect confirmed by data; improvement against base line ≥ 10% or reach an approved threshold; the effect is stable ≥ 2 Measurement Cycles
S05-N16-DDiagnostics of the "Personnel" node in the contour of the information field: measure the current state and deviations.staffing; level of competence; fluidity/continuity; baselineHRIS; competence registers; training; certificationsD = 0,40·C + 0,35·Q + 0,25·TS05-N16-K, S05-N16-R, S05-N15-D, S05-N17-D, S04-N16-D, S06-N16-DData coverage ≥ 90%; relevance in the given SLA; We trace the source; recalculation gives a deviation ≤ 5%
S05-N16-KCoordination of the "Personnel" node in the contour of the information field: coordinate participants, restrictions and actions.staff security; level of competence; fluidity/continuity; consistency indexHRIS; competence registers; training; certificationsK = 0,40·A + 0,30·L + 0,30·RS05-N16-D, S05-N16-R, S05-N15-K, S05-N17-K, S04-N16-K, S06-N16-K≥ 80% key actors agreed; roles and solutions fixed; critical conflicts closed; resource gap ≤ 10%
S05-N16-RThe development of the "Personnel" node in the contour of the information field: change the state and increase the potential.staffing; level of competence; fluidity/continuity; increment to baselineHRIS; competence registers; training; certificationsR = 0,40·G + 0,30·S + 0,30·VS05-N16-D, S05-N16-K, S05-N15-R, S05-N17-R, S04-N16-R, S06-N16-Rtarget effect confirmed by data; improvement against base line ≥ 10% or reach an approved threshold; the effect is stable ≥ 2 Measurement Cycles
S05-N17-DDiagnostics of the "Technology" node in the contour of the information field: to measure the current state and deviations.technology readiness; technology efficiency; scalability; base lineTRL/MRL; patents; tests; digital models; technical cardsD = 0,40·C + 0,35·Q + 0,25·TS05-N17-K, S05-N17-R, S05-N16-D, S05-N18-D, S04-N17-D, S06-N17-DData coverage ≥ 90%; relevance in the given SLA; We trace the source; recalculation gives a deviation ≤ 5%
S05-N17-KCoordination of the node "Technology" in the contour of the information field: to coordinate participants, restrictions and actions.technology readiness; technology efficiency; scalability; consistency indexTRL/MRL; patents; tests; digital models; technical cardsK = 0,40·A + 0,30·L + 0,30·RS05-N17-D, S05-N17-R, S05-N16-K, S05-N18-K, S04-N17-K, S06-N17-K≥ 80% key actors agreed; roles and solutions fixed; critical conflicts closed; resource gap ≤ 10%
S05-N17-RDevelopment of the "Technology" node in the contour of the information field: change the state and increase the potential.technology readiness; technology efficiency; scalability; growth to the baselineTRL/MRL; patents; tests; digital models; technical cardsR = 0,40·G + 0,30·S + 0,30·VS05-N17-D, S05-N17-K, S05-N16-R, S05-N18-R, S04-N17-R, S06-N17-Rtarget effect confirmed by data; improvement against base line ≥ 10% or reach an approved threshold; the effect is stable ≥ 2 Measurement Cycles
S05-N18-DDiagnosis of the node "Environment" in the contour of the information field: to measure the current state and deviations.environmental quality; load on the environment; recovery potential; baselineenvironmental monitoring; GIS; meteo; biocenose observationsD = 0,40·C + 0,35·Q + 0,25·TS05-N18-K, S05-N18-R, S05-N17-D, S05-N19-D, S04-N18-D, S06-N18-DData coverage ≥ 90%; relevance in the given SLA; We trace the source; recalculation gives a deviation ≤ 5%
S05-N18-KCoordination of the node "Environment" in the contour of the information field: to coordinate participants, restrictions and actions.quality of the environment; load on the environment; recovery potential; consistency indexenvironmental monitoring; GIS; meteo; biocenose observationsK = 0,40·A + 0,30·L + 0,30·RS05-N18-D, S05-N18-R, S05-N17-K, S05-N19-K, S04-N18-K, S06-N18-K≥ 80% key actors agreed; roles and solutions fixed; critical conflicts closed; resource gap ≤ 10%
S05-N18-RDevelopment of the "Environment" node in the contour of the information field: change the state and increase the potential.quality of the environment; load on the environment; recovery potential; increase to the baselineenvironmental monitoring; GIS; meteo; biocenose observationsR = 0,40·G + 0,30·S + 0,30·VS05-N18-D, S05-N18-K, S05-N17-R, S05-N19-R, S04-N18-R, S06-N18-Rtarget effect confirmed by data; improvement against base line ≥ 10% or reach an approved threshold; the effect is stable ≥ 2 Measurement Cycles
S05-N19-DDiagnostics of the node "Result" in the contour of the information field: to measure the current state and deviations.result achievement; effect/costs; result stability; baselineKPI; effects statistics; acceptance acts; impact assessmentD = 0,40·C + 0,35·Q + 0,25·TS05-N19-K, S05-N19-R, S05-N18-D, S04-N19-D, S06-N19-DData coverage ≥ 90%; relevance in the given SLA; We trace the source; recalculation gives a deviation ≤ 5%
S05-N19-KCoordination of the node "Result" in the contour of the information field: to coordinate participants, restrictions and actions.achievement of result; effect/costs; sustainability of result; consistency indexKPI; effects statistics; acceptance acts; impact assessmentK = 0,40·A + 0,30·L + 0,30·RS05-N19-D, S05-N19-R, S05-N18-K, S04-N19-K, S06-N19-K≥ 80% key actors agreed; roles and solutions fixed; critical conflicts closed; resource gap ≤ 10%
S05-N19-RDevelopment of the node "Result" in the contour of the information field: change the state and increase the potential.result achievement; effect/costs; result stability; increase to baselineKPI; effects statistics; acceptance acts; impact assessmentR = 0,40·G + 0,30·S + 0,30·VS05-N19-D, S05-N19-K, S05-N18-R, S04-N19-R, S06-N19-Rtarget effect confirmed by data; improvement against base line ≥ 10% or reach an approved threshold; the effect is stable ≥ 2 Measurement Cycles

S06 · Man and Consciousness

The function of the family: human potential, competence, perception and learning. Modules: 57 (19 Node × 3 Status).

CodeFunctionIndicatorsDataFormulaConnectionsValidation criteria
S06-N01-DDiagnosis of the subject node in the human field contour: measure the current state and deviations.identification of subjects; completeness of roles; level of responsibility; baselineregisters of subjects; organizational structures; contracts; role profilesD = 0,40·C + 0,35·Q + 0,25·TS06-N01-K, S06-N01-R, S06-N02-D, S05-N01-D, S07-N01-DData coverage ≥ 90%; relevance in the given SLA; We trace the source; recalculation gives a deviation ≤ 5%
S06-N01-KCoordination of the node "Subject" in the contour of the human field: to coordinate participants, restrictions and actions.identification of subjects; completeness of roles; level of responsibility; consistency indexregisters of subjects; organizational structures; contracts; role profilesK = 0,40·A + 0,30·L + 0,30·RS06-N01-D, S06-N01-R, S06-N02-K, S05-N01-K, S07-N01-K≥ 80% key actors agreed; roles and solutions fixed; critical conflicts closed; resource gap ≤ 10%
S06-N01-RThe development of the subject node in the human field contour: change the state and increase the potential.Identification of subjects; completeness of roles; level of responsibility; increase to the baselineregisters of subjects; organizational structures; contracts; role profilesR = 0,40·G + 0,30·S + 0,30·VS06-N01-D, S06-N01-K, S06-N02-R, S05-N01-R, S07-N01-Rtarget effect confirmed by data; improvement against base line ≥ 10% or reach an approved threshold; the effect is stable ≥ 2 Measurement Cycles
S06-N02-DDiagnostics of the "Purpose" node in the human field contour: measure the current state and deviations.Measurability of objectives; consistency of objectives; proportion of objectives achieved; baselinestrategies; KPI; programs; decision protocolsD = 0,40·C + 0,35·Q + 0,25·TS06-N02-K, S06-N02-R, S06-N01-D, S06-N03-D, S05-N02-D, S07-N02-DData coverage ≥ 90%; relevance in the given SLA; We trace the source; recalculation gives a deviation ≤ 5%
S06-N02-KCoordination of the "Purpose" node in the human field contour: coordinate participants, constraints and actions.Measurability of objectives; Coherence of objectives; Percentage of objectives achieved; Coherence indexstrategies; KPI; programs; decision protocolsK = 0,40·A + 0,30·L + 0,30·RS06-N02-D, S06-N02-R, S06-N01-K, S06-N03-K, S05-N02-K, S07-N02-K≥ 80% key actors agreed; roles and solutions fixed; critical conflicts closed; resource gap ≤ 10%
S06-N02-RThe development of the "Purpose" node in the contour of the human field: change the state and increase the potential.measurability of the goal; consistency of goals; proportion of goals achieved; increase to the baselinestrategies; KPI; programs; decision protocolsR = 0,40·G + 0,30·S + 0,30·VS06-N02-D, S06-N02-K, S06-N01-R, S06-N03-R, S05-N02-R, S07-N02-Rtarget effect confirmed by data; improvement against base line ≥ 10% or reach an approved threshold; the effect is stable ≥ 2 Measurement Cycles
S06-N03-DDiagnostics of the Border node in the human field contour: measure the current state and deviations.clarity of boundaries; number of boundary conflicts; contour stability; baselinecontour maps; regulations; access rights; territorial dataD = 0,40·C + 0,35·Q + 0,25·TS06-N03-K, S06-N03-R, S06-N02-D, S06-N04-D, S05-N03-D, S07-N03-DData coverage ≥ 90%; relevance in the given SLA; We trace the source; recalculation gives a deviation ≤ 5%
S06-N03-KCoordination of the Border node in the contour of the human field: coordinate participants, restrictions and actions.clarity of boundaries; number of boundary conflicts; stability of contour; consistency indexcontour maps; regulations; access rights; territorial dataK = 0,40·A + 0,30·L + 0,30·RS06-N03-D, S06-N03-R, S06-N02-K, S06-N04-K, S05-N03-K, S07-N03-K≥ 80% key actors agreed; roles and solutions fixed; critical conflicts closed; resource gap ≤ 10%
S06-N03-RDevelopment of the Border node in the contour of the human field: change the state and increase the potential.clarity of borders; number of border conflicts; stability of the contour; increment to the baselinecontour maps; regulations; access rights; territorial dataR = 0,40·G + 0,30·S + 0,30·VS06-N03-D, S06-N03-K, S06-N02-R, S06-N04-R, S05-N03-R, S07-N03-Rtarget effect confirmed by data; improvement against base line ≥ 10% or reach an approved threshold; the effect is stable ≥ 2 Measurement Cycles
S06-N04-DDiagnostics of the Resource node in the human field contour: measure the current state and deviations.resource availability; deficit/surplus; efficiency of use; baselinebalance of resources; warehouse/ERP; energy balance; capacityD = 0,40·C + 0,35·Q + 0,25·TS06-N04-K, S06-N04-R, S06-N03-D, S06-N05-D, S05-N04-D, S07-N04-DData coverage ≥ 90%; relevance in the given SLA; We trace the source; recalculation gives a deviation ≤ 5%
S06-N04-KCoordination of the Resource node in the contour of the human field: coordinate participants, restrictions and actions.resource availability; deficit/surplus; efficiency of use; consistency indexbalance of resources; warehouse/ERP; energy balance; capacityK = 0,40·A + 0,30·L + 0,30·RS06-N04-D, S06-N04-R, S06-N03-K, S06-N05-K, S05-N04-K, S07-N04-K≥ 80% key actors agreed; roles and solutions fixed; critical conflicts closed; resource gap ≤ 10%
S06-N04-RDevelopment of the Resource node in the contour of the human field: change the state and increase the potential.resource availability; deficit/surplus; efficiency of use; increase to the baselinebalance of resources; warehouse/ERP; energy balance; capacityR = 0,40·G + 0,30·S + 0,30·VS06-N04-D, S06-N04-K, S06-N03-R, S06-N05-R, S05-N04-R, S07-N04-Rtarget effect confirmed by data; improvement against base line ≥ 10% or reach an approved threshold; the effect is stable ≥ 2 Measurement Cycles
S06-N05-DDiagnostics of the Signal node in the human field contour: measure the current state and deviations.reliability of signals; signal delay; fraction of false alarms; baselinesensors; event logs; appeals; media/network monitoringD = 0,40·C + 0,35·Q + 0,25·TS06-N05-K, S06-N05-R, S06-N04-D, S06-N06-D, S05-N05-D, S07-N05-DData coverage ≥ 90%; relevance in the given SLA; We trace the source; recalculation gives a deviation ≤ 5%
S06-N05-KCoordination of the node "Signal" in the contour of the human field: to coordinate participants, restrictions and actions.reliability of signals; signal delay; proportion of false alarms; consistency indexsensors; event logs; appeals; media/network monitoringK = 0,40·A + 0,30·L + 0,30·RS06-N05-D, S06-N05-R, S06-N04-K, S06-N06-K, S05-N05-K, S07-N05-K≥ 80% key actors agreed; roles and solutions fixed; critical conflicts closed; resource gap ≤ 10%
S06-N05-RDevelopment of the Signal node in the contour of the human field: change the state and increase the potential.reliability of signals; signal delay; fraction of false alarms; increment to base linesensors; event logs; appeals; media/network monitoringR = 0,40·G + 0,30·S + 0,30·VS06-N05-D, S06-N05-K, S06-N04-R, S06-N06-R, S05-N05-R, S07-N05-Rtarget effect confirmed by data; improvement against base line ≥ 10% or reach an approved threshold; the effect is stable ≥ 2 Measurement Cycles
S06-N06-DDiagnostics of the Knowledge node in the human field contour: measure the current state and deviations.completeness of knowledge; relevance of knowledge; level of evidence; baselineResearch; knowledge bases; publications; expertise; archivesD = 0,40·C + 0,35·Q + 0,25·TS06-N06-K, S06-N06-R, S06-N05-D, S06-N07-D, S05-N06-D, S07-N06-DData coverage ≥ 90%; relevance in the given SLA; We trace the source; recalculation gives a deviation ≤ 5%
S06-N06-KCoordination of the node "Knowledge" in the contour of the human field: to coordinate participants, restrictions and actions.completeness of knowledge; relevance of knowledge; level of evidence; consistency indexResearch; knowledge bases; publications; expertise; archivesK = 0,40·A + 0,30·L + 0,30·RS06-N06-D, S06-N06-R, S06-N05-K, S06-N07-K, S05-N06-K, S07-N06-K≥ 80% key actors agreed; roles and solutions fixed; critical conflicts closed; resource gap ≤ 10%
S06-N06-RDevelopment of the Knowledge node in the human field contour: change the state and increase the potential.completeness of knowledge; relevance of knowledge; level of evidence; increase to the baselineResearch; knowledge bases; publications; expertise; archivesR = 0,40·G + 0,30·S + 0,30·VS06-N06-D, S06-N06-K, S06-N05-R, S06-N07-R, S05-N06-R, S07-N06-Rtarget effect confirmed by data; improvement against base line ≥ 10% or reach an approved threshold; the effect is stable ≥ 2 Measurement Cycles
S06-N07-DDiagnostics of the "Solution" node in the human field contour: measure the current state and deviations.speed of decision; quality of decision; proportion of decisions executed; baselineEDMS; protocols; tasks; approval logsD = 0,40·C + 0,35·Q + 0,25·TS06-N07-K, S06-N07-R, S06-N06-D, S06-N08-D, S05-N07-D, S07-N07-DData coverage ≥ 90%; relevance in the given SLA; We trace the source; recalculation gives a deviation ≤ 5%
S06-N07-KCoordination of the "Solution" node in the human field contour: coordinate participants, constraints and actions.speed of decision; quality of decision; proportion of decisions executed; consistency indexEDMS; protocols; tasks; approval logsK = 0,40·A + 0,30·L + 0,30·RS06-N07-D, S06-N07-R, S06-N06-K, S06-N08-K, S05-N07-K, S07-N07-K≥ 80% key actors agreed; roles and solutions fixed; critical conflicts closed; resource gap ≤ 10%
S06-N07-RDevelopment of the “Solution” node in the contour of the human field: change the state and increase the potential.speed of decision; quality of decision; share of executed decisions; increase to the base lineEDMS; protocols; tasks; approval logsR = 0,40·G + 0,30·S + 0,30·VS06-N07-D, S06-N07-K, S06-N06-R, S06-N08-R, S05-N07-R, S07-N07-Rtarget effect confirmed by data; improvement against base line ≥ 10% or reach an approved threshold; the effect is stable ≥ 2 Measurement Cycles
S06-N08-DDiagnostics of the "Action" node in the contour of the human field: to measure the current state and deviations.intensity of actions; compliance with deadlines; effectiveness of actions; baselinework plans; trackers; production systems; execution actsD = 0,40·C + 0,35·Q + 0,25·TS06-N08-K, S06-N08-R, S06-N07-D, S06-N09-D, S05-N08-D, S07-N08-DData coverage ≥ 90%; relevance in the given SLA; We trace the source; recalculation gives a deviation ≤ 5%
S06-N08-KCoordination of the "Action" node in the contour of the human field: coordinate participants, restrictions and actions.intensity of actions; compliance with deadlines; effectiveness of actions; consistency indexwork plans; trackers; production systems; execution actsK = 0,40·A + 0,30·L + 0,30·RS06-N08-D, S06-N08-R, S06-N07-K, S06-N09-K, S05-N08-K, S07-N08-K≥ 80% key actors agreed; roles and solutions fixed; critical conflicts closed; resource gap ≤ 10%
S06-N08-RDevelopment of the Action node in the human field contour: change the state and increase the potential.intensity of actions; compliance with deadlines; effectiveness of actions; increase to the baselinework plans; trackers; production systems; execution actsR = 0,40·G + 0,30·S + 0,30·VS06-N08-D, S06-N08-K, S06-N07-R, S06-N09-R, S05-N08-R, S07-N08-Rtarget effect confirmed by data; improvement against base line ≥ 10% or reach an approved threshold; the effect is stable ≥ 2 Measurement Cycles
S06-N09-DDiagnosis of the "Feedback" node in the contour of the human field: measure the current state and deviations.frequency of feedback; correction rate; the proportion of closed deviations; baselineuser feedback; audits; telemetry; control measurementsD = 0,40·C + 0,35·Q + 0,25·TS06-N09-K, S06-N09-R, S06-N08-D, S06-N10-D, S05-N09-D, S07-N09-DData coverage ≥ 90%; relevance in the given SLA; We trace the source; recalculation gives a deviation ≤ 5%
S06-N09-KCoordination of the "Feedback" node in the contour of the human field: coordinate participants, restrictions and actions.frequency of feedback; correction rate; proportion of closed deviations; consistency indexuser feedback; audits; telemetry; control measurementsK = 0,40·A + 0,30·L + 0,30·RS06-N09-D, S06-N09-R, S06-N08-K, S06-N10-K, S05-N09-K, S07-N09-K≥ 80% key actors agreed; roles and solutions fixed; critical conflicts closed; resource gap ≤ 10%
S06-N09-RDevelopment of the feedback node in the human field contour: change the state and increase the potential.frequency of feedback; correction rate; the proportion of closed deviations; increase to the base lineuser feedback; audits; telemetry; control measurementsR = 0,40·G + 0,30·S + 0,30·VS06-N09-D, S06-N09-K, S06-N08-R, S06-N10-R, S05-N09-R, S07-N09-Rtarget effect confirmed by data; improvement against base line ≥ 10% or reach an approved threshold; the effect is stable ≥ 2 Measurement Cycles
S06-N10-DDiagnosis of the risk node in the human field contour: measure current state and deviations.probability of risk; extent of damage; residual risk; baselinerisk registers; incidents; insurance events; scenario modelsD = 0,40·C + 0,35·Q + 0,25·TS06-N10-K, S06-N10-R, S06-N09-D, S06-N11-D, S05-N10-D, S07-N10-DData coverage ≥ 90%; relevance in the given SLA; We trace the source; recalculation gives a deviation ≤ 5%
S06-N10-KCoordination of the Risk node in the human field contour: coordinate participants, constraints and actions.probability of risk; extent of damage; residual risk; consistency indexrisk registers; incidents; insurance events; scenario modelsK = 0,40·A + 0,30·L + 0,30·RS06-N10-D, S06-N10-R, S06-N09-K, S06-N11-K, S05-N10-K, S07-N10-K≥ 80% key actors agreed; roles and solutions fixed; critical conflicts closed; resource gap ≤ 10%
S06-N10-RDevelopment of the Risk node in the human field contour: change the state and increase the potential.probability of risk; extent of damage; residual risk; increment to baselinerisk registers; incidents; insurance events; scenario modelsR = 0,40·G + 0,30·S + 0,30·VS06-N10-D, S06-N10-K, S06-N09-R, S06-N11-R, S05-N10-R, S07-N10-Rtarget effect confirmed by data; improvement against base line ≥ 10% or reach an approved threshold; the effect is stable ≥ 2 Measurement Cycles
S06-N11-DDiagnostics of the "Trust" node in the contour of the human field: to measure the current state and deviations.trust index; share of confirmed commitments; stability of interactions; baselinehistory of obligations; ratings; contracts; trust surveysD = 0,40·C + 0,35·Q + 0,25·TS06-N11-K, S06-N11-R, S06-N10-D, S06-N12-D, S05-N11-D, S07-N11-DData coverage ≥ 90%; relevance in the given SLA; We trace the source; recalculation gives a deviation ≤ 5%
S06-N11-KCoordination of the "Trust" node in the contour of the human field: coordinate participants, restrictions and actions.trust index; share of confirmed commitments; stability of interactions; consistency indexhistory of obligations; ratings; contracts; trust surveysK = 0,40·A + 0,30·L + 0,30·RS06-N11-D, S06-N11-R, S06-N10-K, S06-N12-K, S05-N11-K, S07-N11-K≥ 80% key actors agreed; roles and solutions fixed; critical conflicts closed; resource gap ≤ 10%
S06-N11-RThe development of the "Trust" node in the contour of the human field: change the state and increase the potential.trust index; share of confirmed commitments; stability of interactions; increase to baselinehistory of obligations; ratings; contracts; trust surveysR = 0,40·G + 0,30·S + 0,30·VS06-N11-D, S06-N11-K, S06-N10-R, S06-N12-R, S05-N11-R, S07-N11-Rtarget effect confirmed by data; improvement against base line ≥ 10% or reach an approved threshold; the effect is stable ≥ 2 Measurement Cycles
S06-N12-DDiagnosis of the "Cooperation" node in the human field contour: measure the current state and deviations.number of active links; density of cooperation; share of joint projects; baselinegraph links; agreements; consortia; joint projectsD = 0,40·C + 0,35·Q + 0,25·TS06-N12-K, S06-N12-R, S06-N11-D, S06-N13-D, S05-N12-D, S07-N12-DData coverage ≥ 90%; relevance in the given SLA; We trace the source; recalculation gives a deviation ≤ 5%
S06-N12-KCoordination of the "Cooperation" node in the contour of the human field: to coordinate participants, restrictions and actions.number of active links; density of cooperation; proportion of joint projects; consistency indexgraph links; agreements; consortia; joint projectsK = 0,40·A + 0,30·L + 0,30·RS06-N12-D, S06-N12-R, S06-N11-K, S06-N13-K, S05-N12-K, S07-N12-K≥ 80% key actors agreed; roles and solutions fixed; critical conflicts closed; resource gap ≤ 10%
S06-N12-RDevelopment of the "Cooperation" node in the contour of the human field: change the state and increase the potential.number of active links; density of cooperation; share of joint projects; increase to the baselinegraph links; agreements; consortia; joint projectsR = 0,40·G + 0,30·S + 0,30·VS06-N12-D, S06-N12-K, S06-N11-R, S06-N13-R, S05-N12-R, S07-N12-Rtarget effect confirmed by data; improvement against base line ≥ 10% or reach an approved threshold; the effect is stable ≥ 2 Measurement Cycles
S06-N13-DDiagnostics of the "Infrastructure" node in the contour of the human field: to measure the current state and deviations.infrastructure availability; reliability; capacity utilization; base lineGIS; object passports; dispatching; operational logsD = 0,40·C + 0,35·Q + 0,25·TS06-N13-K, S06-N13-R, S06-N12-D, S06-N14-D, S05-N13-D, S07-N13-DData coverage ≥ 90%; relevance in the given SLA; We trace the source; recalculation gives a deviation ≤ 5%
S06-N13-KCoordination of the "Infrastructure" node in the contour of the human field: coordinate participants, restrictions and actions.infrastructure availability; reliability; capacity utilization; consistency indexGIS; object passports; dispatching; operational logsK = 0,40·A + 0,30·L + 0,30·RS06-N13-D, S06-N13-R, S06-N12-K, S06-N14-K, S05-N13-K, S07-N13-K≥ 80% key actors agreed; roles and solutions fixed; critical conflicts closed; resource gap ≤ 10%
S06-N13-RThe development of the "Infrastructure" node in the contour of the human field: change the state and increase the potential.infrastructure availability; reliability; capacity utilization; increase to base lineGIS; object passports; dispatching; operational logsR = 0,40·G + 0,30·S + 0,30·VS06-N13-D, S06-N13-K, S06-N12-R, S06-N14-R, S05-N13-R, S07-N13-Rtarget effect confirmed by data; improvement against base line ≥ 10% or reach an approved threshold; the effect is stable ≥ 2 Measurement Cycles
S06-N14-DDiagnostics of the "Standard" node in the contour of the human field: to measure the current state and deviations.standards coverage; compliance; number of deviations; baselinenormative documents; standards; checklists; audit resultsD = 0,40·C + 0,35·Q + 0,25·TS06-N14-K, S06-N14-R, S06-N13-D, S06-N15-D, S05-N14-D, S07-N14-DData coverage ≥ 90%; relevance in the given SLA; We trace the source; recalculation gives a deviation ≤ 5%
S06-N14-KCoordination of the “Standard” node in the human field contour: coordinate participants, constraints and actions.standards coverage; compliance; number of deviations; consistency indexnormative documents; standards; checklists; audit resultsK = 0,40·A + 0,30·L + 0,30·RS06-N14-D, S06-N14-R, S06-N13-K, S06-N15-K, S05-N14-K, S07-N14-K≥ 80% key actors agreed; roles and solutions fixed; critical conflicts closed; resource gap ≤ 10%
S06-N14-RThe development of the “Standard” node in the contour of the human field: change the state and increase the potential.coverage standards; compliance; number of deviations; increase to baselinenormative documents; standards; checklists; audit resultsR = 0,40·G + 0,30·S + 0,30·VS06-N14-D, S06-N14-K, S06-N13-R, S06-N15-R, S05-N14-R, S07-N14-Rtarget effect confirmed by data; improvement against base line ≥ 10% or reach an approved threshold; the effect is stable ≥ 2 Measurement Cycles
S06-N15-DDiagnosis of the "Finance" node in the human field contour: measure the current state and deviations.liquidity; resource cost; financial stability; baselineaccounting; budgets; treasury; banking and investment dataD = 0,40·C + 0,35·Q + 0,25·TS06-N15-K, S06-N15-R, S06-N14-D, S06-N16-D, S05-N15-D, S07-N15-DData coverage ≥ 90%; relevance in the given SLA; We trace the source; recalculation gives a deviation ≤ 5%
S06-N15-KCoordination of the "Finance" node in the contour of the human field: coordinate participants, restrictions and actions.liquidity; resource cost; financial stability; consistency indexaccounting; budgets; treasury; banking and investment dataK = 0,40·A + 0,30·L + 0,30·RS06-N15-D, S06-N15-R, S06-N14-K, S06-N16-K, S05-N15-K, S07-N15-K≥ 80% key actors agreed; roles and solutions fixed; critical conflicts closed; resource gap ≤ 10%
S06-N15-RDevelopment of the "Finance" node in the contour of the human field: change the state and increase the potential.liquidity; cost of resource; financial stability; growth to the baselineaccounting; budgets; treasury; banking and investment dataR = 0,40·G + 0,30·S + 0,30·VS06-N15-D, S06-N15-K, S06-N14-R, S06-N16-R, S05-N15-R, S07-N15-Rtarget effect confirmed by data; improvement against base line ≥ 10% or reach an approved threshold; the effect is stable ≥ 2 Measurement Cycles
S06-N16-DDiagnostics of the "Personnel" node in the human field contour: measure the current state and deviations.staffing; level of competence; fluidity/continuity; baselineHRIS; competence registers; training; certificationsD = 0,40·C + 0,35·Q + 0,25·TS06-N16-K, S06-N16-R, S06-N15-D, S06-N17-D, S05-N16-D, S07-N16-DData coverage ≥ 90%; relevance in the given SLA; We trace the source; recalculation gives a deviation ≤ 5%
S06-N16-KCoordination of the "Personnel" node in the human field contour: coordinate participants, restrictions and actions.staff security; level of competence; fluidity/continuity; consistency indexHRIS; competence registers; training; certificationsK = 0,40·A + 0,30·L + 0,30·RS06-N16-D, S06-N16-R, S06-N15-K, S06-N17-K, S05-N16-K, S07-N16-K≥ 80% key actors agreed; roles and solutions fixed; critical conflicts closed; resource gap ≤ 10%
S06-N16-RThe development of the "Personnel" node in the contour of the human field: change the state and increase the potential.staffing; level of competence; fluidity/continuity; increment to baselineHRIS; competence registers; training; certificationsR = 0,40·G + 0,30·S + 0,30·VS06-N16-D, S06-N16-K, S06-N15-R, S06-N17-R, S05-N16-R, S07-N16-Rtarget effect confirmed by data; improvement against base line ≥ 10% or reach an approved threshold; the effect is stable ≥ 2 Measurement Cycles
S06-N17-DDiagnostics of the "Technology" node in the contour of the human field: to measure the current state and deviations.technology readiness; technology efficiency; scalability; base lineTRL/MRL; patents; tests; digital models; technical cardsD = 0,40·C + 0,35·Q + 0,25·TS06-N17-K, S06-N17-R, S06-N16-D, S06-N18-D, S05-N17-D, S07-N17-DData coverage ≥ 90%; relevance in the given SLA; We trace the source; recalculation gives a deviation ≤ 5%
S06-N17-KCoordination of the node "Technology" in the contour of the human field: to coordinate participants, restrictions and actions.technology readiness; technology efficiency; scalability; consistency indexTRL/MRL; patents; tests; digital models; technical cardsK = 0,40·A + 0,30·L + 0,30·RS06-N17-D, S06-N17-R, S06-N16-K, S06-N18-K, S05-N17-K, S07-N17-K≥ 80% key actors agreed; roles and solutions fixed; critical conflicts closed; resource gap ≤ 10%
S06-N17-RDevelopment of the "Technology" node in the contour of the human field: change the state and increase the potential.technology readiness; technology efficiency; scalability; growth to the baselineTRL/MRL; patents; tests; digital models; technical cardsR = 0,40·G + 0,30·S + 0,30·VS06-N17-D, S06-N17-K, S06-N16-R, S06-N18-R, S05-N17-R, S07-N17-Rtarget effect confirmed by data; improvement against base line ≥ 10% or reach an approved threshold; the effect is stable ≥ 2 Measurement Cycles
S06-N18-DDiagnosis of the node "Wednesday" in the contour of the human field: to measure the current state and deviations.environmental quality; load on the environment; recovery potential; baselineenvironmental monitoring; GIS; meteo; biocenose observationsD = 0,40·C + 0,35·Q + 0,25·TS06-N18-K, S06-N18-R, S06-N17-D, S06-N19-D, S05-N18-D, S07-N18-DData coverage ≥ 90%; relevance in the given SLA; We trace the source; recalculation gives a deviation ≤ 5%
S06-N18-KCoordination of the node "Environment" in the contour of the human field: to coordinate participants, restrictions and actions.quality of the environment; load on the environment; recovery potential; consistency indexenvironmental monitoring; GIS; meteo; biocenose observationsK = 0,40·A + 0,30·L + 0,30·RS06-N18-D, S06-N18-R, S06-N17-K, S06-N19-K, S05-N18-K, S07-N18-K≥ 80% key actors agreed; roles and solutions fixed; critical conflicts closed; resource gap ≤ 10%
S06-N18-RThe development of the "Wednesday" node in the contour of the human field: change the state and increase the potential.quality of the environment; load on the environment; recovery potential; increase to the baselineenvironmental monitoring; GIS; meteo; biocenose observationsR = 0,40·G + 0,30·S + 0,30·VS06-N18-D, S06-N18-K, S06-N17-R, S06-N19-R, S05-N18-R, S07-N18-Rtarget effect confirmed by data; improvement against base line ≥ 10% or reach an approved threshold; the effect is stable ≥ 2 Measurement Cycles
S06-N19-DDiagnostics of the node "Result" in the contour of the human field: measure the current state and deviations.result achievement; effect/costs; result stability; baselineKPI; effects statistics; acceptance acts; impact assessmentD = 0,40·C + 0,35·Q + 0,25·TS06-N19-K, S06-N19-R, S06-N18-D, S05-N19-D, S07-N19-DData coverage ≥ 90%; relevance in the given SLA; We trace the source; recalculation gives a deviation ≤ 5%
S06-N19-KCoordination of the node "Result" in the contour of the human field: coordinate participants, restrictions and actions.achievement of result; effect/costs; sustainability of result; consistency indexKPI; effects statistics; acceptance acts; impact assessmentK = 0,40·A + 0,30·L + 0,30·RS06-N19-D, S06-N19-R, S06-N18-K, S05-N19-K, S07-N19-K≥ 80% key actors agreed; roles and solutions fixed; critical conflicts closed; resource gap ≤ 10%
S06-N19-RDevelopment of the node "Result" in the contour of the human field: change the state and increase the potential.result achievement; effect/costs; result stability; increase to baselineKPI; effects statistics; acceptance acts; impact assessmentR = 0,40·G + 0,30·S + 0,30·VS06-N19-D, S06-N19-K, S06-N18-R, S05-N19-R, S07-N19-Rtarget effect confirmed by data; improvement against base line ≥ 10% or reach an approved threshold; the effect is stable ≥ 2 Measurement Cycles

S07 · Cooperation and Networks

The function of the family: connectivity, trust, contracts and networking. Modules: 57 (19 Node × 3 Status).

CodeFunctionIndicatorsDataFormulaConnectionsValidation criteria
S07-N01-DDiagnostics of the "Subject" node in the cooperative field contour: measure the current state and deviations.identification of subjects; completeness of roles; level of responsibility; baselineregisters of subjects; organizational structures; contracts; role profilesD = 0,40·C + 0,35·Q + 0,25·TS07-N01-K, S07-N01-R, S07-N02-D, S06-N01-D, S08-N01-DData coverage ≥ 90%; relevance in the given SLA; We trace the source; recalculation gives a deviation ≤ 5%
S07-N01-KCoordination of the "Subject" node in the contour of the cooperation field: coordinate participants, restrictions and actions.identification of subjects; completeness of roles; level of responsibility; consistency indexregisters of subjects; organizational structures; contracts; role profilesK = 0,40·A + 0,30·L + 0,30·RS07-N01-D, S07-N01-R, S07-N02-K, S06-N01-K, S08-N01-K≥ 80% key actors agreed; roles and solutions fixed; critical conflicts closed; resource gap ≤ 10%
S07-N01-RDevelopment of the subject node in the contour of the cooperation field: change the state and increase the potential.Identification of subjects; completeness of roles; level of responsibility; increase to the baselineregisters of subjects; organizational structures; contracts; role profilesR = 0,40·G + 0,30·S + 0,30·VS07-N01-D, S07-N01-K, S07-N02-R, S06-N01-R, S08-N01-Rtarget effect confirmed by data; improvement against base line ≥ 10% or reach an approved threshold; the effect is stable ≥ 2 Measurement Cycles
S07-N02-DDiagnostics of the "Purpose" node in the cooperative field contour: measure the current state and deviations.Measurability of objectives; consistency of objectives; proportion of objectives achieved; baselinestrategies; KPI; programs; decision protocolsD = 0,40·C + 0,35·Q + 0,25·TS07-N02-K, S07-N02-R, S07-N01-D, S07-N03-D, S06-N02-D, S08-N02-DData coverage ≥ 90%; relevance in the given SLA; We trace the source; recalculation gives a deviation ≤ 5%
S07-N02-KCoordination of the "Purpose" node in the contour of the cooperation field: coordinate participants, restrictions and actions.Measurability of objectives; Coherence of objectives; Percentage of objectives achieved; Coherence indexstrategies; KPI; programs; decision protocolsK = 0,40·A + 0,30·L + 0,30·RS07-N02-D, S07-N02-R, S07-N01-K, S07-N03-K, S06-N02-K, S08-N02-K≥ 80% key actors agreed; roles and solutions fixed; critical conflicts closed; resource gap ≤ 10%
S07-N02-RDevelopment of the "Purpose" node in the contour of the cooperation field: change the state and increase the potential.measurability of the goal; consistency of goals; proportion of goals achieved; increase to the baselinestrategies; KPI; programs; decision protocolsR = 0,40·G + 0,30·S + 0,30·VS07-N02-D, S07-N02-K, S07-N01-R, S07-N03-R, S06-N02-R, S08-N02-Rtarget effect confirmed by data; improvement against base line ≥ 10% or reach an approved threshold; the effect is stable ≥ 2 Measurement Cycles
S07-N03-DDiagnostics of the Border node in the contour of the cooperation field: measure the current state and deviations.clarity of boundaries; number of boundary conflicts; contour stability; baselinecontour maps; regulations; access rights; territorial dataD = 0,40·C + 0,35·Q + 0,25·TS07-N03-K, S07-N03-R, S07-N02-D, S07-N04-D, S06-N03-D, S08-N03-DData coverage ≥ 90%; relevance in the given SLA; We trace the source; recalculation gives a deviation ≤ 5%
S07-N03-KCoordination of the Border node in the contour of the cooperation field: coordinate participants, restrictions and actions.clarity of boundaries; number of boundary conflicts; stability of contour; consistency indexcontour maps; regulations; access rights; territorial dataK = 0,40·A + 0,30·L + 0,30·RS07-N03-D, S07-N03-R, S07-N02-K, S07-N04-K, S06-N03-K, S08-N03-K≥ 80% key actors agreed; roles and solutions fixed; critical conflicts closed; resource gap ≤ 10%
S07-N03-RDevelopment of the Border node in the contour of the cooperation field: change the state and increase the potential.clarity of borders; number of border conflicts; stability of the contour; increment to the baselinecontour maps; regulations; access rights; territorial dataR = 0,40·G + 0,30·S + 0,30·VS07-N03-D, S07-N03-K, S07-N02-R, S07-N04-R, S06-N03-R, S08-N03-Rtarget effect confirmed by data; improvement against base line ≥ 10% or reach an approved threshold; the effect is stable ≥ 2 Measurement Cycles
S07-N04-DDiagnostics of the Resource node in the contour of the cooperation field: measure the current state and deviations.resource availability; deficit/surplus; efficiency of use; baselinebalance of resources; warehouse/ERP; energy balance; capacityD = 0,40·C + 0,35·Q + 0,25·TS07-N04-K, S07-N04-R, S07-N03-D, S07-N05-D, S06-N04-D, S08-N04-DData coverage ≥ 90%; relevance in the given SLA; We trace the source; recalculation gives a deviation ≤ 5%
S07-N04-KCoordination of the Resource node in the contour of the cooperation field: coordinate participants, restrictions and actions.resource availability; deficit/surplus; efficiency of use; consistency indexbalance of resources; warehouse/ERP; energy balance; capacityK = 0,40·A + 0,30·L + 0,30·RS07-N04-D, S07-N04-R, S07-N03-K, S07-N05-K, S06-N04-K, S08-N04-K≥ 80% key actors agreed; roles and solutions fixed; critical conflicts closed; resource gap ≤ 10%
S07-N04-RDevelopment of the Resource node in the contour of the cooperation field: change the state and increase the potential.resource availability; deficit/surplus; efficiency of use; increase to the baselinebalance of resources; warehouse/ERP; energy balance; capacityR = 0,40·G + 0,30·S + 0,30·VS07-N04-D, S07-N04-K, S07-N03-R, S07-N05-R, S06-N04-R, S08-N04-Rtarget effect confirmed by data; improvement against base line ≥ 10% or reach an approved threshold; the effect is stable ≥ 2 Measurement Cycles
S07-N05-DDiagnostics of the Signal node in the cooperative field contour: measure the current state and deviations.reliability of signals; signal delay; fraction of false alarms; baselinesensors; event logs; appeals; media/network monitoringD = 0,40·C + 0,35·Q + 0,25·TS07-N05-K, S07-N05-R, S07-N04-D, S07-N06-D, S06-N05-D, S08-N05-DData coverage ≥ 90%; relevance in the given SLA; We trace the source; recalculation gives a deviation ≤ 5%
S07-N05-KCoordination of the "Signal" node in the contour of the cooperation field: coordinate participants, restrictions and actions.reliability of signals; signal delay; proportion of false alarms; consistency indexsensors; event logs; appeals; media/network monitoringK = 0,40·A + 0,30·L + 0,30·RS07-N05-D, S07-N05-R, S07-N04-K, S07-N06-K, S06-N05-K, S08-N05-K≥ 80% key actors agreed; roles and solutions fixed; critical conflicts closed; resource gap ≤ 10%
S07-N05-RDevelopment of the Signal node in the contour of the cooperation field: change the state and increase the potential.reliability of signals; signal delay; fraction of false alarms; increment to base linesensors; event logs; appeals; media/network monitoringR = 0,40·G + 0,30·S + 0,30·VS07-N05-D, S07-N05-K, S07-N04-R, S07-N06-R, S06-N05-R, S08-N05-Rtarget effect confirmed by data; improvement against base line ≥ 10% or reach an approved threshold; the effect is stable ≥ 2 Measurement Cycles
S07-N06-DDiagnostics of the Knowledge node in the contour of the cooperation field: measure the current state and deviations.completeness of knowledge; relevance of knowledge; level of evidence; baselineResearch; knowledge bases; publications; expertise; archivesD = 0,40·C + 0,35·Q + 0,25·TS07-N06-K, S07-N06-R, S07-N05-D, S07-N07-D, S06-N06-D, S08-N06-DData coverage ≥ 90%; relevance in the given SLA; We trace the source; recalculation gives a deviation ≤ 5%
S07-N06-KCoordination of the node "Knowledge" in the contour of the cooperation field: to coordinate participants, restrictions and actions.completeness of knowledge; relevance of knowledge; level of evidence; consistency indexResearch; knowledge bases; publications; expertise; archivesK = 0,40·A + 0,30·L + 0,30·RS07-N06-D, S07-N06-R, S07-N05-K, S07-N07-K, S06-N06-K, S08-N06-K≥ 80% key actors agreed; roles and solutions fixed; critical conflicts closed; resource gap ≤ 10%
S07-N06-RDevelopment of the Knowledge node in the contour of the cooperation field: change the state and increase the potential.completeness of knowledge; relevance of knowledge; level of evidence; increase to the baselineResearch; knowledge bases; publications; expertise; archivesR = 0,40·G + 0,30·S + 0,30·VS07-N06-D, S07-N06-K, S07-N05-R, S07-N07-R, S06-N06-R, S08-N06-Rtarget effect confirmed by data; improvement against base line ≥ 10% or reach an approved threshold; the effect is stable ≥ 2 Measurement Cycles
S07-N07-DDiagnostics of the node "Solution" in the contour of the cooperative field: measure the current state and deviations.speed of decision; quality of decision; proportion of decisions executed; baselineEDMS; protocols; tasks; approval logsD = 0,40·C + 0,35·Q + 0,25·TS07-N07-K, S07-N07-R, S07-N06-D, S07-N08-D, S06-N07-D, S08-N07-DData coverage ≥ 90%; relevance in the given SLA; We trace the source; recalculation gives a deviation ≤ 5%
S07-N07-KCoordination of the node "Solution" in the contour of the cooperation field: to coordinate participants, restrictions and actions.speed of decision; quality of decision; proportion of decisions executed; consistency indexEDMS; protocols; tasks; approval logsK = 0,40·A + 0,30·L + 0,30·RS07-N07-D, S07-N07-R, S07-N06-K, S07-N08-K, S06-N07-K, S08-N07-K≥ 80% key actors agreed; roles and solutions fixed; critical conflicts closed; resource gap ≤ 10%
S07-N07-RDevelopment of the "Solution" node in the contour of the cooperation field: change the state and increase the potential.speed of decision; quality of decision; share of executed decisions; increase to the base lineEDMS; protocols; tasks; approval logsR = 0,40·G + 0,30·S + 0,30·VS07-N07-D, S07-N07-K, S07-N06-R, S07-N08-R, S06-N07-R, S08-N07-Rtarget effect confirmed by data; improvement against base line ≥ 10% or reach an approved threshold; the effect is stable ≥ 2 Measurement Cycles
S07-N08-DDiagnostics of the "Action" node in the contour of the cooperation field: measure the current state and deviations.intensity of actions; compliance with deadlines; effectiveness of actions; baselinework plans; trackers; production systems; execution actsD = 0,40·C + 0,35·Q + 0,25·TS07-N08-K, S07-N08-R, S07-N07-D, S07-N09-D, S06-N08-D, S08-N08-DData coverage ≥ 90%; relevance in the given SLA; We trace the source; recalculation gives a deviation ≤ 5%
S07-N08-KCoordination of the "Action" node in the contour of the cooperation field: coordinate participants, restrictions and actions.intensity of actions; compliance with deadlines; effectiveness of actions; consistency indexwork plans; trackers; production systems; execution actsK = 0,40·A + 0,30·L + 0,30·RS07-N08-D, S07-N08-R, S07-N07-K, S07-N09-K, S06-N08-K, S08-N08-K≥ 80% key actors agreed; roles and solutions fixed; critical conflicts closed; resource gap ≤ 10%
S07-N08-RDevelopment of the Action node in the contour of the cooperation field: change the state and increase the potential.intensity of actions; compliance with deadlines; effectiveness of actions; increase to the baselinework plans; trackers; production systems; execution actsR = 0,40·G + 0,30·S + 0,30·VS07-N08-D, S07-N08-K, S07-N07-R, S07-N09-R, S06-N08-R, S08-N08-Rtarget effect confirmed by data; improvement against base line ≥ 10% or reach an approved threshold; the effect is stable ≥ 2 Measurement Cycles
S07-N09-DDiagnosis of the "Feedback" node in the contour of the cooperation field: measure the current state and deviations.frequency of feedback; correction rate; the proportion of closed deviations; baselineuser feedback; audits; telemetry; control measurementsD = 0,40·C + 0,35·Q + 0,25·TS07-N09-K, S07-N09-R, S07-N08-D, S07-N10-D, S06-N09-D, S08-N09-DData coverage ≥ 90%; relevance in the given SLA; We trace the source; recalculation gives a deviation ≤ 5%
S07-N09-KCoordination of the "Feedback" node in the contour of the cooperation field: coordinate participants, restrictions and actions.frequency of feedback; correction rate; proportion of closed deviations; consistency indexuser feedback; audits; telemetry; control measurementsK = 0,40·A + 0,30·L + 0,30·RS07-N09-D, S07-N09-R, S07-N08-K, S07-N10-K, S06-N09-K, S08-N09-K≥ 80% key actors agreed; roles and solutions fixed; critical conflicts closed; resource gap ≤ 10%
S07-N09-RDevelopment of the feedback node in the contour of the cooperation field: change the state and increase the potential.frequency of feedback; correction rate; the proportion of closed deviations; increase to the base lineuser feedback; audits; telemetry; control measurementsR = 0,40·G + 0,30·S + 0,30·VS07-N09-D, S07-N09-K, S07-N08-R, S07-N10-R, S06-N09-R, S08-N09-Rtarget effect confirmed by data; improvement against base line ≥ 10% or reach an approved threshold; the effect is stable ≥ 2 Measurement Cycles
S07-N10-DDiagnosis of the Risk node in the cooperative field contour: measure the current state and deviations.probability of risk; extent of damage; residual risk; baselinerisk registers; incidents; insurance events; scenario modelsD = 0,40·C + 0,35·Q + 0,25·TS07-N10-K, S07-N10-R, S07-N09-D, S07-N11-D, S06-N10-D, S08-N10-DData coverage ≥ 90%; relevance in the given SLA; We trace the source; recalculation gives a deviation ≤ 5%
S07-N10-KCoordination of the Risk node in the contour of the cooperation field: coordinate participants, restrictions and actions.probability of risk; extent of damage; residual risk; consistency indexrisk registers; incidents; insurance events; scenario modelsK = 0,40·A + 0,30·L + 0,30·RS07-N10-D, S07-N10-R, S07-N09-K, S07-N11-K, S06-N10-K, S08-N10-K≥ 80% key actors agreed; roles and solutions fixed; critical conflicts closed; resource gap ≤ 10%
S07-N10-RDevelopment of the Risk node in the contour of the cooperation field: change the state and increase the potential.probability of risk; extent of damage; residual risk; increment to baselinerisk registers; incidents; insurance events; scenario modelsR = 0,40·G + 0,30·S + 0,30·VS07-N10-D, S07-N10-K, S07-N09-R, S07-N11-R, S06-N10-R, S08-N10-Rtarget effect confirmed by data; improvement against base line ≥ 10% or reach an approved threshold; the effect is stable ≥ 2 Measurement Cycles
S07-N11-DDiagnostics of the "Trust" node in the contour of the cooperation field: measure the current state and deviations.trust index; share of confirmed commitments; stability of interactions; baselinehistory of obligations; ratings; contracts; trust surveysD = 0,40·C + 0,35·Q + 0,25·TS07-N11-K, S07-N11-R, S07-N10-D, S07-N12-D, S06-N11-D, S08-N11-DData coverage ≥ 90%; relevance in the given SLA; We trace the source; recalculation gives a deviation ≤ 5%
S07-N11-KCoordination of the "Trust" node in the contour of the cooperation field: coordinate participants, restrictions and actions.trust index; share of confirmed commitments; stability of interactions; consistency indexhistory of obligations; ratings; contracts; trust surveysK = 0,40·A + 0,30·L + 0,30·RS07-N11-D, S07-N11-R, S07-N10-K, S07-N12-K, S06-N11-K, S08-N11-K≥ 80% key actors agreed; roles and solutions fixed; critical conflicts closed; resource gap ≤ 10%
S07-N11-RDevelopment of the "Trust" node in the contour of the cooperation field: change the state and increase the potential.trust index; share of confirmed commitments; stability of interactions; increase to baselinehistory of obligations; ratings; contracts; trust surveysR = 0,40·G + 0,30·S + 0,30·VS07-N11-D, S07-N11-K, S07-N10-R, S07-N12-R, S06-N11-R, S08-N11-Rtarget effect confirmed by data; improvement against base line ≥ 10% or reach an approved threshold; the effect is stable ≥ 2 Measurement Cycles
S07-N12-DDiagnosis of the "Cooperation" node in the contour of the cooperation field: measure the current state and deviations.number of active links; density of cooperation; share of joint projects; baselinegraph links; agreements; consortia; joint projectsD = 0,40·C + 0,35·Q + 0,25·TS07-N12-K, S07-N12-R, S07-N11-D, S07-N13-D, S06-N12-D, S08-N12-DData coverage ≥ 90%; relevance in the given SLA; We trace the source; recalculation gives a deviation ≤ 5%
S07-N12-KCoordination of the "Cooperation" node in the contour of the cooperation field: coordinate participants, restrictions and actions.number of active links; density of cooperation; proportion of joint projects; consistency indexgraph links; agreements; consortia; joint projectsK = 0,40·A + 0,30·L + 0,30·RS07-N12-D, S07-N12-R, S07-N11-K, S07-N13-K, S06-N12-K, S08-N12-K≥ 80% key actors agreed; roles and solutions fixed; critical conflicts closed; resource gap ≤ 10%
S07-N12-RDevelopment of the "Cooperation" node in the contour of the cooperation field: change the state and increase the potential.number of active links; density of cooperation; share of joint projects; increase to the baselinegraph links; agreements; consortia; joint projectsR = 0,40·G + 0,30·S + 0,30·VS07-N12-D, S07-N12-K, S07-N11-R, S07-N13-R, S06-N12-R, S08-N12-Rtarget effect confirmed by data; improvement against base line ≥ 10% or reach an approved threshold; the effect is stable ≥ 2 Measurement Cycles
S07-N13-DDiagnostics of the "Infrastructure" node in the contour of the cooperation field: measure the current state and deviations.infrastructure availability; reliability; capacity utilization; base lineGIS; object passports; dispatching; operational logsD = 0,40·C + 0,35·Q + 0,25·TS07-N13-K, S07-N13-R, S07-N12-D, S07-N14-D, S06-N13-D, S08-N13-DData coverage ≥ 90%; relevance in the given SLA; We trace the source; recalculation gives a deviation ≤ 5%
S07-N13-KCoordination of the "Infrastructure" node in the contour of the cooperation field: coordinate participants, restrictions and actions.infrastructure availability; reliability; capacity utilization; consistency indexGIS; object passports; dispatching; operational logsK = 0,40·A + 0,30·L + 0,30·RS07-N13-D, S07-N13-R, S07-N12-K, S07-N14-K, S06-N13-K, S08-N13-K≥ 80% key actors agreed; roles and solutions fixed; critical conflicts closed; resource gap ≤ 10%
S07-N13-RDevelopment of the Infrastructure node in the contour of the cooperation field: change the state and increase the potential.infrastructure availability; reliability; capacity utilization; increase to base lineGIS; object passports; dispatching; operational logsR = 0,40·G + 0,30·S + 0,30·VS07-N13-D, S07-N13-K, S07-N12-R, S07-N14-R, S06-N13-R, S08-N13-Rtarget effect confirmed by data; improvement against base line ≥ 10% or reach an approved threshold; the effect is stable ≥ 2 Measurement Cycles
S07-N14-DDiagnostics of the "Standard" node in the contour of the cooperation field: measure the current state and deviations.standards coverage; compliance; number of deviations; baselinenormative documents; standards; checklists; audit resultsD = 0,40·C + 0,35·Q + 0,25·TS07-N14-K, S07-N14-R, S07-N13-D, S07-N15-D, S06-N14-D, S08-N14-DData coverage ≥ 90%; relevance in the given SLA; We trace the source; recalculation gives a deviation ≤ 5%
S07-N14-KCoordination of the "Standard" node in the contour of the cooperation field: coordinate participants, restrictions and actions.standards coverage; compliance; number of deviations; consistency indexnormative documents; standards; checklists; audit resultsK = 0,40·A + 0,30·L + 0,30·RS07-N14-D, S07-N14-R, S07-N13-K, S07-N15-K, S06-N14-K, S08-N14-K≥ 80% key actors agreed; roles and solutions fixed; critical conflicts closed; resource gap ≤ 10%
S07-N14-RDevelopment of the Standard node in the contour of the cooperation field: change the state and increase the potential.coverage standards; compliance; number of deviations; increase to baselinenormative documents; standards; checklists; audit resultsR = 0,40·G + 0,30·S + 0,30·VS07-N14-D, S07-N14-K, S07-N13-R, S07-N15-R, S06-N14-R, S08-N14-Rtarget effect confirmed by data; improvement against base line ≥ 10% or reach an approved threshold; the effect is stable ≥ 2 Measurement Cycles
S07-N15-DDiagnosis of the "Finance" node in the contour of the cooperation field: measure the current state and deviations.liquidity; resource cost; financial stability; baselineaccounting; budgets; treasury; banking and investment dataD = 0,40·C + 0,35·Q + 0,25·TS07-N15-K, S07-N15-R, S07-N14-D, S07-N16-D, S06-N15-D, S08-N15-DData coverage ≥ 90%; relevance in the given SLA; We trace the source; recalculation gives a deviation ≤ 5%
S07-N15-KCoordination of the "Finance" node in the contour of the cooperation field: coordinate participants, restrictions and actions.liquidity; resource cost; financial stability; consistency indexaccounting; budgets; treasury; banking and investment dataK = 0,40·A + 0,30·L + 0,30·RS07-N15-D, S07-N15-R, S07-N14-K, S07-N16-K, S06-N15-K, S08-N15-K≥ 80% key actors agreed; roles and solutions fixed; critical conflicts closed; resource gap ≤ 10%
S07-N15-RDevelopment of the "Finance" node in the contour of the cooperation field: change the state and increase the potential.liquidity; cost of resource; financial stability; growth to the baselineaccounting; budgets; treasury; banking and investment dataR = 0,40·G + 0,30·S + 0,30·VS07-N15-D, S07-N15-K, S07-N14-R, S07-N16-R, S06-N15-R, S08-N15-Rtarget effect confirmed by data; improvement against base line ≥ 10% or reach an approved threshold; the effect is stable ≥ 2 Measurement Cycles
S07-N16-DDiagnostics of the "Personnel" node in the contour of the cooperation field: measure the current state and deviations.staffing; level of competence; fluidity/continuity; baselineHRIS; competence registers; training; certificationsD = 0,40·C + 0,35·Q + 0,25·TS07-N16-K, S07-N16-R, S07-N15-D, S07-N17-D, S06-N16-D, S08-N16-DData coverage ≥ 90%; relevance in the given SLA; We trace the source; recalculation gives a deviation ≤ 5%
S07-N16-KCoordination of the "Personnel" node in the contour of the cooperation field: coordinate participants, restrictions and actions.staff security; level of competence; fluidity/continuity; consistency indexHRIS; competence registers; training; certificationsK = 0,40·A + 0,30·L + 0,30·RS07-N16-D, S07-N16-R, S07-N15-K, S07-N17-K, S06-N16-K, S08-N16-K≥ 80% key actors agreed; roles and solutions fixed; critical conflicts closed; resource gap ≤ 10%
S07-N16-RDevelopment of the Personnel node in the contour of the cooperation field: change the state and increase the potential.staffing; level of competence; fluidity/continuity; increment to baselineHRIS; competence registers; training; certificationsR = 0,40·G + 0,30·S + 0,30·VS07-N16-D, S07-N16-K, S07-N15-R, S07-N17-R, S06-N16-R, S08-N16-Rtarget effect confirmed by data; improvement against base line ≥ 10% or reach an approved threshold; the effect is stable ≥ 2 Measurement Cycles
S07-N17-DDiagnostics of the "Technology" node in the contour of the cooperation field: measure the current state and deviations.technology readiness; technology efficiency; scalability; base lineTRL/MRL; patents; tests; digital models; technical cardsD = 0,40·C + 0,35·Q + 0,25·TS07-N17-K, S07-N17-R, S07-N16-D, S07-N18-D, S06-N17-D, S08-N17-DData coverage ≥ 90%; relevance in the given SLA; We trace the source; recalculation gives a deviation ≤ 5%
S07-N17-KCoordination of the "Technology" node in the contour of the cooperation field: coordinate participants, restrictions and actions.technology readiness; technology efficiency; scalability; consistency indexTRL/MRL; patents; tests; digital models; technical cardsK = 0,40·A + 0,30·L + 0,30·RS07-N17-D, S07-N17-R, S07-N16-K, S07-N18-K, S06-N17-K, S08-N17-K≥ 80% key actors agreed; roles and solutions fixed; critical conflicts closed; resource gap ≤ 10%
S07-N17-RDevelopment of the "Technology" node in the contour of the cooperation field: change the state and increase the potential.technology readiness; technology efficiency; scalability; growth to the baselineTRL/MRL; patents; tests; digital models; technical cardsR = 0,40·G + 0,30·S + 0,30·VS07-N17-D, S07-N17-K, S07-N16-R, S07-N18-R, S06-N17-R, S08-N17-Rtarget effect confirmed by data; improvement against base line ≥ 10% or reach an approved threshold; the effect is stable ≥ 2 Measurement Cycles
S07-N18-DDiagnosis of the node "Wednesday" in the contour of the cooperative field: measure the current state and deviations.environmental quality; load on the environment; recovery potential; baselineenvironmental monitoring; GIS; meteo; biocenose observationsD = 0,40·C + 0,35·Q + 0,25·TS07-N18-K, S07-N18-R, S07-N17-D, S07-N19-D, S06-N18-D, S08-N18-DData coverage ≥ 90%; relevance in the given SLA; We trace the source; recalculation gives a deviation ≤ 5%
S07-N18-KCoordination of the "Wednesday" node in the contour of the cooperation field: coordinate participants, restrictions and actions.quality of the environment; load on the environment; recovery potential; consistency indexenvironmental monitoring; GIS; meteo; biocenose observationsK = 0,40·A + 0,30·L + 0,30·RS07-N18-D, S07-N18-R, S07-N17-K, S07-N19-K, S06-N18-K, S08-N18-K≥ 80% key actors agreed; roles and solutions fixed; critical conflicts closed; resource gap ≤ 10%
S07-N18-RDevelopment of the "Wednesday" node in the contour of the cooperation field: change the state and increase the potential.quality of the environment; load on the environment; recovery potential; increase to the baselineenvironmental monitoring; GIS; meteo; biocenose observationsR = 0,40·G + 0,30·S + 0,30·VS07-N18-D, S07-N18-K, S07-N17-R, S07-N19-R, S06-N18-R, S08-N18-Rtarget effect confirmed by data; improvement against base line ≥ 10% or reach an approved threshold; the effect is stable ≥ 2 Measurement Cycles
S07-N19-DDiagnostics of the node "Result" in the contour of the cooperation field: measure the current state and deviations.result achievement; effect/costs; result stability; baselineKPI; effects statistics; acceptance acts; impact assessmentD = 0,40·C + 0,35·Q + 0,25·TS07-N19-K, S07-N19-R, S07-N18-D, S06-N19-D, S08-N19-DData coverage ≥ 90%; relevance in the given SLA; We trace the source; recalculation gives a deviation ≤ 5%
S07-N19-KCoordination of the node "Result" in the contour of the cooperation field: to coordinate participants, restrictions and actions.achievement of result; effect/costs; sustainability of result; consistency indexKPI; effects statistics; acceptance acts; impact assessmentK = 0,40·A + 0,30·L + 0,30·RS07-N19-D, S07-N19-R, S07-N18-K, S06-N19-K, S08-N19-K≥ 80% key actors agreed; roles and solutions fixed; critical conflicts closed; resource gap ≤ 10%
S07-N19-RDevelopment of the node "Result" in the contour of the cooperation field: change the state and increase the potential.result achievement; effect/costs; result stability; increase to baselineKPI; effects statistics; acceptance acts; impact assessmentR = 0,40·G + 0,30·S + 0,30·VS07-N19-D, S07-N19-K, S07-N18-R, S06-N19-R, S08-N19-Rtarget effect confirmed by data; improvement against base line ≥ 10% or reach an approved threshold; the effect is stable ≥ 2 Measurement Cycles

S08 · Balance and sustainability

Family Function: Balance, Resilience, Adaptation and Recovery. Modules: 57 (19 Node × 3 Status).

CodeFunctionIndicatorsDataFormulaConnectionsValidation criteria
S08-N01-DDiagnostics of the "Subject" node in the contour of a stable field: measure the current state and deviations.identification of subjects; completeness of roles; level of responsibility; baselineregisters of subjects; organizational structures; contracts; role profilesD = 0,40·C + 0,35·Q + 0,25·TS08-N01-K, S08-N01-R, S08-N02-D, S07-N01-D, S09-N01-DData coverage ≥ 90%; relevance in the given SLA; We trace the source; recalculation gives a deviation ≤ 5%
S08-N01-KCoordination of the node "Subject" in the contour of a stable field: to coordinate participants, restrictions and actions.identification of subjects; completeness of roles; level of responsibility; consistency indexregisters of subjects; organizational structures; contracts; role profilesK = 0,40·A + 0,30·L + 0,30·RS08-N01-D, S08-N01-R, S08-N02-K, S07-N01-K, S09-N01-K≥ 80% key actors agreed; roles and solutions fixed; critical conflicts closed; resource gap ≤ 10%
S08-N01-RDevelopment of the subject node in the contour of a stable field: change the state and increase the potential.Identification of subjects; completeness of roles; level of responsibility; increase to the baselineregisters of subjects; organizational structures; contracts; role profilesR = 0,40·G + 0,30·S + 0,30·VS08-N01-D, S08-N01-K, S08-N02-R, S07-N01-R, S09-N01-Rtarget effect confirmed by data; improvement against base line ≥ 10% or reach an approved threshold; the effect is stable ≥ 2 Measurement Cycles
S08-N02-DDiagnostics of the "Purpose" node in the contour of a stable field: measure the current state and deviations.Measurability of objectives; consistency of objectives; proportion of objectives achieved; baselinestrategies; KPI; programs; decision protocolsD = 0,40·C + 0,35·Q + 0,25·TS08-N02-K, S08-N02-R, S08-N01-D, S08-N03-D, S07-N02-D, S09-N02-DData coverage ≥ 90%; relevance in the given SLA; We trace the source; recalculation gives a deviation ≤ 5%
S08-N02-KCoordination of the “Purpose” node in the contour of a sustainable field: coordinate participants, restrictions and actions.Measurability of objectives; Coherence of objectives; Percentage of objectives achieved; Coherence indexstrategies; KPI; programs; decision protocolsK = 0,40·A + 0,30·L + 0,30·RS08-N02-D, S08-N02-R, S08-N01-K, S08-N03-K, S07-N02-K, S09-N02-K≥ 80% key actors agreed; roles and solutions fixed; critical conflicts closed; resource gap ≤ 10%
S08-N02-RThe development of the "Purpose" node in the contour of a stable field: change the state and increase the potential.measurability of the goal; consistency of goals; proportion of goals achieved; increase to the baselinestrategies; KPI; programs; decision protocolsR = 0,40·G + 0,30·S + 0,30·VS08-N02-D, S08-N02-K, S08-N01-R, S08-N03-R, S07-N02-R, S09-N02-Rtarget effect confirmed by data; improvement against base line ≥ 10% or reach an approved threshold; the effect is stable ≥ 2 Measurement Cycles
S08-N03-DDiagnostics of the Border node in the contour of a stable field: measure the current state and deviations.clarity of boundaries; number of boundary conflicts; contour stability; baselinecontour maps; regulations; access rights; territorial dataD = 0,40·C + 0,35·Q + 0,25·TS08-N03-K, S08-N03-R, S08-N02-D, S08-N04-D, S07-N03-D, S09-N03-DData coverage ≥ 90%; relevance in the given SLA; We trace the source; recalculation gives a deviation ≤ 5%
S08-N03-KCoordination of the Border node in the contour of a stable field: coordinate participants, restrictions and actions.clarity of boundaries; number of boundary conflicts; stability of contour; consistency indexcontour maps; regulations; access rights; territorial dataK = 0,40·A + 0,30·L + 0,30·RS08-N03-D, S08-N03-R, S08-N02-K, S08-N04-K, S07-N03-K, S09-N03-K≥ 80% key actors agreed; roles and solutions fixed; critical conflicts closed; resource gap ≤ 10%
S08-N03-RDevelopment of the Border node in the contour of a stable field: change the state and increase the potential.clarity of borders; number of border conflicts; stability of the contour; increment to the baselinecontour maps; regulations; access rights; territorial dataR = 0,40·G + 0,30·S + 0,30·VS08-N03-D, S08-N03-K, S08-N02-R, S08-N04-R, S07-N03-R, S09-N03-Rtarget effect confirmed by data; improvement against base line ≥ 10% or reach an approved threshold; the effect is stable ≥ 2 Measurement Cycles
S08-N04-DDiagnostics of the Resource node in the contour of a stable field: measure the current state and deviations.resource availability; deficit/surplus; efficiency of use; baselinebalance of resources; warehouse/ERP; energy balance; capacityD = 0,40·C + 0,35·Q + 0,25·TS08-N04-K, S08-N04-R, S08-N03-D, S08-N05-D, S07-N04-D, S09-N04-DData coverage ≥ 90%; relevance in the given SLA; We trace the source; recalculation gives a deviation ≤ 5%
S08-N04-KCoordination of the Resource node in the contour of a sustainable field: coordinate participants, restrictions and actions.resource availability; deficit/surplus; efficiency of use; consistency indexbalance of resources; warehouse/ERP; energy balance; capacityK = 0,40·A + 0,30·L + 0,30·RS08-N04-D, S08-N04-R, S08-N03-K, S08-N05-K, S07-N04-K, S09-N04-K≥ 80% key actors agreed; roles and solutions fixed; critical conflicts closed; resource gap ≤ 10%
S08-N04-RDevelopment of the Resource node in the contour of a sustainable field: change the state and increase the potential.resource availability; deficit/surplus; efficiency of use; increase to the baselinebalance of resources; warehouse/ERP; energy balance; capacityR = 0,40·G + 0,30·S + 0,30·VS08-N04-D, S08-N04-K, S08-N03-R, S08-N05-R, S07-N04-R, S09-N04-Rtarget effect confirmed by data; improvement against base line ≥ 10% or reach an approved threshold; the effect is stable ≥ 2 Measurement Cycles
S08-N05-DDiagnostics of the Signal node in the contour of the stable field: measure the current state and deviations.reliability of signals; signal delay; fraction of false alarms; baselinesensors; event logs; appeals; media/network monitoringD = 0,40·C + 0,35·Q + 0,25·TS08-N05-K, S08-N05-R, S08-N04-D, S08-N06-D, S07-N05-D, S09-N05-DData coverage ≥ 90%; relevance in the given SLA; We trace the source; recalculation gives a deviation ≤ 5%
S08-N05-KCoordination of the Signal node in the contour of a stable field: coordinate participants, restrictions and actions.reliability of signals; signal delay; proportion of false alarms; consistency indexsensors; event logs; appeals; media/network monitoringK = 0,40·A + 0,30·L + 0,30·RS08-N05-D, S08-N05-R, S08-N04-K, S08-N06-K, S07-N05-K, S09-N05-K≥ 80% key actors agreed; roles and solutions fixed; critical conflicts closed; resource gap ≤ 10%
S08-N05-RDevelopment of the Signal node in the contour of a stable field: change the state and increase the potential.reliability of signals; signal delay; fraction of false alarms; increment to base linesensors; event logs; appeals; media/network monitoringR = 0,40·G + 0,30·S + 0,30·VS08-N05-D, S08-N05-K, S08-N04-R, S08-N06-R, S07-N05-R, S09-N05-Rtarget effect confirmed by data; improvement against base line ≥ 10% or reach an approved threshold; the effect is stable ≥ 2 Measurement Cycles
S08-N06-DDiagnostics of the Knowledge node in the contour of a stable field: measure the current state and deviations.completeness of knowledge; relevance of knowledge; level of evidence; baselineResearch; knowledge bases; publications; expertise; archivesD = 0,40·C + 0,35·Q + 0,25·TS08-N06-K, S08-N06-R, S08-N05-D, S08-N07-D, S07-N06-D, S09-N06-DData coverage ≥ 90%; relevance in the given SLA; We trace the source; recalculation gives a deviation ≤ 5%
S08-N06-KCoordination of the node "Knowledge" in the contour of a stable field: to coordinate participants, restrictions and actions.completeness of knowledge; relevance of knowledge; level of evidence; consistency indexResearch; knowledge bases; publications; expertise; archivesK = 0,40·A + 0,30·L + 0,30·RS08-N06-D, S08-N06-R, S08-N05-K, S08-N07-K, S07-N06-K, S09-N06-K≥ 80% key actors agreed; roles and solutions fixed; critical conflicts closed; resource gap ≤ 10%
S08-N06-RDevelopment of the Knowledge node in the contour of a stable field: change the state and increase the potential.completeness of knowledge; relevance of knowledge; level of evidence; increase to the baselineResearch; knowledge bases; publications; expertise; archivesR = 0,40·G + 0,30·S + 0,30·VS08-N06-D, S08-N06-K, S08-N05-R, S08-N07-R, S07-N06-R, S09-N06-Rtarget effect confirmed by data; improvement against base line ≥ 10% or reach an approved threshold; the effect is stable ≥ 2 Measurement Cycles
S08-N07-DDiagnostics of the "Solution" node in the contour of a stable field: measure the current state and deviations.speed of decision; quality of decision; proportion of decisions executed; baselineEDMS; protocols; tasks; approval logsD = 0,40·C + 0,35·Q + 0,25·TS08-N07-K, S08-N07-R, S08-N06-D, S08-N08-D, S07-N07-D, S09-N07-DData coverage ≥ 90%; relevance in the given SLA; We trace the source; recalculation gives a deviation ≤ 5%
S08-N07-KCoordination of the node "Solution" in the contour of a stable field: to coordinate participants, restrictions and actions.speed of decision; quality of decision; proportion of decisions executed; consistency indexEDMS; protocols; tasks; approval logsK = 0,40·A + 0,30·L + 0,30·RS08-N07-D, S08-N07-R, S08-N06-K, S08-N08-K, S07-N07-K, S09-N07-K≥ 80% key actors agreed; roles and solutions fixed; critical conflicts closed; resource gap ≤ 10%
S08-N07-RDevelopment of the "Solution" node in the contour of a stable field: change the state and increase the potential.speed of decision; quality of decision; share of executed decisions; increase to the base lineEDMS; protocols; tasks; approval logsR = 0,40·G + 0,30·S + 0,30·VS08-N07-D, S08-N07-K, S08-N06-R, S08-N08-R, S07-N07-R, S09-N07-Rtarget effect confirmed by data; improvement against base line ≥ 10% or reach an approved threshold; the effect is stable ≥ 2 Measurement Cycles
S08-N08-DDiagnostics of the Action node in the contour of a stable field: measure the current state and deviations.intensity of actions; compliance with deadlines; effectiveness of actions; baselinework plans; trackers; production systems; execution actsD = 0,40·C + 0,35·Q + 0,25·TS08-N08-K, S08-N08-R, S08-N07-D, S08-N09-D, S07-N08-D, S09-N08-DData coverage ≥ 90%; relevance in the given SLA; We trace the source; recalculation gives a deviation ≤ 5%
S08-N08-KCoordination of the Action node in the contour of a sustainable field: coordinate participants, constraints and actions.intensity of actions; compliance with deadlines; effectiveness of actions; consistency indexwork plans; trackers; production systems; execution actsK = 0,40·A + 0,30·L + 0,30·RS08-N08-D, S08-N08-R, S08-N07-K, S08-N09-K, S07-N08-K, S09-N08-K≥ 80% key actors agreed; roles and solutions fixed; critical conflicts closed; resource gap ≤ 10%
S08-N08-RDevelopment of the Action node in the contour of a sustainable field: change the state and increase the potential.intensity of actions; compliance with deadlines; effectiveness of actions; increase to the baselinework plans; trackers; production systems; execution actsR = 0,40·G + 0,30·S + 0,30·VS08-N08-D, S08-N08-K, S08-N07-R, S08-N09-R, S07-N08-R, S09-N08-Rtarget effect confirmed by data; improvement against base line ≥ 10% or reach an approved threshold; the effect is stable ≥ 2 Measurement Cycles
S08-N09-DDiagnostics of the "Feedback" node in the contour of a stable field: measure the current state and deviations.frequency of feedback; correction rate; the proportion of closed deviations; baselineuser feedback; audits; telemetry; control measurementsD = 0,40·C + 0,35·Q + 0,25·TS08-N09-K, S08-N09-R, S08-N08-D, S08-N10-D, S07-N09-D, S09-N09-DData coverage ≥ 90%; relevance in the given SLA; We trace the source; recalculation gives a deviation ≤ 5%
S08-N09-KCoordination of the feedback node in the contour of a stable field: coordinate participants, restrictions and actions.frequency of feedback; correction rate; proportion of closed deviations; consistency indexuser feedback; audits; telemetry; control measurementsK = 0,40·A + 0,30·L + 0,30·RS08-N09-D, S08-N09-R, S08-N08-K, S08-N10-K, S07-N09-K, S09-N09-K≥ 80% key actors agreed; roles and solutions fixed; critical conflicts closed; resource gap ≤ 10%
S08-N09-RDevelopment of the feedback node in the contour of a stable field: change the state and increase the potential.frequency of feedback; correction rate; the proportion of closed deviations; increase to the base lineuser feedback; audits; telemetry; control measurementsR = 0,40·G + 0,30·S + 0,30·VS08-N09-D, S08-N09-K, S08-N08-R, S08-N10-R, S07-N09-R, S09-N09-Rtarget effect confirmed by data; improvement against base line ≥ 10% or reach an approved threshold; the effect is stable ≥ 2 Measurement Cycles
S08-N10-DDiagnosis of the Risk node in the contour of a stable field: measure the current state and deviations.probability of risk; extent of damage; residual risk; baselinerisk registers; incidents; insurance events; scenario modelsD = 0,40·C + 0,35·Q + 0,25·TS08-N10-K, S08-N10-R, S08-N09-D, S08-N11-D, S07-N10-D, S09-N10-DData coverage ≥ 90%; relevance in the given SLA; We trace the source; recalculation gives a deviation ≤ 5%
S08-N10-KCoordination of the Risk node in the contour of a stable field: coordinate participants, restrictions and actions.probability of risk; extent of damage; residual risk; consistency indexrisk registers; incidents; insurance events; scenario modelsK = 0,40·A + 0,30·L + 0,30·RS08-N10-D, S08-N10-R, S08-N09-K, S08-N11-K, S07-N10-K, S09-N10-K≥ 80% key actors agreed; roles and solutions fixed; critical conflicts closed; resource gap ≤ 10%
S08-N10-RDevelopment of the Risk node in the contour of a stable field: change the state and increase the potential.probability of risk; extent of damage; residual risk; increment to baselinerisk registers; incidents; insurance events; scenario modelsR = 0,40·G + 0,30·S + 0,30·VS08-N10-D, S08-N10-K, S08-N09-R, S08-N11-R, S07-N10-R, S09-N10-Rtarget effect confirmed by data; improvement against base line ≥ 10% or reach an approved threshold; the effect is stable ≥ 2 Measurement Cycles
S08-N11-DDiagnostics of the "Trust" node in the contour of a stable field: measure the current state and deviations.trust index; share of confirmed commitments; stability of interactions; baselinehistory of obligations; ratings; contracts; trust surveysD = 0,40·C + 0,35·Q + 0,25·TS08-N11-K, S08-N11-R, S08-N10-D, S08-N12-D, S07-N11-D, S09-N11-DData coverage ≥ 90%; relevance in the given SLA; We trace the source; recalculation gives a deviation ≤ 5%
S08-N11-KCoordination of the “Trust” node in the contour of a sustainable field: coordinate participants, restrictions and actions.trust index; share of confirmed commitments; stability of interactions; consistency indexhistory of obligations; ratings; contracts; trust surveysK = 0,40·A + 0,30·L + 0,30·RS08-N11-D, S08-N11-R, S08-N10-K, S08-N12-K, S07-N11-K, S09-N11-K≥ 80% key actors agreed; roles and solutions fixed; critical conflicts closed; resource gap ≤ 10%
S08-N11-RThe development of the “Trust” node in the contour of a sustainable field: change the state and increase the potential.trust index; share of confirmed commitments; stability of interactions; increase to baselinehistory of obligations; ratings; contracts; trust surveysR = 0,40·G + 0,30·S + 0,30·VS08-N11-D, S08-N11-K, S08-N10-R, S08-N12-R, S07-N11-R, S09-N11-Rtarget effect confirmed by data; improvement against base line ≥ 10% or reach an approved threshold; the effect is stable ≥ 2 Measurement Cycles
S08-N12-DDiagnostics of the "Cooperation" node in the contour of a stable field: measure the current state and deviations.number of active links; density of cooperation; share of joint projects; baselinegraph links; agreements; consortia; joint projectsD = 0,40·C + 0,35·Q + 0,25·TS08-N12-K, S08-N12-R, S08-N11-D, S08-N13-D, S07-N12-D, S09-N12-DData coverage ≥ 90%; relevance in the given SLA; We trace the source; recalculation gives a deviation ≤ 5%
S08-N12-KCoordination of the "Cooperation" node in the contour of a sustainable field: coordinate participants, restrictions and actions.number of active links; density of cooperation; proportion of joint projects; consistency indexgraph links; agreements; consortia; joint projectsK = 0,40·A + 0,30·L + 0,30·RS08-N12-D, S08-N12-R, S08-N11-K, S08-N13-K, S07-N12-K, S09-N12-K≥ 80% key actors agreed; roles and solutions fixed; critical conflicts closed; resource gap ≤ 10%
S08-N12-RDevelopment of the "Cooperation" node in the contour of a stable field: change the state and increase the potential.number of active links; density of cooperation; share of joint projects; increase to the baselinegraph links; agreements; consortia; joint projectsR = 0,40·G + 0,30·S + 0,30·VS08-N12-D, S08-N12-K, S08-N11-R, S08-N13-R, S07-N12-R, S09-N12-Rtarget effect confirmed by data; improvement against base line ≥ 10% or reach an approved threshold; the effect is stable ≥ 2 Measurement Cycles
S08-N13-DDiagnostics of the Infrastructure node in the contour of a stable field: measure the current state and deviations.infrastructure availability; reliability; capacity utilization; base lineGIS; object passports; dispatching; operational logsD = 0,40·C + 0,35·Q + 0,25·TS08-N13-K, S08-N13-R, S08-N12-D, S08-N14-D, S07-N13-D, S09-N13-DData coverage ≥ 90%; relevance in the given SLA; We trace the source; recalculation gives a deviation ≤ 5%
S08-N13-KCoordination of the "Infrastructure" node in the contour of a sustainable field: coordinate participants, restrictions and actions.infrastructure availability; reliability; capacity utilization; consistency indexGIS; object passports; dispatching; operational logsK = 0,40·A + 0,30·L + 0,30·RS08-N13-D, S08-N13-R, S08-N12-K, S08-N14-K, S07-N13-K, S09-N13-K≥ 80% key actors agreed; roles and solutions fixed; critical conflicts closed; resource gap ≤ 10%
S08-N13-RDevelopment of the Infrastructure node in the contour of a sustainable field: change the state and increase the potential.infrastructure availability; reliability; capacity utilization; increase to base lineGIS; object passports; dispatching; operational logsR = 0,40·G + 0,30·S + 0,30·VS08-N13-D, S08-N13-K, S08-N12-R, S08-N14-R, S07-N13-R, S09-N13-Rtarget effect confirmed by data; improvement against base line ≥ 10% or reach an approved threshold; the effect is stable ≥ 2 Measurement Cycles
S08-N14-DDiagnostics of the "Standard" node in the contour of a stable field: measure the current state and deviations.standards coverage; compliance; number of deviations; baselinenormative documents; standards; checklists; audit resultsD = 0,40·C + 0,35·Q + 0,25·TS08-N14-K, S08-N14-R, S08-N13-D, S08-N15-D, S07-N14-D, S09-N14-DData coverage ≥ 90%; relevance in the given SLA; We trace the source; recalculation gives a deviation ≤ 5%
S08-N14-KCoordination of the "Standard" node in the contour of a sustainable field: to coordinate participants, restrictions and actions.standards coverage; compliance; number of deviations; consistency indexnormative documents; standards; checklists; audit resultsK = 0,40·A + 0,30·L + 0,30·RS08-N14-D, S08-N14-R, S08-N13-K, S08-N15-K, S07-N14-K, S09-N14-K≥ 80% key actors agreed; roles and solutions fixed; critical conflicts closed; resource gap ≤ 10%
S08-N14-RDevelopment of the Standard node in the contour of a sustainable field: change the state and increase the potential.coverage standards; compliance; number of deviations; increase to baselinenormative documents; standards; checklists; audit resultsR = 0,40·G + 0,30·S + 0,30·VS08-N14-D, S08-N14-K, S08-N13-R, S08-N15-R, S07-N14-R, S09-N14-Rtarget effect confirmed by data; improvement against base line ≥ 10% or reach an approved threshold; the effect is stable ≥ 2 Measurement Cycles
S08-N15-DDiagnostics of the Finance node in the contour of a stable field: measure the current state and deviations.liquidity; resource cost; financial stability; baselineaccounting; budgets; treasury; banking and investment dataD = 0,40·C + 0,35·Q + 0,25·TS08-N15-K, S08-N15-R, S08-N14-D, S08-N16-D, S07-N15-D, S09-N15-DData coverage ≥ 90%; relevance in the given SLA; We trace the source; recalculation gives a deviation ≤ 5%
S08-N15-KCoordination of the "Finance" node in the contour of a sustainable field: coordinate participants, restrictions and actions.liquidity; resource cost; financial stability; consistency indexaccounting; budgets; treasury; banking and investment dataK = 0,40·A + 0,30·L + 0,30·RS08-N15-D, S08-N15-R, S08-N14-K, S08-N16-K, S07-N15-K, S09-N15-K≥ 80% key actors agreed; roles and solutions fixed; critical conflicts closed; resource gap ≤ 10%
S08-N15-RDevelopment of the Finance node in the contour of a sustainable field: change the state and increase the potential.liquidity; cost of resource; financial stability; growth to the baselineaccounting; budgets; treasury; banking and investment dataR = 0,40·G + 0,30·S + 0,30·VS08-N15-D, S08-N15-K, S08-N14-R, S08-N16-R, S07-N15-R, S09-N15-Rtarget effect confirmed by data; improvement against base line ≥ 10% or reach an approved threshold; the effect is stable ≥ 2 Measurement Cycles
S08-N16-DDiagnostics of the "Personnel" node in the contour of a stable field: measure the current state and deviations.staffing; level of competence; fluidity/continuity; baselineHRIS; competence registers; training; certificationsD = 0,40·C + 0,35·Q + 0,25·TS08-N16-K, S08-N16-R, S08-N15-D, S08-N17-D, S07-N16-D, S09-N16-DData coverage ≥ 90%; relevance in the given SLA; We trace the source; recalculation gives a deviation ≤ 5%
S08-N16-KCoordination of the "Personnel" node in the contour of a stable field: coordinate participants, restrictions and actions.staff security; level of competence; fluidity/continuity; consistency indexHRIS; competence registers; training; certificationsK = 0,40·A + 0,30·L + 0,30·RS08-N16-D, S08-N16-R, S08-N15-K, S08-N17-K, S07-N16-K, S09-N16-K≥ 80% key actors agreed; roles and solutions fixed; critical conflicts closed; resource gap ≤ 10%
S08-N16-RThe development of the "Personnel" node in the contour of a stable field: change the state and increase the potential.staffing; level of competence; fluidity/continuity; increment to baselineHRIS; competence registers; training; certificationsR = 0,40·G + 0,30·S + 0,30·VS08-N16-D, S08-N16-K, S08-N15-R, S08-N17-R, S07-N16-R, S09-N16-Rtarget effect confirmed by data; improvement against base line ≥ 10% or reach an approved threshold; the effect is stable ≥ 2 Measurement Cycles
S08-N17-DDiagnostics of the node "Technology" in the contour of a stable field: measure the current state and deviations.technology readiness; technology efficiency; scalability; base lineTRL/MRL; patents; tests; digital models; technical cardsD = 0,40·C + 0,35·Q + 0,25·TS08-N17-K, S08-N17-R, S08-N16-D, S08-N18-D, S07-N17-D, S09-N17-DData coverage ≥ 90%; relevance in the given SLA; We trace the source; recalculation gives a deviation ≤ 5%
S08-N17-KCoordination of the node "Technology" in the contour of a sustainable field: to coordinate participants, restrictions and actions.technology readiness; technology efficiency; scalability; consistency indexTRL/MRL; patents; tests; digital models; technical cardsK = 0,40·A + 0,30·L + 0,30·RS08-N17-D, S08-N17-R, S08-N16-K, S08-N18-K, S07-N17-K, S09-N17-K≥ 80% key actors agreed; roles and solutions fixed; critical conflicts closed; resource gap ≤ 10%
S08-N17-RDevelopment of the "Technology" node in the contour of a sustainable field: change the state and increase the potential.technology readiness; technology efficiency; scalability; growth to the baselineTRL/MRL; patents; tests; digital models; technical cardsR = 0,40·G + 0,30·S + 0,30·VS08-N17-D, S08-N17-K, S08-N16-R, S08-N18-R, S07-N17-R, S09-N17-Rtarget effect confirmed by data; improvement against base line ≥ 10% or reach an approved threshold; the effect is stable ≥ 2 Measurement Cycles
S08-N18-DDiagnosis of the node "Environment" in the contour of a stable field: measure the current state and deviations.environmental quality; load on the environment; recovery potential; baselineenvironmental monitoring; GIS; meteo; biocenose observationsD = 0,40·C + 0,35·Q + 0,25·TS08-N18-K, S08-N18-R, S08-N17-D, S08-N19-D, S07-N18-D, S09-N18-DData coverage ≥ 90%; relevance in the given SLA; We trace the source; recalculation gives a deviation ≤ 5%
S08-N18-KCoordination of the node "Environment" in the contour of a stable field: to coordinate participants, restrictions and actions.quality of the environment; load on the environment; recovery potential; consistency indexenvironmental monitoring; GIS; meteo; biocenose observationsK = 0,40·A + 0,30·L + 0,30·RS08-N18-D, S08-N18-R, S08-N17-K, S08-N19-K, S07-N18-K, S09-N18-K≥ 80% key actors agreed; roles and solutions fixed; critical conflicts closed; resource gap ≤ 10%
S08-N18-RDevelopment of the node "Environment" in the contour of a stable field: change the state and increase the potential.quality of the environment; load on the environment; recovery potential; increase to the baselineenvironmental monitoring; GIS; meteo; biocenose observationsR = 0,40·G + 0,30·S + 0,30·VS08-N18-D, S08-N18-K, S08-N17-R, S08-N19-R, S07-N18-R, S09-N18-Rtarget effect confirmed by data; improvement against base line ≥ 10% or reach an approved threshold; the effect is stable ≥ 2 Measurement Cycles
S08-N19-DDiagnostics of the node "Result" in the contour of a stable field: measure the current state and deviations.result achievement; effect/costs; result stability; baselineKPI; effects statistics; acceptance acts; impact assessmentD = 0,40·C + 0,35·Q + 0,25·TS08-N19-K, S08-N19-R, S08-N18-D, S07-N19-D, S09-N19-DData coverage ≥ 90%; relevance in the given SLA; We trace the source; recalculation gives a deviation ≤ 5%
S08-N19-KCoordination of the node "Result" in the contour of a stable field: to coordinate participants, restrictions and actions.achievement of result; effect/costs; sustainability of result; consistency indexKPI; effects statistics; acceptance acts; impact assessmentK = 0,40·A + 0,30·L + 0,30·RS08-N19-D, S08-N19-R, S08-N18-K, S07-N19-K, S09-N19-K≥ 80% key actors agreed; roles and solutions fixed; critical conflicts closed; resource gap ≤ 10%
S08-N19-RDevelopment of the node "Result" in the contour of a stable field: change the state and increase the potential.result achievement; effect/costs; result stability; increase to baselineKPI; effects statistics; acceptance acts; impact assessmentR = 0,40·G + 0,30·S + 0,30·VS08-N19-D, S08-N19-K, S08-N18-R, S07-N19-R, S09-N19-Rtarget effect confirmed by data; improvement against base line ≥ 10% or reach an approved threshold; the effect is stable ≥ 2 Measurement Cycles

S09 · Evolution and innovation

Family function: updating, experimentation, R&D, and scaling. Modules: 57 (19 Node × 3 Status).

CodeFunctionIndicatorsDataFormulaConnectionsValidation criteria
S09-N01-DDiagnosis of the subject node in the contour of the evolutionary field: measure the current state and deviations.identification of subjects; completeness of roles; level of responsibility; baselineregisters of subjects; organizational structures; contracts; role profilesD = 0,40·C + 0,35·Q + 0,25·TS09-N01-K, S09-N01-R, S09-N02-D, S08-N01-D, S10-N01-DData coverage ≥ 90%; relevance in the given SLA; We trace the source; recalculation gives a deviation ≤ 5%
S09-N01-KCoordination of the subject node in the contour of the evolutionary field: coordinate participants, constraints and actions.identification of subjects; completeness of roles; level of responsibility; consistency indexregisters of subjects; organizational structures; contracts; role profilesK = 0,40·A + 0,30·L + 0,30·RS09-N01-D, S09-N01-R, S09-N02-K, S08-N01-K, S10-N01-K≥ 80% key actors agreed; roles and solutions fixed; critical conflicts closed; resource gap ≤ 10%
S09-N01-RDevelopment of the subject node in the contour of the evolutionary field: change the state and increase the potential.Identification of subjects; completeness of roles; level of responsibility; increase to the baselineregisters of subjects; organizational structures; contracts; role profilesR = 0,40·G + 0,30·S + 0,30·VS09-N01-D, S09-N01-K, S09-N02-R, S08-N01-R, S10-N01-Rtarget effect confirmed by data; improvement against base line ≥ 10% or reach an approved threshold; the effect is stable ≥ 2 Measurement Cycles
S09-N02-DDiagnostics of the "Purpose" node in the contour of the evolutionary field: measure the current state and deviations.Measurability of objectives; consistency of objectives; proportion of objectives achieved; baselinestrategies; KPI; programs; decision protocolsD = 0,40·C + 0,35·Q + 0,25·TS09-N02-K, S09-N02-R, S09-N01-D, S09-N03-D, S08-N02-D, S10-N02-DData coverage ≥ 90%; relevance in the given SLA; We trace the source; recalculation gives a deviation ≤ 5%
S09-N02-KCoordination of the "Purpose" node in the contour of the evolutionary field: coordinate participants, constraints and actions.Measurability of objectives; Coherence of objectives; Percentage of objectives achieved; Coherence indexstrategies; KPI; programs; decision protocolsK = 0,40·A + 0,30·L + 0,30·RS09-N02-D, S09-N02-R, S09-N01-K, S09-N03-K, S08-N02-K, S10-N02-K≥ 80% key actors agreed; roles and solutions fixed; critical conflicts closed; resource gap ≤ 10%
S09-N02-RThe development of the "Purpose" node in the contour of the evolutionary field: change the state and increase the potential.measurability of the goal; consistency of goals; proportion of goals achieved; increase to the baselinestrategies; KPI; programs; decision protocolsR = 0,40·G + 0,30·S + 0,30·VS09-N02-D, S09-N02-K, S09-N01-R, S09-N03-R, S08-N02-R, S10-N02-Rtarget effect confirmed by data; improvement against base line ≥ 10% or reach an approved threshold; the effect is stable ≥ 2 Measurement Cycles
S09-N03-DDiagnostics of the Border node in the contour of the evolutionary field: to measure the current state and deviations.clarity of boundaries; number of boundary conflicts; contour stability; baselinecontour maps; regulations; access rights; territorial dataD = 0,40·C + 0,35·Q + 0,25·TS09-N03-K, S09-N03-R, S09-N02-D, S09-N04-D, S08-N03-D, S10-N03-DData coverage ≥ 90%; relevance in the given SLA; We trace the source; recalculation gives a deviation ≤ 5%
S09-N03-KCoordination of the "Border" node in the contour of the evolutionary field: coordinate participants, constraints and actions.clarity of boundaries; number of boundary conflicts; stability of contour; consistency indexcontour maps; regulations; access rights; territorial dataK = 0,40·A + 0,30·L + 0,30·RS09-N03-D, S09-N03-R, S09-N02-K, S09-N04-K, S08-N03-K, S10-N03-K≥ 80% key actors agreed; roles and solutions fixed; critical conflicts closed; resource gap ≤ 10%
S09-N03-RDevelopment of the Border node in the contour of the evolutionary field: change the state and increase the potential.clarity of borders; number of border conflicts; stability of the contour; increment to the baselinecontour maps; regulations; access rights; territorial dataR = 0,40·G + 0,30·S + 0,30·VS09-N03-D, S09-N03-K, S09-N02-R, S09-N04-R, S08-N03-R, S10-N03-Rtarget effect confirmed by data; improvement against base line ≥ 10% or reach an approved threshold; the effect is stable ≥ 2 Measurement Cycles
S09-N04-DDiagnostics of the Resource node in the contour of the evolutionary field: measure the current state and deviations.resource availability; deficit/surplus; efficiency of use; baselinebalance of resources; warehouse/ERP; energy balance; capacityD = 0,40·C + 0,35·Q + 0,25·TS09-N04-K, S09-N04-R, S09-N03-D, S09-N05-D, S08-N04-D, S10-N04-DData coverage ≥ 90%; relevance in the given SLA; We trace the source; recalculation gives a deviation ≤ 5%
S09-N04-KCoordination of the Resource node in the contour of the evolutionary field: coordinate participants, constraints and actions.resource availability; deficit/surplus; efficiency of use; consistency indexbalance of resources; warehouse/ERP; energy balance; capacityK = 0,40·A + 0,30·L + 0,30·RS09-N04-D, S09-N04-R, S09-N03-K, S09-N05-K, S08-N04-K, S10-N04-K≥ 80% key actors agreed; roles and solutions fixed; critical conflicts closed; resource gap ≤ 10%
S09-N04-RDevelopment of the Resource node in the contour of the evolutionary field: change the state and increase the potential.resource availability; deficit/surplus; efficiency of use; increase to the baselinebalance of resources; warehouse/ERP; energy balance; capacityR = 0,40·G + 0,30·S + 0,30·VS09-N04-D, S09-N04-K, S09-N03-R, S09-N05-R, S08-N04-R, S10-N04-Rtarget effect confirmed by data; improvement against base line ≥ 10% or reach an approved threshold; the effect is stable ≥ 2 Measurement Cycles
S09-N05-DDiagnostics of the signal node in the contour of the evolutionary field: measure the current state and deviations.reliability of signals; signal delay; fraction of false alarms; baselinesensors; event logs; appeals; media/network monitoringD = 0,40·C + 0,35·Q + 0,25·TS09-N05-K, S09-N05-R, S09-N04-D, S09-N06-D, S08-N05-D, S10-N05-DData coverage ≥ 90%; relevance in the given SLA; We trace the source; recalculation gives a deviation ≤ 5%
S09-N05-KCoordination of the Signal node in the contour of the evolutionary field: coordinate participants, constraints and actions.reliability of signals; signal delay; proportion of false alarms; consistency indexsensors; event logs; appeals; media/network monitoringK = 0,40·A + 0,30·L + 0,30·RS09-N05-D, S09-N05-R, S09-N04-K, S09-N06-K, S08-N05-K, S10-N05-K≥ 80% key actors agreed; roles and solutions fixed; critical conflicts closed; resource gap ≤ 10%
S09-N05-RDevelopment of the Signal node in the contour of the evolutionary field: change the state and increase the potential.reliability of signals; signal delay; fraction of false alarms; increment to base linesensors; event logs; appeals; media/network monitoringR = 0,40·G + 0,30·S + 0,30·VS09-N05-D, S09-N05-K, S09-N04-R, S09-N06-R, S08-N05-R, S10-N05-Rtarget effect confirmed by data; improvement against base line ≥ 10% or reach an approved threshold; the effect is stable ≥ 2 Measurement Cycles
S09-N06-DDiagnosis of the Knowledge node in the contour of the evolutionary field: measure the current state and deviations.completeness of knowledge; relevance of knowledge; level of evidence; baselineResearch; knowledge bases; publications; expertise; archivesD = 0,40·C + 0,35·Q + 0,25·TS09-N06-K, S09-N06-R, S09-N05-D, S09-N07-D, S08-N06-D, S10-N06-DData coverage ≥ 90%; relevance in the given SLA; We trace the source; recalculation gives a deviation ≤ 5%
S09-N06-KCoordination of the Knowledge node in the contour of the evolutionary field: coordinate participants, constraints and actions.completeness of knowledge; relevance of knowledge; level of evidence; consistency indexResearch; knowledge bases; publications; expertise; archivesK = 0,40·A + 0,30·L + 0,30·RS09-N06-D, S09-N06-R, S09-N05-K, S09-N07-K, S08-N06-K, S10-N06-K≥ 80% key actors agreed; roles and solutions fixed; critical conflicts closed; resource gap ≤ 10%
S09-N06-RDevelopment of the Knowledge node in the contour of the evolutionary field: change the state and increase the potential.completeness of knowledge; relevance of knowledge; level of evidence; increase to the baselineResearch; knowledge bases; publications; expertise; archivesR = 0,40·G + 0,30·S + 0,30·VS09-N06-D, S09-N06-K, S09-N05-R, S09-N07-R, S08-N06-R, S10-N06-Rtarget effect confirmed by data; improvement against base line ≥ 10% or reach an approved threshold; the effect is stable ≥ 2 Measurement Cycles
S09-N07-DDiagnostics of the "Solution" node in the contour of the evolutionary field: measure the current state and deviations.speed of decision; quality of decision; proportion of decisions executed; baselineEDMS; protocols; tasks; approval logsD = 0,40·C + 0,35·Q + 0,25·TS09-N07-K, S09-N07-R, S09-N06-D, S09-N08-D, S08-N07-D, S10-N07-DData coverage ≥ 90%; relevance in the given SLA; We trace the source; recalculation gives a deviation ≤ 5%
S09-N07-KCoordination of the “Solution” node in the contour of the evolutionary field: coordinate participants, constraints and actions.speed of decision; quality of decision; proportion of decisions executed; consistency indexEDMS; protocols; tasks; approval logsK = 0,40·A + 0,30·L + 0,30·RS09-N07-D, S09-N07-R, S09-N06-K, S09-N08-K, S08-N07-K, S10-N07-K≥ 80% key actors agreed; roles and solutions fixed; critical conflicts closed; resource gap ≤ 10%
S09-N07-RDevelopment of the “Solution” node in the contour of the evolutionary field: change the state and increase the potential.speed of decision; quality of decision; share of executed decisions; increase to the base lineEDMS; protocols; tasks; approval logsR = 0,40·G + 0,30·S + 0,30·VS09-N07-D, S09-N07-K, S09-N06-R, S09-N08-R, S08-N07-R, S10-N07-Rtarget effect confirmed by data; improvement against base line ≥ 10% or reach an approved threshold; the effect is stable ≥ 2 Measurement Cycles
S09-N08-DDiagnostics of the "Action" node in the contour of the evolutionary field: to measure the current state and deviations.intensity of actions; compliance with deadlines; effectiveness of actions; baselinework plans; trackers; production systems; execution actsD = 0,40·C + 0,35·Q + 0,25·TS09-N08-K, S09-N08-R, S09-N07-D, S09-N09-D, S08-N08-D, S10-N08-DData coverage ≥ 90%; relevance in the given SLA; We trace the source; recalculation gives a deviation ≤ 5%
S09-N08-KCoordination of the "Action" node in the contour of the evolutionary field: coordinate participants, constraints, and actions.intensity of actions; compliance with deadlines; effectiveness of actions; consistency indexwork plans; trackers; production systems; execution actsK = 0,40·A + 0,30·L + 0,30·RS09-N08-D, S09-N08-R, S09-N07-K, S09-N09-K, S08-N08-K, S10-N08-K≥ 80% key actors agreed; roles and solutions fixed; critical conflicts closed; resource gap ≤ 10%
S09-N08-RDevelopment of the Action node in the contour of the evolutionary field: change the state and increase the potential.intensity of actions; compliance with deadlines; effectiveness of actions; increase to the baselinework plans; trackers; production systems; execution actsR = 0,40·G + 0,30·S + 0,30·VS09-N08-D, S09-N08-K, S09-N07-R, S09-N09-R, S08-N08-R, S10-N08-Rtarget effect confirmed by data; improvement against base line ≥ 10% or reach an approved threshold; the effect is stable ≥ 2 Measurement Cycles
S09-N09-DDiagnosis of the "Feedback" node in the contour of the evolutionary field: measure the current state and deviations.frequency of feedback; correction rate; the proportion of closed deviations; baselineuser feedback; audits; telemetry; control measurementsD = 0,40·C + 0,35·Q + 0,25·TS09-N09-K, S09-N09-R, S09-N08-D, S09-N10-D, S08-N09-D, S10-N09-DData coverage ≥ 90%; relevance in the given SLA; We trace the source; recalculation gives a deviation ≤ 5%
S09-N09-KCoordination of the "Feedback" node in the contour of the evolutionary field: coordinate participants, constraints and actions.frequency of feedback; correction rate; proportion of closed deviations; consistency indexuser feedback; audits; telemetry; control measurementsK = 0,40·A + 0,30·L + 0,30·RS09-N09-D, S09-N09-R, S09-N08-K, S09-N10-K, S08-N09-K, S10-N09-K≥ 80% key actors agreed; roles and solutions fixed; critical conflicts closed; resource gap ≤ 10%
S09-N09-RDevelopment of the feedback node in the contour of the evolutionary field: change the state and increase the potential.frequency of feedback; correction rate; the proportion of closed deviations; increase to the base lineuser feedback; audits; telemetry; control measurementsR = 0,40·G + 0,30·S + 0,30·VS09-N09-D, S09-N09-K, S09-N08-R, S09-N10-R, S08-N09-R, S10-N09-Rtarget effect confirmed by data; improvement against base line ≥ 10% or reach an approved threshold; the effect is stable ≥ 2 Measurement Cycles
S09-N10-DDiagnosis of the risk node in the contour of the evolutionary field: measure the current state and deviations.probability of risk; extent of damage; residual risk; baselinerisk registers; incidents; insurance events; scenario modelsD = 0,40·C + 0,35·Q + 0,25·TS09-N10-K, S09-N10-R, S09-N09-D, S09-N11-D, S08-N10-D, S10-N10-DData coverage ≥ 90%; relevance in the given SLA; We trace the source; recalculation gives a deviation ≤ 5%
S09-N10-KCoordination of the node "Risk" in the contour of the evolutionary field: to coordinate participants, restrictions and actions.probability of risk; extent of damage; residual risk; consistency indexrisk registers; incidents; insurance events; scenario modelsK = 0,40·A + 0,30·L + 0,30·RS09-N10-D, S09-N10-R, S09-N09-K, S09-N11-K, S08-N10-K, S10-N10-K≥ 80% key actors agreed; roles and solutions fixed; critical conflicts closed; resource gap ≤ 10%
S09-N10-RDevelopment of the Risk node in the contour of the evolutionary field: change the state and increase the potential.probability of risk; extent of damage; residual risk; increment to baselinerisk registers; incidents; insurance events; scenario modelsR = 0,40·G + 0,30·S + 0,30·VS09-N10-D, S09-N10-K, S09-N09-R, S09-N11-R, S08-N10-R, S10-N10-Rtarget effect confirmed by data; improvement against base line ≥ 10% or reach an approved threshold; the effect is stable ≥ 2 Measurement Cycles
S09-N11-DDiagnostics of the "Trust" node in the contour of the evolutionary field: to measure the current state and deviations.trust index; share of confirmed commitments; stability of interactions; baselinehistory of obligations; ratings; contracts; trust surveysD = 0,40·C + 0,35·Q + 0,25·TS09-N11-K, S09-N11-R, S09-N10-D, S09-N12-D, S08-N11-D, S10-N11-DData coverage ≥ 90%; relevance in the given SLA; We trace the source; recalculation gives a deviation ≤ 5%
S09-N11-KCoordination of the node "Trust" in the contour of the evolutionary field: to coordinate participants, restrictions and actions.trust index; share of confirmed commitments; stability of interactions; consistency indexhistory of obligations; ratings; contracts; trust surveysK = 0,40·A + 0,30·L + 0,30·RS09-N11-D, S09-N11-R, S09-N10-K, S09-N12-K, S08-N11-K, S10-N11-K≥ 80% key actors agreed; roles and solutions fixed; critical conflicts closed; resource gap ≤ 10%
S09-N11-RThe development of the "Trust" node in the contour of the evolutionary field: change the state and increase the potential.trust index; share of confirmed commitments; stability of interactions; increase to baselinehistory of obligations; ratings; contracts; trust surveysR = 0,40·G + 0,30·S + 0,30·VS09-N11-D, S09-N11-K, S09-N10-R, S09-N12-R, S08-N11-R, S10-N11-Rtarget effect confirmed by data; improvement against base line ≥ 10% or reach an approved threshold; the effect is stable ≥ 2 Measurement Cycles
S09-N12-DDiagnostics of the "Cooperation" node in the contour of the evolutionary field: to measure the current state and deviations.number of active links; density of cooperation; share of joint projects; baselinegraph links; agreements; consortia; joint projectsD = 0,40·C + 0,35·Q + 0,25·TS09-N12-K, S09-N12-R, S09-N11-D, S09-N13-D, S08-N12-D, S10-N12-DData coverage ≥ 90%; relevance in the given SLA; We trace the source; recalculation gives a deviation ≤ 5%
S09-N12-KCoordination of the "Cooperation" node in the contour of the evolutionary field: coordinate participants, constraints and actions.number of active links; density of cooperation; proportion of joint projects; consistency indexgraph links; agreements; consortia; joint projectsK = 0,40·A + 0,30·L + 0,30·RS09-N12-D, S09-N12-R, S09-N11-K, S09-N13-K, S08-N12-K, S10-N12-K≥ 80% key actors agreed; roles and solutions fixed; critical conflicts closed; resource gap ≤ 10%
S09-N12-RDevelopment of the "Cooperation" node in the contour of the evolutionary field: change the state and increase the potential.number of active links; density of cooperation; share of joint projects; increase to the baselinegraph links; agreements; consortia; joint projectsR = 0,40·G + 0,30·S + 0,30·VS09-N12-D, S09-N12-K, S09-N11-R, S09-N13-R, S08-N12-R, S10-N12-Rtarget effect confirmed by data; improvement against base line ≥ 10% or reach an approved threshold; the effect is stable ≥ 2 Measurement Cycles
S09-N13-DDiagnostics of the "Infrastructure" node in the contour of the evolutionary field: measure the current state and deviations.infrastructure availability; reliability; capacity utilization; base lineGIS; object passports; dispatching; operational logsD = 0,40·C + 0,35·Q + 0,25·TS09-N13-K, S09-N13-R, S09-N12-D, S09-N14-D, S08-N13-D, S10-N13-DData coverage ≥ 90%; relevance in the given SLA; We trace the source; recalculation gives a deviation ≤ 5%
S09-N13-KCoordination of the node "Infrastructure" in the contour of the evolutionary field: to coordinate participants, constraints and actions.infrastructure availability; reliability; capacity utilization; consistency indexGIS; object passports; dispatching; operational logsK = 0,40·A + 0,30·L + 0,30·RS09-N13-D, S09-N13-R, S09-N12-K, S09-N14-K, S08-N13-K, S10-N13-K≥ 80% key actors agreed; roles and solutions fixed; critical conflicts closed; resource gap ≤ 10%
S09-N13-RDevelopment of the node "Infrastructure" in the contour of the evolutionary field: change the state and increase the potential.infrastructure availability; reliability; capacity utilization; increase to base lineGIS; object passports; dispatching; operational logsR = 0,40·G + 0,30·S + 0,30·VS09-N13-D, S09-N13-K, S09-N12-R, S09-N14-R, S08-N13-R, S10-N13-Rtarget effect confirmed by data; improvement against base line ≥ 10% or reach an approved threshold; the effect is stable ≥ 2 Measurement Cycles
S09-N14-DDiagnostics of the "Standard" node in the contour of the evolutionary field: to measure the current state and deviations.standards coverage; compliance; number of deviations; baselinenormative documents; standards; checklists; audit resultsD = 0,40·C + 0,35·Q + 0,25·TS09-N14-K, S09-N14-R, S09-N13-D, S09-N15-D, S08-N14-D, S10-N14-DData coverage ≥ 90%; relevance in the given SLA; We trace the source; recalculation gives a deviation ≤ 5%
S09-N14-KCoordination of the "Standard" node in the contour of the evolutionary field: coordinate participants, constraints and actions.standards coverage; compliance; number of deviations; consistency indexnormative documents; standards; checklists; audit resultsK = 0,40·A + 0,30·L + 0,30·RS09-N14-D, S09-N14-R, S09-N13-K, S09-N15-K, S08-N14-K, S10-N14-K≥ 80% key actors agreed; roles and solutions fixed; critical conflicts closed; resource gap ≤ 10%
S09-N14-RDevelopment of the Standard node in the contour of the evolutionary field: change the state and increase the potential.coverage standards; compliance; number of deviations; increase to baselinenormative documents; standards; checklists; audit resultsR = 0,40·G + 0,30·S + 0,30·VS09-N14-D, S09-N14-K, S09-N13-R, S09-N15-R, S08-N14-R, S10-N14-Rtarget effect confirmed by data; improvement against base line ≥ 10% or reach an approved threshold; the effect is stable ≥ 2 Measurement Cycles
S09-N15-DDiagnosis of the "Finance" node in the contour of the evolutionary field: measure the current state and deviations.liquidity; resource cost; financial stability; baselineaccounting; budgets; treasury; banking and investment dataD = 0,40·C + 0,35·Q + 0,25·TS09-N15-K, S09-N15-R, S09-N14-D, S09-N16-D, S08-N15-D, S10-N15-DData coverage ≥ 90%; relevance in the given SLA; We trace the source; recalculation gives a deviation ≤ 5%
S09-N15-KCoordination of the "Finance" node in the contour of the evolutionary field: coordinate participants, constraints and actions.liquidity; resource cost; financial stability; consistency indexaccounting; budgets; treasury; banking and investment dataK = 0,40·A + 0,30·L + 0,30·RS09-N15-D, S09-N15-R, S09-N14-K, S09-N16-K, S08-N15-K, S10-N15-K≥ 80% key actors agreed; roles and solutions fixed; critical conflicts closed; resource gap ≤ 10%
S09-N15-RDevelopment of the "Finance" node in the contour of the evolutionary field: change the state and increase the potential.liquidity; cost of resource; financial stability; growth to the baselineaccounting; budgets; treasury; banking and investment dataR = 0,40·G + 0,30·S + 0,30·VS09-N15-D, S09-N15-K, S09-N14-R, S09-N16-R, S08-N15-R, S10-N15-Rtarget effect confirmed by data; improvement against base line ≥ 10% or reach an approved threshold; the effect is stable ≥ 2 Measurement Cycles
S09-N16-DDiagnosis of the "Personnel" node in the contour of the evolutionary field: measure the current state and deviations.staffing; level of competence; fluidity/continuity; baselineHRIS; competence registers; training; certificationsD = 0,40·C + 0,35·Q + 0,25·TS09-N16-K, S09-N16-R, S09-N15-D, S09-N17-D, S08-N16-D, S10-N16-DData coverage ≥ 90%; relevance in the given SLA; We trace the source; recalculation gives a deviation ≤ 5%
S09-N16-KCoordination of the "Personnel" node in the contour of the evolutionary field: coordinate participants, constraints and actions.staff security; level of competence; fluidity/continuity; consistency indexHRIS; competence registers; training; certificationsK = 0,40·A + 0,30·L + 0,30·RS09-N16-D, S09-N16-R, S09-N15-K, S09-N17-K, S08-N16-K, S10-N16-K≥ 80% key actors agreed; roles and solutions fixed; critical conflicts closed; resource gap ≤ 10%
S09-N16-RDevelopment of the "Personnel" node in the contour of the evolutionary field: change the state and increase the potential.staffing; level of competence; fluidity/continuity; increment to baselineHRIS; competence registers; training; certificationsR = 0,40·G + 0,30·S + 0,30·VS09-N16-D, S09-N16-K, S09-N15-R, S09-N17-R, S08-N16-R, S10-N16-Rtarget effect confirmed by data; improvement against base line ≥ 10% or reach an approved threshold; the effect is stable ≥ 2 Measurement Cycles
S09-N17-DDiagnostics of the node "Technology" in the contour of the evolutionary field: to measure the current state and deviations.technology readiness; technology efficiency; scalability; base lineTRL/MRL; patents; tests; digital models; technical cardsD = 0,40·C + 0,35·Q + 0,25·TS09-N17-K, S09-N17-R, S09-N16-D, S09-N18-D, S08-N17-D, S10-N17-DData coverage ≥ 90%; relevance in the given SLA; We trace the source; recalculation gives a deviation ≤ 5%
S09-N17-KCoordination of the node "Technology" in the contour of the evolutionary field: to coordinate participants, restrictions and actions.technology readiness; technology efficiency; scalability; consistency indexTRL/MRL; patents; tests; digital models; technical cardsK = 0,40·A + 0,30·L + 0,30·RS09-N17-D, S09-N17-R, S09-N16-K, S09-N18-K, S08-N17-K, S10-N17-K≥ 80% key actors agreed; roles and solutions fixed; critical conflicts closed; resource gap ≤ 10%
S09-N17-RDevelopment of the node "Technology" in the contour of the evolutionary field: change the state and increase the potential.technology readiness; technology efficiency; scalability; growth to the baselineTRL/MRL; patents; tests; digital models; technical cardsR = 0,40·G + 0,30·S + 0,30·VS09-N17-D, S09-N17-K, S09-N16-R, S09-N18-R, S08-N17-R, S10-N17-Rtarget effect confirmed by data; improvement against base line ≥ 10% or reach an approved threshold; the effect is stable ≥ 2 Measurement Cycles
S09-N18-DDiagnosis of the node "Wednesday" in the contour of the evolutionary field: to measure the current state and deviations.environmental quality; load on the environment; recovery potential; baselineenvironmental monitoring; GIS; meteo; biocenose observationsD = 0,40·C + 0,35·Q + 0,25·TS09-N18-K, S09-N18-R, S09-N17-D, S09-N19-D, S08-N18-D, S10-N18-DData coverage ≥ 90%; relevance in the given SLA; We trace the source; recalculation gives a deviation ≤ 5%
S09-N18-KCoordination of the node "Wednesday" in the contour of the evolutionary field: to coordinate participants, restrictions and actions.quality of the environment; load on the environment; recovery potential; consistency indexenvironmental monitoring; GIS; meteo; biocenose observationsK = 0,40·A + 0,30·L + 0,30·RS09-N18-D, S09-N18-R, S09-N17-K, S09-N19-K, S08-N18-K, S10-N18-K≥ 80% key actors agreed; roles and solutions fixed; critical conflicts closed; resource gap ≤ 10%
S09-N18-RDevelopment of the node "Wednesday" in the contour of the evolutionary field: change the state and increase the potential.quality of the environment; load on the environment; recovery potential; increase to the baselineenvironmental monitoring; GIS; meteo; biocenose observationsR = 0,40·G + 0,30·S + 0,30·VS09-N18-D, S09-N18-K, S09-N17-R, S09-N19-R, S08-N18-R, S10-N18-Rtarget effect confirmed by data; improvement against base line ≥ 10% or reach an approved threshold; the effect is stable ≥ 2 Measurement Cycles
S09-N19-DDiagnostics of the node "Result" in the contour of the evolutionary field: to measure the current state and deviations.result achievement; effect/costs; result stability; baselineKPI; effects statistics; acceptance acts; impact assessmentD = 0,40·C + 0,35·Q + 0,25·TS09-N19-K, S09-N19-R, S09-N18-D, S08-N19-D, S10-N19-DData coverage ≥ 90%; relevance in the given SLA; We trace the source; recalculation gives a deviation ≤ 5%
S09-N19-KCoordination of the node "Result" in the contour of the evolutionary field: to coordinate participants, restrictions and actions.achievement of result; effect/costs; sustainability of result; consistency indexKPI; effects statistics; acceptance acts; impact assessmentK = 0,40·A + 0,30·L + 0,30·RS09-N19-D, S09-N19-R, S09-N18-K, S08-N19-K, S10-N19-K≥ 80% key actors agreed; roles and solutions fixed; critical conflicts closed; resource gap ≤ 10%
S09-N19-RDevelopment of the node "Result" in the contour of the evolutionary field: change the state and increase the potential.result achievement; effect/costs; result stability; increase to baselineKPI; effects statistics; acceptance acts; impact assessmentR = 0,40·G + 0,30·S + 0,30·VS09-N19-D, S09-N19-K, S09-N18-R, S08-N19-R, S10-N19-Rtarget effect confirmed by data; improvement against base line ≥ 10% or reach an approved threshold; the effect is stable ≥ 2 Measurement Cycles

S10 · Creation and production

Family function: value creation, production, services and execution infrastructure. Modules: 57 (19 Node × 3 Status).

CodeFunctionIndicatorsDataFormulaConnectionsValidation criteria
S10-N01-DDiagnostics of the "Subject" node in the contour of the creative field: measure the current state and deviations.identification of subjects; completeness of roles; level of responsibility; baselineregisters of subjects; organizational structures; contracts; role profilesD = 0,40·C + 0,35·Q + 0,25·TS10-N01-K, S10-N01-R, S10-N02-D, S09-N01-D, S11-N01-DData coverage ≥ 90%; relevance in the given SLA; We trace the source; recalculation gives a deviation ≤ 5%
S10-N01-KCoordination of the node "Subject" in the contour of the creative field: to coordinate participants, restrictions and actions.identification of subjects; completeness of roles; level of responsibility; consistency indexregisters of subjects; organizational structures; contracts; role profilesK = 0,40·A + 0,30·L + 0,30·RS10-N01-D, S10-N01-R, S10-N02-K, S09-N01-K, S11-N01-K≥ 80% key actors agreed; roles and solutions fixed; critical conflicts closed; resource gap ≤ 10%
S10-N01-RDevelopment of the subject node in the contour of the creative field: change the state and increase the potential.Identification of subjects; completeness of roles; level of responsibility; increase to the baselineregisters of subjects; organizational structures; contracts; role profilesR = 0,40·G + 0,30·S + 0,30·VS10-N01-D, S10-N01-K, S10-N02-R, S09-N01-R, S11-N01-Rtarget effect confirmed by data; improvement against base line ≥ 10% or reach an approved threshold; the effect is stable ≥ 2 Measurement Cycles
S10-N02-DDiagnostics of the "Purpose" node in the contour of the creative field: measure the current state and deviations.Measurability of objectives; consistency of objectives; proportion of objectives achieved; baselinestrategies; KPI; programs; decision protocolsD = 0,40·C + 0,35·Q + 0,25·TS10-N02-K, S10-N02-R, S10-N01-D, S10-N03-D, S09-N02-D, S11-N02-DData coverage ≥ 90%; relevance in the given SLA; We trace the source; recalculation gives a deviation ≤ 5%
S10-N02-KCoordination of the “Purpose” node in the contour of the creative field: coordinate participants, restrictions and actions.Measurability of objectives; Coherence of objectives; Percentage of objectives achieved; Coherence indexstrategies; KPI; programs; decision protocolsK = 0,40·A + 0,30·L + 0,30·RS10-N02-D, S10-N02-R, S10-N01-K, S10-N03-K, S09-N02-K, S11-N02-K≥ 80% key actors agreed; roles and solutions fixed; critical conflicts closed; resource gap ≤ 10%
S10-N02-RThe development of the "Purpose" node in the contour of the creative field: change the state and increase the potential.measurability of the goal; consistency of goals; proportion of goals achieved; increase to the baselinestrategies; KPI; programs; decision protocolsR = 0,40·G + 0,30·S + 0,30·VS10-N02-D, S10-N02-K, S10-N01-R, S10-N03-R, S09-N02-R, S11-N02-Rtarget effect confirmed by data; improvement against base line ≥ 10% or reach an approved threshold; the effect is stable ≥ 2 Measurement Cycles
S10-N03-DDiagnostics of the Border node in the contour of the creative field: to measure the current state and deviations.clarity of boundaries; number of boundary conflicts; contour stability; baselinecontour maps; regulations; access rights; territorial dataD = 0,40·C + 0,35·Q + 0,25·TS10-N03-K, S10-N03-R, S10-N02-D, S10-N04-D, S09-N03-D, S11-N03-DData coverage ≥ 90%; relevance in the given SLA; We trace the source; recalculation gives a deviation ≤ 5%
S10-N03-KCoordination of the Border node in the contour of the creative field: coordinate participants, restrictions and actions.clarity of boundaries; number of boundary conflicts; stability of contour; consistency indexcontour maps; regulations; access rights; territorial dataK = 0,40·A + 0,30·L + 0,30·RS10-N03-D, S10-N03-R, S10-N02-K, S10-N04-K, S09-N03-K, S11-N03-K≥ 80% key actors agreed; roles and solutions fixed; critical conflicts closed; resource gap ≤ 10%
S10-N03-RDevelopment of the Border node in the contour of the creative field: change the state and increase the potential.clarity of borders; number of border conflicts; stability of the contour; increment to the baselinecontour maps; regulations; access rights; territorial dataR = 0,40·G + 0,30·S + 0,30·VS10-N03-D, S10-N03-K, S10-N02-R, S10-N04-R, S09-N03-R, S11-N03-Rtarget effect confirmed by data; improvement against base line ≥ 10% or reach an approved threshold; the effect is stable ≥ 2 Measurement Cycles
S10-N04-DDiagnostics of the Resource node in the contour of the creative field: measure the current state and deviations.resource availability; deficit/surplus; efficiency of use; baselinebalance of resources; warehouse/ERP; energy balance; capacityD = 0,40·C + 0,35·Q + 0,25·TS10-N04-K, S10-N04-R, S10-N03-D, S10-N05-D, S09-N04-D, S11-N04-DData coverage ≥ 90%; relevance in the given SLA; We trace the source; recalculation gives a deviation ≤ 5%
S10-N04-KCoordination of the Resource node in the contour of the creative field: coordinate participants, restrictions and actions.resource availability; deficit/surplus; efficiency of use; consistency indexbalance of resources; warehouse/ERP; energy balance; capacityK = 0,40·A + 0,30·L + 0,30·RS10-N04-D, S10-N04-R, S10-N03-K, S10-N05-K, S09-N04-K, S11-N04-K≥ 80% key actors agreed; roles and solutions fixed; critical conflicts closed; resource gap ≤ 10%
S10-N04-RDevelopment of the Resource node in the contour of the creative field: change the state and increase the potential.resource availability; deficit/surplus; efficiency of use; increase to the baselinebalance of resources; warehouse/ERP; energy balance; capacityR = 0,40·G + 0,30·S + 0,30·VS10-N04-D, S10-N04-K, S10-N03-R, S10-N05-R, S09-N04-R, S11-N04-Rtarget effect confirmed by data; improvement against base line ≥ 10% or reach an approved threshold; the effect is stable ≥ 2 Measurement Cycles
S10-N05-DDiagnostics of the Signal node in the contour of the creative field: measure the current state and deviations.reliability of signals; signal delay; fraction of false alarms; baselinesensors; event logs; appeals; media/network monitoringD = 0,40·C + 0,35·Q + 0,25·TS10-N05-K, S10-N05-R, S10-N04-D, S10-N06-D, S09-N05-D, S11-N05-DData coverage ≥ 90%; relevance in the given SLA; We trace the source; recalculation gives a deviation ≤ 5%
S10-N05-KCoordination of the node "Signal" in the contour of the creative field: to coordinate participants, restrictions and actions.reliability of signals; signal delay; proportion of false alarms; consistency indexsensors; event logs; appeals; media/network monitoringK = 0,40·A + 0,30·L + 0,30·RS10-N05-D, S10-N05-R, S10-N04-K, S10-N06-K, S09-N05-K, S11-N05-K≥ 80% key actors agreed; roles and solutions fixed; critical conflicts closed; resource gap ≤ 10%
S10-N05-RDevelopment of the Signal node in the contour of the creative field: change the state and increase the potential.reliability of signals; signal delay; fraction of false alarms; increment to base linesensors; event logs; appeals; media/network monitoringR = 0,40·G + 0,30·S + 0,30·VS10-N05-D, S10-N05-K, S10-N04-R, S10-N06-R, S09-N05-R, S11-N05-Rtarget effect confirmed by data; improvement against base line ≥ 10% or reach an approved threshold; the effect is stable ≥ 2 Measurement Cycles
S10-N06-DDiagnostics of the Knowledge node in the contour of the creative field: measure the current state and deviations.completeness of knowledge; relevance of knowledge; level of evidence; baselineResearch; knowledge bases; publications; expertise; archivesD = 0,40·C + 0,35·Q + 0,25·TS10-N06-K, S10-N06-R, S10-N05-D, S10-N07-D, S09-N06-D, S11-N06-DData coverage ≥ 90%; relevance in the given SLA; We trace the source; recalculation gives a deviation ≤ 5%
S10-N06-KCoordination of the node "Knowledge" in the contour of the creative field: to coordinate participants, restrictions and actions.completeness of knowledge; relevance of knowledge; level of evidence; consistency indexResearch; knowledge bases; publications; expertise; archivesK = 0,40·A + 0,30·L + 0,30·RS10-N06-D, S10-N06-R, S10-N05-K, S10-N07-K, S09-N06-K, S11-N06-K≥ 80% key actors agreed; roles and solutions fixed; critical conflicts closed; resource gap ≤ 10%
S10-N06-RDevelopment of the Knowledge node in the contour of the creative field: change the state and increase the potential.completeness of knowledge; relevance of knowledge; level of evidence; increase to the baselineResearch; knowledge bases; publications; expertise; archivesR = 0,40·G + 0,30·S + 0,30·VS10-N06-D, S10-N06-K, S10-N05-R, S10-N07-R, S09-N06-R, S11-N06-Rtarget effect confirmed by data; improvement against base line ≥ 10% or reach an approved threshold; the effect is stable ≥ 2 Measurement Cycles
S10-N07-DDiagnostics of the "Solution" node in the contour of the creative field: measure the current state and deviations.speed of decision; quality of decision; proportion of decisions executed; baselineEDMS; protocols; tasks; approval logsD = 0,40·C + 0,35·Q + 0,25·TS10-N07-K, S10-N07-R, S10-N06-D, S10-N08-D, S09-N07-D, S11-N07-DData coverage ≥ 90%; relevance in the given SLA; We trace the source; recalculation gives a deviation ≤ 5%
S10-N07-KCoordination of the “Solution” node in the contour of the creative field: coordinate participants, restrictions and actions.speed of decision; quality of decision; proportion of decisions executed; consistency indexEDMS; protocols; tasks; approval logsK = 0,40·A + 0,30·L + 0,30·RS10-N07-D, S10-N07-R, S10-N06-K, S10-N08-K, S09-N07-K, S11-N07-K≥ 80% key actors agreed; roles and solutions fixed; critical conflicts closed; resource gap ≤ 10%
S10-N07-RDevelopment of the “Solution” node in the contour of the creative field: change the state and increase the potential.speed of decision; quality of decision; share of executed decisions; increase to the base lineEDMS; protocols; tasks; approval logsR = 0,40·G + 0,30·S + 0,30·VS10-N07-D, S10-N07-K, S10-N06-R, S10-N08-R, S09-N07-R, S11-N07-Rtarget effect confirmed by data; improvement against base line ≥ 10% or reach an approved threshold; the effect is stable ≥ 2 Measurement Cycles
S10-N08-DDiagnostics of the "Action" node in the contour of the creative field: to measure the current state and deviations.intensity of actions; compliance with deadlines; effectiveness of actions; baselinework plans; trackers; production systems; execution actsD = 0,40·C + 0,35·Q + 0,25·TS10-N08-K, S10-N08-R, S10-N07-D, S10-N09-D, S09-N08-D, S11-N08-DData coverage ≥ 90%; relevance in the given SLA; We trace the source; recalculation gives a deviation ≤ 5%
S10-N08-KCoordination of the Action node in the contour of the creative field: coordinate participants, restrictions and actions.intensity of actions; compliance with deadlines; effectiveness of actions; consistency indexwork plans; trackers; production systems; execution actsK = 0,40·A + 0,30·L + 0,30·RS10-N08-D, S10-N08-R, S10-N07-K, S10-N09-K, S09-N08-K, S11-N08-K≥ 80% key actors agreed; roles and solutions fixed; critical conflicts closed; resource gap ≤ 10%
S10-N08-RDevelopment of the Action node in the contour of the creative field: change the state and increase the potential.intensity of actions; compliance with deadlines; effectiveness of actions; increase to the baselinework plans; trackers; production systems; execution actsR = 0,40·G + 0,30·S + 0,30·VS10-N08-D, S10-N08-K, S10-N07-R, S10-N09-R, S09-N08-R, S11-N08-Rtarget effect confirmed by data; improvement against base line ≥ 10% or reach an approved threshold; the effect is stable ≥ 2 Measurement Cycles
S10-N09-DDiagnostics of the feedback node in the contour of the creative field: measure the current state and deviations.frequency of feedback; correction rate; the proportion of closed deviations; baselineuser feedback; audits; telemetry; control measurementsD = 0,40·C + 0,35·Q + 0,25·TS10-N09-K, S10-N09-R, S10-N08-D, S10-N10-D, S09-N09-D, S11-N09-DData coverage ≥ 90%; relevance in the given SLA; We trace the source; recalculation gives a deviation ≤ 5%
S10-N09-KCoordination of the "Feedback" node in the contour of the creative field: coordinate participants, restrictions and actions.frequency of feedback; correction rate; proportion of closed deviations; consistency indexuser feedback; audits; telemetry; control measurementsK = 0,40·A + 0,30·L + 0,30·RS10-N09-D, S10-N09-R, S10-N08-K, S10-N10-K, S09-N09-K, S11-N09-K≥ 80% key actors agreed; roles and solutions fixed; critical conflicts closed; resource gap ≤ 10%
S10-N09-RDevelopment of the feedback node in the contour of the creative field: change the state and increase the potential.frequency of feedback; correction rate; the proportion of closed deviations; increase to the base lineuser feedback; audits; telemetry; control measurementsR = 0,40·G + 0,30·S + 0,30·VS10-N09-D, S10-N09-K, S10-N08-R, S10-N10-R, S09-N09-R, S11-N09-Rtarget effect confirmed by data; improvement against base line ≥ 10% or reach an approved threshold; the effect is stable ≥ 2 Measurement Cycles
S10-N10-DDiagnostics of the Risk node in the contour of the creative field: measure the current state and deviations.probability of risk; extent of damage; residual risk; baselinerisk registers; incidents; insurance events; scenario modelsD = 0,40·C + 0,35·Q + 0,25·TS10-N10-K, S10-N10-R, S10-N09-D, S10-N11-D, S09-N10-D, S11-N10-DData coverage ≥ 90%; relevance in the given SLA; We trace the source; recalculation gives a deviation ≤ 5%
S10-N10-KCoordination of the node "Risk" in the contour of the creative field: to coordinate participants, restrictions and actions.probability of risk; extent of damage; residual risk; consistency indexrisk registers; incidents; insurance events; scenario modelsK = 0,40·A + 0,30·L + 0,30·RS10-N10-D, S10-N10-R, S10-N09-K, S10-N11-K, S09-N10-K, S11-N10-K≥ 80% key actors agreed; roles and solutions fixed; critical conflicts closed; resource gap ≤ 10%
S10-N10-RDevelopment of the Risk node in the contour of the creative field: change the state and increase the potential.probability of risk; extent of damage; residual risk; increment to baselinerisk registers; incidents; insurance events; scenario modelsR = 0,40·G + 0,30·S + 0,30·VS10-N10-D, S10-N10-K, S10-N09-R, S10-N11-R, S09-N10-R, S11-N10-Rtarget effect confirmed by data; improvement against base line ≥ 10% or reach an approved threshold; the effect is stable ≥ 2 Measurement Cycles
S10-N11-DDiagnostics of the "Trust" node in the contour of the creative field: measure the current state and deviations.trust index; share of confirmed commitments; stability of interactions; baselinehistory of obligations; ratings; contracts; trust surveysD = 0,40·C + 0,35·Q + 0,25·TS10-N11-K, S10-N11-R, S10-N10-D, S10-N12-D, S09-N11-D, S11-N11-DData coverage ≥ 90%; relevance in the given SLA; We trace the source; recalculation gives a deviation ≤ 5%
S10-N11-KCoordination of the “Trust” node in the contour of the creative field: coordinate participants, restrictions and actions.trust index; share of confirmed commitments; stability of interactions; consistency indexhistory of obligations; ratings; contracts; trust surveysK = 0,40·A + 0,30·L + 0,30·RS10-N11-D, S10-N11-R, S10-N10-K, S10-N12-K, S09-N11-K, S11-N11-K≥ 80% key actors agreed; roles and solutions fixed; critical conflicts closed; resource gap ≤ 10%
S10-N11-RThe development of the "Trust" node in the contour of the creative field: change the state and increase the potential.trust index; share of confirmed commitments; stability of interactions; increase to baselinehistory of obligations; ratings; contracts; trust surveysR = 0,40·G + 0,30·S + 0,30·VS10-N11-D, S10-N11-K, S10-N10-R, S10-N12-R, S09-N11-R, S11-N11-Rtarget effect confirmed by data; improvement against base line ≥ 10% or reach an approved threshold; the effect is stable ≥ 2 Measurement Cycles
S10-N12-DDiagnostics of the "Cooperation" node in the contour of the creative field: measure the current state and deviations.number of active links; density of cooperation; share of joint projects; baselinegraph links; agreements; consortia; joint projectsD = 0,40·C + 0,35·Q + 0,25·TS10-N12-K, S10-N12-R, S10-N11-D, S10-N13-D, S09-N12-D, S11-N12-DData coverage ≥ 90%; relevance in the given SLA; We trace the source; recalculation gives a deviation ≤ 5%
S10-N12-KCoordination of the "Cooperation" node in the contour of the creative field: to coordinate participants, restrictions and actions.number of active links; density of cooperation; proportion of joint projects; consistency indexgraph links; agreements; consortia; joint projectsK = 0,40·A + 0,30·L + 0,30·RS10-N12-D, S10-N12-R, S10-N11-K, S10-N13-K, S09-N12-K, S11-N12-K≥ 80% key actors agreed; roles and solutions fixed; critical conflicts closed; resource gap ≤ 10%
S10-N12-RDevelopment of the "Cooperation" node in the contour of the creative field: change the state and increase the potential.number of active links; density of cooperation; share of joint projects; increase to the baselinegraph links; agreements; consortia; joint projectsR = 0,40·G + 0,30·S + 0,30·VS10-N12-D, S10-N12-K, S10-N11-R, S10-N13-R, S09-N12-R, S11-N12-Rtarget effect confirmed by data; improvement against base line ≥ 10% or reach an approved threshold; the effect is stable ≥ 2 Measurement Cycles
S10-N13-DDiagnostics of the "Infrastructure" node in the contour of the creative field: measure the current state and deviations.infrastructure availability; reliability; capacity utilization; base lineGIS; object passports; dispatching; operational logsD = 0,40·C + 0,35·Q + 0,25·TS10-N13-K, S10-N13-R, S10-N12-D, S10-N14-D, S09-N13-D, S11-N13-DData coverage ≥ 90%; relevance in the given SLA; We trace the source; recalculation gives a deviation ≤ 5%
S10-N13-KCoordination of the "Infrastructure" node in the contour of the creative field: coordinate participants, restrictions and actions.infrastructure availability; reliability; capacity utilization; consistency indexGIS; object passports; dispatching; operational logsK = 0,40·A + 0,30·L + 0,30·RS10-N13-D, S10-N13-R, S10-N12-K, S10-N14-K, S09-N13-K, S11-N13-K≥ 80% key actors agreed; roles and solutions fixed; critical conflicts closed; resource gap ≤ 10%
S10-N13-RDevelopment of the "Infrastructure" node in the contour of the creative field: change the state and increase the potential.infrastructure availability; reliability; capacity utilization; increase to base lineGIS; object passports; dispatching; operational logsR = 0,40·G + 0,30·S + 0,30·VS10-N13-D, S10-N13-K, S10-N12-R, S10-N14-R, S09-N13-R, S11-N13-Rtarget effect confirmed by data; improvement against base line ≥ 10% or reach an approved threshold; the effect is stable ≥ 2 Measurement Cycles
S10-N14-DDiagnostics of the "Standard" node in the contour of the creative field: to measure the current state and deviations.standards coverage; compliance; number of deviations; baselinenormative documents; standards; checklists; audit resultsD = 0,40·C + 0,35·Q + 0,25·TS10-N14-K, S10-N14-R, S10-N13-D, S10-N15-D, S09-N14-D, S11-N14-DData coverage ≥ 90%; relevance in the given SLA; We trace the source; recalculation gives a deviation ≤ 5%
S10-N14-KCoordination of the "Standard" node in the contour of the creative field: to coordinate participants, restrictions and actions.standards coverage; compliance; number of deviations; consistency indexnormative documents; standards; checklists; audit resultsK = 0,40·A + 0,30·L + 0,30·RS10-N14-D, S10-N14-R, S10-N13-K, S10-N15-K, S09-N14-K, S11-N14-K≥ 80% key actors agreed; roles and solutions fixed; critical conflicts closed; resource gap ≤ 10%
S10-N14-RDevelopment of the Standard node in the contour of the creative field: change the state and increase the potential.coverage standards; compliance; number of deviations; increase to baselinenormative documents; standards; checklists; audit resultsR = 0,40·G + 0,30·S + 0,30·VS10-N14-D, S10-N14-K, S10-N13-R, S10-N15-R, S09-N14-R, S11-N14-Rtarget effect confirmed by data; improvement against base line ≥ 10% or reach an approved threshold; the effect is stable ≥ 2 Measurement Cycles
S10-N15-DDiagnostics of the "Finance" node in the contour of the creative field: measure the current state and deviations.liquidity; resource cost; financial stability; baselineaccounting; budgets; treasury; banking and investment dataD = 0,40·C + 0,35·Q + 0,25·TS10-N15-K, S10-N15-R, S10-N14-D, S10-N16-D, S09-N15-D, S11-N15-DData coverage ≥ 90%; relevance in the given SLA; We trace the source; recalculation gives a deviation ≤ 5%
S10-N15-KCoordination of the "Finance" node in the contour of the creative field: coordinate participants, restrictions and actions.liquidity; resource cost; financial stability; consistency indexaccounting; budgets; treasury; banking and investment dataK = 0,40·A + 0,30·L + 0,30·RS10-N15-D, S10-N15-R, S10-N14-K, S10-N16-K, S09-N15-K, S11-N15-K≥ 80% key actors agreed; roles and solutions fixed; critical conflicts closed; resource gap ≤ 10%
S10-N15-RDevelopment of the “Finance” node in the contour of the creative field: change the state and increase the potential.liquidity; cost of resource; financial stability; growth to the baselineaccounting; budgets; treasury; banking and investment dataR = 0,40·G + 0,30·S + 0,30·VS10-N15-D, S10-N15-K, S10-N14-R, S10-N16-R, S09-N15-R, S11-N15-Rtarget effect confirmed by data; improvement against base line ≥ 10% or reach an approved threshold; the effect is stable ≥ 2 Measurement Cycles
S10-N16-DDiagnostics of the "Personnel" node in the contour of the creative field: to measure the current state and deviations.staffing; level of competence; fluidity/continuity; baselineHRIS; competence registers; training; certificationsD = 0,40·C + 0,35·Q + 0,25·TS10-N16-K, S10-N16-R, S10-N15-D, S10-N17-D, S09-N16-D, S11-N16-DData coverage ≥ 90%; relevance in the given SLA; We trace the source; recalculation gives a deviation ≤ 5%
S10-N16-KCoordination of the "Personnel" node in the contour of the creative field: coordinate participants, restrictions and actions.staff security; level of competence; fluidity/continuity; consistency indexHRIS; competence registers; training; certificationsK = 0,40·A + 0,30·L + 0,30·RS10-N16-D, S10-N16-R, S10-N15-K, S10-N17-K, S09-N16-K, S11-N16-K≥ 80% key actors agreed; roles and solutions fixed; critical conflicts closed; resource gap ≤ 10%
S10-N16-RDevelopment of the "Personnel" node in the contour of the creative field: change the state and increase the potential.staffing; level of competence; fluidity/continuity; increment to baselineHRIS; competence registers; training; certificationsR = 0,40·G + 0,30·S + 0,30·VS10-N16-D, S10-N16-K, S10-N15-R, S10-N17-R, S09-N16-R, S11-N16-Rtarget effect confirmed by data; improvement against base line ≥ 10% or reach an approved threshold; the effect is stable ≥ 2 Measurement Cycles
S10-N17-DDiagnostics of the node "Technology" in the contour of the creative field: to measure the current state and deviations.technology readiness; technology efficiency; scalability; base lineTRL/MRL; patents; tests; digital models; technical cardsD = 0,40·C + 0,35·Q + 0,25·TS10-N17-K, S10-N17-R, S10-N16-D, S10-N18-D, S09-N17-D, S11-N17-DData coverage ≥ 90%; relevance in the given SLA; We trace the source; recalculation gives a deviation ≤ 5%
S10-N17-KCoordination of the node "Technology" in the contour of the creative field: to coordinate participants, restrictions and actions.technology readiness; technology efficiency; scalability; consistency indexTRL/MRL; patents; tests; digital models; technical cardsK = 0,40·A + 0,30·L + 0,30·RS10-N17-D, S10-N17-R, S10-N16-K, S10-N18-K, S09-N17-K, S11-N17-K≥ 80% key actors agreed; roles and solutions fixed; critical conflicts closed; resource gap ≤ 10%
S10-N17-RDevelopment of the "Technology" node in the contour of the creative field: change the state and increase the potential.technology readiness; technology efficiency; scalability; growth to the baselineTRL/MRL; patents; tests; digital models; technical cardsR = 0,40·G + 0,30·S + 0,30·VS10-N17-D, S10-N17-K, S10-N16-R, S10-N18-R, S09-N17-R, S11-N17-Rtarget effect confirmed by data; improvement against base line ≥ 10% or reach an approved threshold; the effect is stable ≥ 2 Measurement Cycles
S10-N18-DDiagnosis of the node "Wednesday" in the contour of the creative field: to measure the current state and deviations.environmental quality; load on the environment; recovery potential; baselineenvironmental monitoring; GIS; meteo; biocenose observationsD = 0,40·C + 0,35·Q + 0,25·TS10-N18-K, S10-N18-R, S10-N17-D, S10-N19-D, S09-N18-D, S11-N18-DData coverage ≥ 90%; relevance in the given SLA; We trace the source; recalculation gives a deviation ≤ 5%
S10-N18-KCoordination of the “Wednesday” node in the contour of the creative field: coordinate participants, restrictions and actions.quality of the environment; load on the environment; recovery potential; consistency indexenvironmental monitoring; GIS; meteo; biocenose observationsK = 0,40·A + 0,30·L + 0,30·RS10-N18-D, S10-N18-R, S10-N17-K, S10-N19-K, S09-N18-K, S11-N18-K≥ 80% key actors agreed; roles and solutions fixed; critical conflicts closed; resource gap ≤ 10%
S10-N18-RDevelopment of the “Wednesday” node in the contour of the creative field: change the state and increase the potential.quality of the environment; load on the environment; recovery potential; increase to the baselineenvironmental monitoring; GIS; meteo; biocenose observationsR = 0,40·G + 0,30·S + 0,30·VS10-N18-D, S10-N18-K, S10-N17-R, S10-N19-R, S09-N18-R, S11-N18-Rtarget effect confirmed by data; improvement against base line ≥ 10% or reach an approved threshold; the effect is stable ≥ 2 Measurement Cycles
S10-N19-DDiagnostics of the node "Result" in the contour of the creative field: measure the current state and deviations.result achievement; effect/costs; result stability; baselineKPI; effects statistics; acceptance acts; impact assessmentD = 0,40·C + 0,35·Q + 0,25·TS10-N19-K, S10-N19-R, S10-N18-D, S09-N19-D, S11-N19-DData coverage ≥ 90%; relevance in the given SLA; We trace the source; recalculation gives a deviation ≤ 5%
S10-N19-KCoordination of the node "Result" in the contour of the creative field: to coordinate participants, restrictions and actions.achievement of result; effect/costs; sustainability of result; consistency indexKPI; effects statistics; acceptance acts; impact assessmentK = 0,40·A + 0,30·L + 0,30·RS10-N19-D, S10-N19-R, S10-N18-K, S09-N19-K, S11-N19-K≥ 80% key actors agreed; roles and solutions fixed; critical conflicts closed; resource gap ≤ 10%
S10-N19-RDevelopment of the node "Result" in the contour of the creative field: change the state and increase the potential.result achievement; effect/costs; result stability; increase to baselineKPI; effects statistics; acceptance acts; impact assessmentR = 0,40·G + 0,30·S + 0,30·VS10-N19-D, S10-N19-K, S10-N18-R, S09-N19-R, S11-N19-Rtarget effect confirmed by data; improvement against base line ≥ 10% or reach an approved threshold; the effect is stable ≥ 2 Measurement Cycles

S11 · Navigation and strategy

Family function: priorities, routes, portfolios and strategic choices. Modules: 57 (19 Node × 3 Status).

CodeFunctionIndicatorsDataFormulaConnectionsValidation criteria
S11-N01-DDiagnostics of the "Subject" node in the contour of the strategic field: measure the current state and deviations.identification of subjects; completeness of roles; level of responsibility; baselineregisters of subjects; organizational structures; contracts; role profilesD = 0,40·C + 0,35·Q + 0,25·TS11-N01-K, S11-N01-R, S11-N02-D, S10-N01-D, S12-N01-DData coverage ≥ 90%; relevance in the given SLA; We trace the source; recalculation gives a deviation ≤ 5%
S11-N01-KCoordination of the node "Subject" in the contour of the strategic field: to coordinate participants, restrictions and actions.identification of subjects; completeness of roles; level of responsibility; consistency indexregisters of subjects; organizational structures; contracts; role profilesK = 0,40·A + 0,30·L + 0,30·RS11-N01-D, S11-N01-R, S11-N02-K, S10-N01-K, S12-N01-K≥ 80% key actors agreed; roles and solutions fixed; critical conflicts closed; resource gap ≤ 10%
S11-N01-RDevelopment of the subject node in the contour of the strategic field: change the state and increase the potential.Identification of subjects; completeness of roles; level of responsibility; increase to the baselineregisters of subjects; organizational structures; contracts; role profilesR = 0,40·G + 0,30·S + 0,30·VS11-N01-D, S11-N01-K, S11-N02-R, S10-N01-R, S12-N01-Rtarget effect confirmed by data; improvement against base line ≥ 10% or reach an approved threshold; the effect is stable ≥ 2 Measurement Cycles
S11-N02-DDiagnostics of the Target node in the strategic field contour: measure the current state and deviations.Measurability of objectives; consistency of objectives; proportion of objectives achieved; baselinestrategies; KPI; programs; decision protocolsD = 0,40·C + 0,35·Q + 0,25·TS11-N02-K, S11-N02-R, S11-N01-D, S11-N03-D, S10-N02-D, S12-N02-DData coverage ≥ 90%; relevance in the given SLA; We trace the source; recalculation gives a deviation ≤ 5%
S11-N02-KCoordination of the “Purpose” node in the contour of the strategic field: coordinate participants, restrictions and actions.Measurability of objectives; Coherence of objectives; Percentage of objectives achieved; Coherence indexstrategies; KPI; programs; decision protocolsK = 0,40·A + 0,30·L + 0,30·RS11-N02-D, S11-N02-R, S11-N01-K, S11-N03-K, S10-N02-K, S12-N02-K≥ 80% key actors agreed; roles and solutions fixed; critical conflicts closed; resource gap ≤ 10%
S11-N02-RThe development of the “Target” node in the contour of the strategic field: change the state and increase the potential.measurability of the goal; consistency of goals; proportion of goals achieved; increase to the baselinestrategies; KPI; programs; decision protocolsR = 0,40·G + 0,30·S + 0,30·VS11-N02-D, S11-N02-K, S11-N01-R, S11-N03-R, S10-N02-R, S12-N02-Rtarget effect confirmed by data; improvement against base line ≥ 10% or reach an approved threshold; the effect is stable ≥ 2 Measurement Cycles
S11-N03-DDiagnostics of the Border node in the contour of the strategic field: measure the current state and deviations.clarity of boundaries; number of boundary conflicts; contour stability; baselinecontour maps; regulations; access rights; territorial dataD = 0,40·C + 0,35·Q + 0,25·TS11-N03-K, S11-N03-R, S11-N02-D, S11-N04-D, S10-N03-D, S12-N03-DData coverage ≥ 90%; relevance in the given SLA; We trace the source; recalculation gives a deviation ≤ 5%
S11-N03-KCoordination of the Border node in the contour of the strategic field: coordinate participants, restrictions and actions.clarity of boundaries; number of boundary conflicts; stability of contour; consistency indexcontour maps; regulations; access rights; territorial dataK = 0,40·A + 0,30·L + 0,30·RS11-N03-D, S11-N03-R, S11-N02-K, S11-N04-K, S10-N03-K, S12-N03-K≥ 80% key actors agreed; roles and solutions fixed; critical conflicts closed; resource gap ≤ 10%
S11-N03-RDevelopment of the Border node in the contour of the strategic field: change the state and increase the potential.clarity of borders; number of border conflicts; stability of the contour; increment to the baselinecontour maps; regulations; access rights; territorial dataR = 0,40·G + 0,30·S + 0,30·VS11-N03-D, S11-N03-K, S11-N02-R, S11-N04-R, S10-N03-R, S12-N03-Rtarget effect confirmed by data; improvement against base line ≥ 10% or reach an approved threshold; the effect is stable ≥ 2 Measurement Cycles
S11-N04-DDiagnostics of the Resource node in the contour of the strategic field: measure the current state and deviations.resource availability; deficit/surplus; efficiency of use; baselinebalance of resources; warehouse/ERP; energy balance; capacityD = 0,40·C + 0,35·Q + 0,25·TS11-N04-K, S11-N04-R, S11-N03-D, S11-N05-D, S10-N04-D, S12-N04-DData coverage ≥ 90%; relevance in the given SLA; We trace the source; recalculation gives a deviation ≤ 5%
S11-N04-KCoordination of the Resource node in the contour of the strategic field: coordinate participants, restrictions and actions.resource availability; deficit/surplus; efficiency of use; consistency indexbalance of resources; warehouse/ERP; energy balance; capacityK = 0,40·A + 0,30·L + 0,30·RS11-N04-D, S11-N04-R, S11-N03-K, S11-N05-K, S10-N04-K, S12-N04-K≥ 80% key actors agreed; roles and solutions fixed; critical conflicts closed; resource gap ≤ 10%
S11-N04-RDevelopment of the Resource node in the contour of the strategic field: change the state and increase the potential.resource availability; deficit/surplus; efficiency of use; increase to the baselinebalance of resources; warehouse/ERP; energy balance; capacityR = 0,40·G + 0,30·S + 0,30·VS11-N04-D, S11-N04-K, S11-N03-R, S11-N05-R, S10-N04-R, S12-N04-Rtarget effect confirmed by data; improvement against base line ≥ 10% or reach an approved threshold; the effect is stable ≥ 2 Measurement Cycles
S11-N05-DDiagnostics of the Signal node in the outline of the strategic field: measure the current state and deviations.reliability of signals; signal delay; fraction of false alarms; baselinesensors; event logs; appeals; media/network monitoringD = 0,40·C + 0,35·Q + 0,25·TS11-N05-K, S11-N05-R, S11-N04-D, S11-N06-D, S10-N05-D, S12-N05-DData coverage ≥ 90%; relevance in the given SLA; We trace the source; recalculation gives a deviation ≤ 5%
S11-N05-KCoordination of the Signal node in the contour of the strategic field: coordinate participants, restrictions and actions.reliability of signals; signal delay; proportion of false alarms; consistency indexsensors; event logs; appeals; media/network monitoringK = 0,40·A + 0,30·L + 0,30·RS11-N05-D, S11-N05-R, S11-N04-K, S11-N06-K, S10-N05-K, S12-N05-K≥ 80% key actors agreed; roles and solutions fixed; critical conflicts closed; resource gap ≤ 10%
S11-N05-RDevelopment of the Signal node in the contour of the strategic field: change the state and increase the potential.reliability of signals; signal delay; fraction of false alarms; increment to base linesensors; event logs; appeals; media/network monitoringR = 0,40·G + 0,30·S + 0,30·VS11-N05-D, S11-N05-K, S11-N04-R, S11-N06-R, S10-N05-R, S12-N05-Rtarget effect confirmed by data; improvement against base line ≥ 10% or reach an approved threshold; the effect is stable ≥ 2 Measurement Cycles
S11-N06-DDiagnostics of the Knowledge node in the contour of the strategic field: to measure the current state and deviations.completeness of knowledge; relevance of knowledge; level of evidence; baselineResearch; knowledge bases; publications; expertise; archivesD = 0,40·C + 0,35·Q + 0,25·TS11-N06-K, S11-N06-R, S11-N05-D, S11-N07-D, S10-N06-D, S12-N06-DData coverage ≥ 90%; relevance in the given SLA; We trace the source; recalculation gives a deviation ≤ 5%
S11-N06-KCoordination of the Knowledge node in the contour of the strategic field: coordinate participants, restrictions and actions.completeness of knowledge; relevance of knowledge; level of evidence; consistency indexResearch; knowledge bases; publications; expertise; archivesK = 0,40·A + 0,30·L + 0,30·RS11-N06-D, S11-N06-R, S11-N05-K, S11-N07-K, S10-N06-K, S12-N06-K≥ 80% key actors agreed; roles and solutions fixed; critical conflicts closed; resource gap ≤ 10%
S11-N06-RDevelopment of the Knowledge node in the contour of the strategic field: change the state and increase the potential.completeness of knowledge; relevance of knowledge; level of evidence; increase to the baselineResearch; knowledge bases; publications; expertise; archivesR = 0,40·G + 0,30·S + 0,30·VS11-N06-D, S11-N06-K, S11-N05-R, S11-N07-R, S10-N06-R, S12-N06-Rtarget effect confirmed by data; improvement against base line ≥ 10% or reach an approved threshold; the effect is stable ≥ 2 Measurement Cycles
S11-N07-DDiagnostics of the "Solution" node in the contour of the strategic field: to measure the current state and deviations.speed of decision; quality of decision; proportion of decisions executed; baselineEDMS; protocols; tasks; approval logsD = 0,40·C + 0,35·Q + 0,25·TS11-N07-K, S11-N07-R, S11-N06-D, S11-N08-D, S10-N07-D, S12-N07-DData coverage ≥ 90%; relevance in the given SLA; We trace the source; recalculation gives a deviation ≤ 5%
S11-N07-KCoordination of the “Solution” node in the contour of the strategic field: coordinate participants, restrictions and actions.speed of decision; quality of decision; proportion of decisions executed; consistency indexEDMS; protocols; tasks; approval logsK = 0,40·A + 0,30·L + 0,30·RS11-N07-D, S11-N07-R, S11-N06-K, S11-N08-K, S10-N07-K, S12-N07-K≥ 80% key actors agreed; roles and solutions fixed; critical conflicts closed; resource gap ≤ 10%
S11-N07-RDevelopment of the “Solution” node in the contour of the strategic field: change the state and increase the potential.speed of decision; quality of decision; share of executed decisions; increase to the base lineEDMS; protocols; tasks; approval logsR = 0,40·G + 0,30·S + 0,30·VS11-N07-D, S11-N07-K, S11-N06-R, S11-N08-R, S10-N07-R, S12-N07-Rtarget effect confirmed by data; improvement against base line ≥ 10% or reach an approved threshold; the effect is stable ≥ 2 Measurement Cycles
S11-N08-DDiagnostics of the Action node in the contour of the strategic field: measure the current state and deviations.intensity of actions; compliance with deadlines; effectiveness of actions; baselinework plans; trackers; production systems; execution actsD = 0,40·C + 0,35·Q + 0,25·TS11-N08-K, S11-N08-R, S11-N07-D, S11-N09-D, S10-N08-D, S12-N08-DData coverage ≥ 90%; relevance in the given SLA; We trace the source; recalculation gives a deviation ≤ 5%
S11-N08-KCoordination of the Action node in the contour of the strategic field: coordinate participants, restrictions and actions.intensity of actions; compliance with deadlines; effectiveness of actions; consistency indexwork plans; trackers; production systems; execution actsK = 0,40·A + 0,30·L + 0,30·RS11-N08-D, S11-N08-R, S11-N07-K, S11-N09-K, S10-N08-K, S12-N08-K≥ 80% key actors agreed; roles and solutions fixed; critical conflicts closed; resource gap ≤ 10%
S11-N08-RDevelopment of the Action node in the contour of the strategic field: change the state and increase the potential.intensity of actions; compliance with deadlines; effectiveness of actions; increase to the baselinework plans; trackers; production systems; execution actsR = 0,40·G + 0,30·S + 0,30·VS11-N08-D, S11-N08-K, S11-N07-R, S11-N09-R, S10-N08-R, S12-N08-Rtarget effect confirmed by data; improvement against base line ≥ 10% or reach an approved threshold; the effect is stable ≥ 2 Measurement Cycles
S11-N09-DDiagnostics of the "Feedback" node in the contour of the strategic field: measure the current state and deviations.frequency of feedback; correction rate; the proportion of closed deviations; baselineuser feedback; audits; telemetry; control measurementsD = 0,40·C + 0,35·Q + 0,25·TS11-N09-K, S11-N09-R, S11-N08-D, S11-N10-D, S10-N09-D, S12-N09-DData coverage ≥ 90%; relevance in the given SLA; We trace the source; recalculation gives a deviation ≤ 5%
S11-N09-KCoordination of the "Feedback" node in the contour of the strategic field: coordinate participants, restrictions and actions.frequency of feedback; correction rate; proportion of closed deviations; consistency indexuser feedback; audits; telemetry; control measurementsK = 0,40·A + 0,30·L + 0,30·RS11-N09-D, S11-N09-R, S11-N08-K, S11-N10-K, S10-N09-K, S12-N09-K≥ 80% key actors agreed; roles and solutions fixed; critical conflicts closed; resource gap ≤ 10%
S11-N09-RDevelopment of the feedback node in the contour of the strategic field: change the state and increase the potential.frequency of feedback; correction rate; the proportion of closed deviations; increase to the base lineuser feedback; audits; telemetry; control measurementsR = 0,40·G + 0,30·S + 0,30·VS11-N09-D, S11-N09-K, S11-N08-R, S11-N10-R, S10-N09-R, S12-N09-Rtarget effect confirmed by data; improvement against base line ≥ 10% or reach an approved threshold; the effect is stable ≥ 2 Measurement Cycles
S11-N10-DDiagnosis of the Risk node in the contour of the strategic field: measure the current state and deviations.probability of risk; extent of damage; residual risk; baselinerisk registers; incidents; insurance events; scenario modelsD = 0,40·C + 0,35·Q + 0,25·TS11-N10-K, S11-N10-R, S11-N09-D, S11-N11-D, S10-N10-D, S12-N10-DData coverage ≥ 90%; relevance in the given SLA; We trace the source; recalculation gives a deviation ≤ 5%
S11-N10-KCoordination of the Risk node in the contour of the strategic field: coordinate participants, restrictions and actions.probability of risk; extent of damage; residual risk; consistency indexrisk registers; incidents; insurance events; scenario modelsK = 0,40·A + 0,30·L + 0,30·RS11-N10-D, S11-N10-R, S11-N09-K, S11-N11-K, S10-N10-K, S12-N10-K≥ 80% key actors agreed; roles and solutions fixed; critical conflicts closed; resource gap ≤ 10%
S11-N10-RDevelopment of the Risk node in the contour of the strategic field: change the state and increase the potential.probability of risk; extent of damage; residual risk; increment to baselinerisk registers; incidents; insurance events; scenario modelsR = 0,40·G + 0,30·S + 0,30·VS11-N10-D, S11-N10-K, S11-N09-R, S11-N11-R, S10-N10-R, S12-N10-Rtarget effect confirmed by data; improvement against base line ≥ 10% or reach an approved threshold; the effect is stable ≥ 2 Measurement Cycles
S11-N11-DDiagnostics of the "Trust" node in the contour of the strategic field: measure the current state and deviations.trust index; share of confirmed commitments; stability of interactions; baselinehistory of obligations; ratings; contracts; trust surveysD = 0,40·C + 0,35·Q + 0,25·TS11-N11-K, S11-N11-R, S11-N10-D, S11-N12-D, S10-N11-D, S12-N11-DData coverage ≥ 90%; relevance in the given SLA; We trace the source; recalculation gives a deviation ≤ 5%
S11-N11-KCoordination of the “Trust” node in the contour of the strategic field: to coordinate participants, restrictions and actions.trust index; share of confirmed commitments; stability of interactions; consistency indexhistory of obligations; ratings; contracts; trust surveysK = 0,40·A + 0,30·L + 0,30·RS11-N11-D, S11-N11-R, S11-N10-K, S11-N12-K, S10-N11-K, S12-N11-K≥ 80% key actors agreed; roles and solutions fixed; critical conflicts closed; resource gap ≤ 10%
S11-N11-RThe development of the “Trust” node in the contour of the strategic field: change the state and increase the potential.trust index; share of confirmed commitments; stability of interactions; increase to baselinehistory of obligations; ratings; contracts; trust surveysR = 0,40·G + 0,30·S + 0,30·VS11-N11-D, S11-N11-K, S11-N10-R, S11-N12-R, S10-N11-R, S12-N11-Rtarget effect confirmed by data; improvement against base line ≥ 10% or reach an approved threshold; the effect is stable ≥ 2 Measurement Cycles
S11-N12-DDiagnostics of the "Cooperation" node in the contour of the strategic field: to measure the current state and deviations.number of active links; density of cooperation; share of joint projects; baselinegraph links; agreements; consortia; joint projectsD = 0,40·C + 0,35·Q + 0,25·TS11-N12-K, S11-N12-R, S11-N11-D, S11-N13-D, S10-N12-D, S12-N12-DData coverage ≥ 90%; relevance in the given SLA; We trace the source; recalculation gives a deviation ≤ 5%
S11-N12-KCoordination of the "Cooperation" node in the contour of the strategic field: to coordinate participants, restrictions and actions.number of active links; density of cooperation; proportion of joint projects; consistency indexgraph links; agreements; consortia; joint projectsK = 0,40·A + 0,30·L + 0,30·RS11-N12-D, S11-N12-R, S11-N11-K, S11-N13-K, S10-N12-K, S12-N12-K≥ 80% key actors agreed; roles and solutions fixed; critical conflicts closed; resource gap ≤ 10%
S11-N12-RDevelopment of the cooperation node in the contour of the strategic field: change the state and increase the potential.number of active links; density of cooperation; share of joint projects; increase to the baselinegraph links; agreements; consortia; joint projectsR = 0,40·G + 0,30·S + 0,30·VS11-N12-D, S11-N12-K, S11-N11-R, S11-N13-R, S10-N12-R, S12-N12-Rtarget effect confirmed by data; improvement against base line ≥ 10% or reach an approved threshold; the effect is stable ≥ 2 Measurement Cycles
S11-N13-DDiagnostics of the Infrastructure node in the contour of the strategic field: to measure the current state and deviations.infrastructure availability; reliability; capacity utilization; base lineGIS; object passports; dispatching; operational logsD = 0,40·C + 0,35·Q + 0,25·TS11-N13-K, S11-N13-R, S11-N12-D, S11-N14-D, S10-N13-D, S12-N13-DData coverage ≥ 90%; relevance in the given SLA; We trace the source; recalculation gives a deviation ≤ 5%
S11-N13-KCoordination of the "Infrastructure" node in the contour of the strategic field: coordinate participants, restrictions and actions.infrastructure availability; reliability; capacity utilization; consistency indexGIS; object passports; dispatching; operational logsK = 0,40·A + 0,30·L + 0,30·RS11-N13-D, S11-N13-R, S11-N12-K, S11-N14-K, S10-N13-K, S12-N13-K≥ 80% key actors agreed; roles and solutions fixed; critical conflicts closed; resource gap ≤ 10%
S11-N13-RDevelopment of the Infrastructure node in the contour of the strategic field: change the state and increase the potential.infrastructure availability; reliability; capacity utilization; increase to base lineGIS; object passports; dispatching; operational logsR = 0,40·G + 0,30·S + 0,30·VS11-N13-D, S11-N13-K, S11-N12-R, S11-N14-R, S10-N13-R, S12-N13-Rtarget effect confirmed by data; improvement against base line ≥ 10% or reach an approved threshold; the effect is stable ≥ 2 Measurement Cycles
S11-N14-DDiagnostics of the "Standard" node in the contour of the strategic field: measure the current state and deviations.standards coverage; compliance; number of deviations; baselinenormative documents; standards; checklists; audit resultsD = 0,40·C + 0,35·Q + 0,25·TS11-N14-K, S11-N14-R, S11-N13-D, S11-N15-D, S10-N14-D, S12-N14-DData coverage ≥ 90%; relevance in the given SLA; We trace the source; recalculation gives a deviation ≤ 5%
S11-N14-KCoordination of the “Standard” node in the contour of the strategic field: coordinate participants, restrictions and actions.standards coverage; compliance; number of deviations; consistency indexnormative documents; standards; checklists; audit resultsK = 0,40·A + 0,30·L + 0,30·RS11-N14-D, S11-N14-R, S11-N13-K, S11-N15-K, S10-N14-K, S12-N14-K≥ 80% key actors agreed; roles and solutions fixed; critical conflicts closed; resource gap ≤ 10%
S11-N14-RDevelopment of the Standard node in the contour of the strategic field: change the state and increase the potential.coverage standards; compliance; number of deviations; increase to baselinenormative documents; standards; checklists; audit resultsR = 0,40·G + 0,30·S + 0,30·VS11-N14-D, S11-N14-K, S11-N13-R, S11-N15-R, S10-N14-R, S12-N14-Rtarget effect confirmed by data; improvement against base line ≥ 10% or reach an approved threshold; the effect is stable ≥ 2 Measurement Cycles
S11-N15-DDiagnostics of the "Finance" node in the contour of the strategic field: measure the current state and deviations.liquidity; resource cost; financial stability; baselineaccounting; budgets; treasury; banking and investment dataD = 0,40·C + 0,35·Q + 0,25·TS11-N15-K, S11-N15-R, S11-N14-D, S11-N16-D, S10-N15-D, S12-N15-DData coverage ≥ 90%; relevance in the given SLA; We trace the source; recalculation gives a deviation ≤ 5%
S11-N15-KCoordination of the "Finance" node in the contour of the strategic field: coordinate participants, restrictions and actions.liquidity; resource cost; financial stability; consistency indexaccounting; budgets; treasury; banking and investment dataK = 0,40·A + 0,30·L + 0,30·RS11-N15-D, S11-N15-R, S11-N14-K, S11-N16-K, S10-N15-K, S12-N15-K≥ 80% key actors agreed; roles and solutions fixed; critical conflicts closed; resource gap ≤ 10%
S11-N15-RDevelopment of the Finance node in the contour of the strategic field: change the state and increase the potential.liquidity; cost of resource; financial stability; growth to the baselineaccounting; budgets; treasury; banking and investment dataR = 0,40·G + 0,30·S + 0,30·VS11-N15-D, S11-N15-K, S11-N14-R, S11-N16-R, S10-N15-R, S12-N15-Rtarget effect confirmed by data; improvement against base line ≥ 10% or reach an approved threshold; the effect is stable ≥ 2 Measurement Cycles
S11-N16-DDiagnostics of the "Personnel" node in the contour of the strategic field: measure the current state and deviations.staffing; level of competence; fluidity/continuity; baselineHRIS; competence registers; training; certificationsD = 0,40·C + 0,35·Q + 0,25·TS11-N16-K, S11-N16-R, S11-N15-D, S11-N17-D, S10-N16-D, S12-N16-DData coverage ≥ 90%; relevance in the given SLA; We trace the source; recalculation gives a deviation ≤ 5%
S11-N16-KCoordination of the "Personnel" node in the contour of the strategic field: coordinate participants, restrictions and actions.staff security; level of competence; fluidity/continuity; consistency indexHRIS; competence registers; training; certificationsK = 0,40·A + 0,30·L + 0,30·RS11-N16-D, S11-N16-R, S11-N15-K, S11-N17-K, S10-N16-K, S12-N16-K≥ 80% key actors agreed; roles and solutions fixed; critical conflicts closed; resource gap ≤ 10%
S11-N16-RDevelopment of the Personnel node in the contour of the strategic field: change the state and increase the potential.staffing; level of competence; fluidity/continuity; increment to baselineHRIS; competence registers; training; certificationsR = 0,40·G + 0,30·S + 0,30·VS11-N16-D, S11-N16-K, S11-N15-R, S11-N17-R, S10-N16-R, S12-N16-Rtarget effect confirmed by data; improvement against base line ≥ 10% or reach an approved threshold; the effect is stable ≥ 2 Measurement Cycles
S11-N17-DDiagnostics of the "Technology" node in the contour of the strategic field: to measure the current state and deviations.technology readiness; technology efficiency; scalability; base lineTRL/MRL; patents; tests; digital models; technical cardsD = 0,40·C + 0,35·Q + 0,25·TS11-N17-K, S11-N17-R, S11-N16-D, S11-N18-D, S10-N17-D, S12-N17-DData coverage ≥ 90%; relevance in the given SLA; We trace the source; recalculation gives a deviation ≤ 5%
S11-N17-KCoordination of the node "Technology" in the contour of the strategic field: to coordinate participants, restrictions and actions.technology readiness; technology efficiency; scalability; consistency indexTRL/MRL; patents; tests; digital models; technical cardsK = 0,40·A + 0,30·L + 0,30·RS11-N17-D, S11-N17-R, S11-N16-K, S11-N18-K, S10-N17-K, S12-N17-K≥ 80% key actors agreed; roles and solutions fixed; critical conflicts closed; resource gap ≤ 10%
S11-N17-RDevelopment of the "Technology" node in the contour of the strategic field: to change the state and increase the potential.technology readiness; technology efficiency; scalability; growth to the baselineTRL/MRL; patents; tests; digital models; technical cardsR = 0,40·G + 0,30·S + 0,30·VS11-N17-D, S11-N17-K, S11-N16-R, S11-N18-R, S10-N17-R, S12-N17-Rtarget effect confirmed by data; improvement against base line ≥ 10% or reach an approved threshold; the effect is stable ≥ 2 Measurement Cycles
S11-N18-DDiagnosis of the "Wednesday" node in the contour of the strategic field: to measure the current state and deviations.environmental quality; load on the environment; recovery potential; baselineenvironmental monitoring; GIS; meteo; biocenose observationsD = 0,40·C + 0,35·Q + 0,25·TS11-N18-K, S11-N18-R, S11-N17-D, S11-N19-D, S10-N18-D, S12-N18-DData coverage ≥ 90%; relevance in the given SLA; We trace the source; recalculation gives a deviation ≤ 5%
S11-N18-KCoordination of the node "Environment" in the contour of the strategic field: to coordinate participants, restrictions and actions.quality of the environment; load on the environment; recovery potential; consistency indexenvironmental monitoring; GIS; meteo; biocenose observationsK = 0,40·A + 0,30·L + 0,30·RS11-N18-D, S11-N18-R, S11-N17-K, S11-N19-K, S10-N18-K, S12-N18-K≥ 80% key actors agreed; roles and solutions fixed; critical conflicts closed; resource gap ≤ 10%
S11-N18-RDevelopment of the “Environment” node in the contour of the strategic field: change the state and increase the potential.quality of the environment; load on the environment; recovery potential; increase to the baselineenvironmental monitoring; GIS; meteo; biocenose observationsR = 0,40·G + 0,30·S + 0,30·VS11-N18-D, S11-N18-K, S11-N17-R, S11-N19-R, S10-N18-R, S12-N18-Rtarget effect confirmed by data; improvement against base line ≥ 10% or reach an approved threshold; the effect is stable ≥ 2 Measurement Cycles
S11-N19-DDiagnostics of the node "Result" in the contour of the strategic field: to measure the current state and deviations.result achievement; effect/costs; result stability; baselineKPI; effects statistics; acceptance acts; impact assessmentD = 0,40·C + 0,35·Q + 0,25·TS11-N19-K, S11-N19-R, S11-N18-D, S10-N19-D, S12-N19-DData coverage ≥ 90%; relevance in the given SLA; We trace the source; recalculation gives a deviation ≤ 5%
S11-N19-KCoordination of the node "Result" in the contour of the strategic field: to coordinate participants, restrictions and actions.achievement of result; effect/costs; sustainability of result; consistency indexKPI; effects statistics; acceptance acts; impact assessmentK = 0,40·A + 0,30·L + 0,30·RS11-N19-D, S11-N19-R, S11-N18-K, S10-N19-K, S12-N19-K≥ 80% key actors agreed; roles and solutions fixed; critical conflicts closed; resource gap ≤ 10%
S11-N19-RDevelopment of the node "Result" in the contour of the strategic field: to change the state and increase the potential.result achievement; effect/costs; result stability; increase to baselineKPI; effects statistics; acceptance acts; impact assessmentR = 0,40·G + 0,30·S + 0,30·VS11-N19-D, S11-N19-K, S11-N18-R, S10-N19-R, S12-N19-Rtarget effect confirmed by data; improvement against base line ≥ 10% or reach an approved threshold; the effect is stable ≥ 2 Measurement Cycles

S12 · Life and Ecology

Family function: biocenoses, environment, ecosystem health and natural reproducibility. Modules: 57 (19 Node × 3 Status).

CodeFunctionIndicatorsDataFormulaConnectionsValidation criteria
S12-N01-DDiagnostics of the "Subject" node in the contour of the ecological field: measure the current state and deviations.identification of subjects; completeness of roles; level of responsibility; baselineregisters of subjects; organizational structures; contracts; role profilesD = 0,40·C + 0,35·Q + 0,25·TS12-N01-K, S12-N01-R, S12-N02-D, S11-N01-D, S13-N01-DData coverage ≥ 90%; relevance in the given SLA; We trace the source; recalculation gives a deviation ≤ 5%
S12-N01-KCoordination of the node "Subject" in the contour of the environmental field: agree on participants, restrictions and actions.identification of subjects; completeness of roles; level of responsibility; consistency indexregisters of subjects; organizational structures; contracts; role profilesK = 0,40·A + 0,30·L + 0,30·RS12-N01-D, S12-N01-R, S12-N02-K, S11-N01-K, S13-N01-K≥ 80% key actors agreed; roles and solutions fixed; critical conflicts closed; resource gap ≤ 10%
S12-N01-RDevelopment of the subject node in the contour of the ecological field: change the state and increase the potential.Identification of subjects; completeness of roles; level of responsibility; increase to the baselineregisters of subjects; organizational structures; contracts; role profilesR = 0,40·G + 0,30·S + 0,30·VS12-N01-D, S12-N01-K, S12-N02-R, S11-N01-R, S13-N01-Rtarget effect confirmed by data; improvement against base line ≥ 10% or reach an approved threshold; the effect is stable ≥ 2 Measurement Cycles
S12-N02-DDiagnostics of the "Purpose" node in the contour of the ecological field: measure the current state and deviations.Measurability of objectives; consistency of objectives; proportion of objectives achieved; baselinestrategies; KPI; programs; decision protocolsD = 0,40·C + 0,35·Q + 0,25·TS12-N02-K, S12-N02-R, S12-N01-D, S12-N03-D, S11-N02-D, S13-N02-DData coverage ≥ 90%; relevance in the given SLA; We trace the source; recalculation gives a deviation ≤ 5%
S12-N02-KCoordination of the "Purpose" node in the contour of the environmental field: agree on participants, restrictions and actions.Measurability of objectives; Coherence of objectives; Percentage of objectives achieved; Coherence indexstrategies; KPI; programs; decision protocolsK = 0,40·A + 0,30·L + 0,30·RS12-N02-D, S12-N02-R, S12-N01-K, S12-N03-K, S11-N02-K, S13-N02-K≥ 80% key actors agreed; roles and solutions fixed; critical conflicts closed; resource gap ≤ 10%
S12-N02-RThe development of the "Target" node in the contour of the ecological field: change the state and increase the potential.measurability of the goal; consistency of goals; proportion of goals achieved; increase to the baselinestrategies; KPI; programs; decision protocolsR = 0,40·G + 0,30·S + 0,30·VS12-N02-D, S12-N02-K, S12-N01-R, S12-N03-R, S11-N02-R, S13-N02-Rtarget effect confirmed by data; improvement against base line ≥ 10% or reach an approved threshold; the effect is stable ≥ 2 Measurement Cycles
S12-N03-DDiagnostics of the Border node in the contour of the ecological field: measure the current state and deviations.clarity of boundaries; number of boundary conflicts; contour stability; baselinecontour maps; regulations; access rights; territorial dataD = 0,40·C + 0,35·Q + 0,25·TS12-N03-K, S12-N03-R, S12-N02-D, S12-N04-D, S11-N03-D, S13-N03-DData coverage ≥ 90%; relevance in the given SLA; We trace the source; recalculation gives a deviation ≤ 5%
S12-N03-KCoordination of the Border node in the contour of the environmental field: agree on participants, restrictions and actions.clarity of boundaries; number of boundary conflicts; stability of contour; consistency indexcontour maps; regulations; access rights; territorial dataK = 0,40·A + 0,30·L + 0,30·RS12-N03-D, S12-N03-R, S12-N02-K, S12-N04-K, S11-N03-K, S13-N03-K≥ 80% key actors agreed; roles and solutions fixed; critical conflicts closed; resource gap ≤ 10%
S12-N03-RDevelopment of the Border node in the contour of the ecological field: change the state and increase the potential.clarity of borders; number of border conflicts; stability of the contour; increment to the baselinecontour maps; regulations; access rights; territorial dataR = 0,40·G + 0,30·S + 0,30·VS12-N03-D, S12-N03-K, S12-N02-R, S12-N04-R, S11-N03-R, S13-N03-Rtarget effect confirmed by data; improvement against base line ≥ 10% or reach an approved threshold; the effect is stable ≥ 2 Measurement Cycles
S12-N04-DDiagnostics of the Resource node in the contour of the ecological field: measure the current state and deviations.resource availability; deficit/surplus; efficiency of use; baselinebalance of resources; warehouse/ERP; energy balance; capacityD = 0,40·C + 0,35·Q + 0,25·TS12-N04-K, S12-N04-R, S12-N03-D, S12-N05-D, S11-N04-D, S13-N04-DData coverage ≥ 90%; relevance in the given SLA; We trace the source; recalculation gives a deviation ≤ 5%
S12-N04-KCoordination of the Resource node in the contour of the environmental field: agree on participants, restrictions and actions.resource availability; deficit/surplus; efficiency of use; consistency indexbalance of resources; warehouse/ERP; energy balance; capacityK = 0,40·A + 0,30·L + 0,30·RS12-N04-D, S12-N04-R, S12-N03-K, S12-N05-K, S11-N04-K, S13-N04-K≥ 80% key actors agreed; roles and solutions fixed; critical conflicts closed; resource gap ≤ 10%
S12-N04-RDevelopment of the Resource node in the contour of the ecological field: change the state and increase the potential.resource availability; deficit/surplus; efficiency of use; increase to the baselinebalance of resources; warehouse/ERP; energy balance; capacityR = 0,40·G + 0,30·S + 0,30·VS12-N04-D, S12-N04-K, S12-N03-R, S12-N05-R, S11-N04-R, S13-N04-Rtarget effect confirmed by data; improvement against base line ≥ 10% or reach an approved threshold; the effect is stable ≥ 2 Measurement Cycles
S12-N05-DDiagnostics of the Signal node in the contour of the ecological field: measure the current state and deviations.reliability of signals; signal delay; fraction of false alarms; baselinesensors; event logs; appeals; media/network monitoringD = 0,40·C + 0,35·Q + 0,25·TS12-N05-K, S12-N05-R, S12-N04-D, S12-N06-D, S11-N05-D, S13-N05-DData coverage ≥ 90%; relevance in the given SLA; We trace the source; recalculation gives a deviation ≤ 5%
S12-N05-KCoordination of the signal node in the contour of the environmental field: coordinate participants, restrictions and actions.reliability of signals; signal delay; proportion of false alarms; consistency indexsensors; event logs; appeals; media/network monitoringK = 0,40·A + 0,30·L + 0,30·RS12-N05-D, S12-N05-R, S12-N04-K, S12-N06-K, S11-N05-K, S13-N05-K≥ 80% key actors agreed; roles and solutions fixed; critical conflicts closed; resource gap ≤ 10%
S12-N05-RDevelopment of the Signal node in the contour of the ecological field: change the state and increase the potential.reliability of signals; signal delay; fraction of false alarms; increment to base linesensors; event logs; appeals; media/network monitoringR = 0,40·G + 0,30·S + 0,30·VS12-N05-D, S12-N05-K, S12-N04-R, S12-N06-R, S11-N05-R, S13-N05-Rtarget effect confirmed by data; improvement against base line ≥ 10% or reach an approved threshold; the effect is stable ≥ 2 Measurement Cycles
S12-N06-DDiagnostics of the Knowledge node in the contour of the environmental field: measure the current state and deviations.completeness of knowledge; relevance of knowledge; level of evidence; baselineResearch; knowledge bases; publications; expertise; archivesD = 0,40·C + 0,35·Q + 0,25·TS12-N06-K, S12-N06-R, S12-N05-D, S12-N07-D, S11-N06-D, S13-N06-DData coverage ≥ 90%; relevance in the given SLA; We trace the source; recalculation gives a deviation ≤ 5%
S12-N06-KCoordination of the "Knowledge" node in the contour of the environmental field: agree on participants, restrictions and actions.completeness of knowledge; relevance of knowledge; level of evidence; consistency indexResearch; knowledge bases; publications; expertise; archivesK = 0,40·A + 0,30·L + 0,30·RS12-N06-D, S12-N06-R, S12-N05-K, S12-N07-K, S11-N06-K, S13-N06-K≥ 80% key actors agreed; roles and solutions fixed; critical conflicts closed; resource gap ≤ 10%
S12-N06-RDevelopment of the Knowledge node in the contour of the ecological field: change the state and increase the potential.completeness of knowledge; relevance of knowledge; level of evidence; increase to the baselineResearch; knowledge bases; publications; expertise; archivesR = 0,40·G + 0,30·S + 0,30·VS12-N06-D, S12-N06-K, S12-N05-R, S12-N07-R, S11-N06-R, S13-N06-Rtarget effect confirmed by data; improvement against base line ≥ 10% or reach an approved threshold; the effect is stable ≥ 2 Measurement Cycles
S12-N07-DDiagnostics of the "Solution" node in the contour of the ecological field: measure the current state and deviations.speed of decision; quality of decision; proportion of decisions executed; baselineEDMS; protocols; tasks; approval logsD = 0,40·C + 0,35·Q + 0,25·TS12-N07-K, S12-N07-R, S12-N06-D, S12-N08-D, S11-N07-D, S13-N07-DData coverage ≥ 90%; relevance in the given SLA; We trace the source; recalculation gives a deviation ≤ 5%
S12-N07-KCoordination of the "Solution" node in the contour of the environmental field: agree on participants, restrictions and actions.speed of decision; quality of decision; proportion of decisions executed; consistency indexEDMS; protocols; tasks; approval logsK = 0,40·A + 0,30·L + 0,30·RS12-N07-D, S12-N07-R, S12-N06-K, S12-N08-K, S11-N07-K, S13-N07-K≥ 80% key actors agreed; roles and solutions fixed; critical conflicts closed; resource gap ≤ 10%
S12-N07-RDevelopment of the "Solution" node in the contour of the ecological field: change the state and increase the potential.speed of decision; quality of decision; share of executed decisions; increase to the base lineEDMS; protocols; tasks; approval logsR = 0,40·G + 0,30·S + 0,30·VS12-N07-D, S12-N07-K, S12-N06-R, S12-N08-R, S11-N07-R, S13-N07-Rtarget effect confirmed by data; improvement against base line ≥ 10% or reach an approved threshold; the effect is stable ≥ 2 Measurement Cycles
S12-N08-DDiagnostics of the Action node in the contour of the ecological field: measure the current state and deviations.intensity of actions; compliance with deadlines; effectiveness of actions; baselinework plans; trackers; production systems; execution actsD = 0,40·C + 0,35·Q + 0,25·TS12-N08-K, S12-N08-R, S12-N07-D, S12-N09-D, S11-N08-D, S13-N08-DData coverage ≥ 90%; relevance in the given SLA; We trace the source; recalculation gives a deviation ≤ 5%
S12-N08-KCoordination of the "Action" node in the contour of the environmental field: agree on participants, restrictions and actions.intensity of actions; compliance with deadlines; effectiveness of actions; consistency indexwork plans; trackers; production systems; execution actsK = 0,40·A + 0,30·L + 0,30·RS12-N08-D, S12-N08-R, S12-N07-K, S12-N09-K, S11-N08-K, S13-N08-K≥ 80% key actors agreed; roles and solutions fixed; critical conflicts closed; resource gap ≤ 10%
S12-N08-RDevelopment of the Action node in the contour of the ecological field: change the state and increase the potential.intensity of actions; compliance with deadlines; effectiveness of actions; increase to the baselinework plans; trackers; production systems; execution actsR = 0,40·G + 0,30·S + 0,30·VS12-N08-D, S12-N08-K, S12-N07-R, S12-N09-R, S11-N08-R, S13-N08-Rtarget effect confirmed by data; improvement against base line ≥ 10% or reach an approved threshold; the effect is stable ≥ 2 Measurement Cycles
S12-N09-DDiagnostics of the "Feedback" node in the contour of the environmental field: measure the current state and deviations.frequency of feedback; correction rate; the proportion of closed deviations; baselineuser feedback; audits; telemetry; control measurementsD = 0,40·C + 0,35·Q + 0,25·TS12-N09-K, S12-N09-R, S12-N08-D, S12-N10-D, S11-N09-D, S13-N09-DData coverage ≥ 90%; relevance in the given SLA; We trace the source; recalculation gives a deviation ≤ 5%
S12-N09-KCoordination of the "Feedback" node in the contour of the environmental field: coordinate participants, restrictions and actions.frequency of feedback; correction rate; proportion of closed deviations; consistency indexuser feedback; audits; telemetry; control measurementsK = 0,40·A + 0,30·L + 0,30·RS12-N09-D, S12-N09-R, S12-N08-K, S12-N10-K, S11-N09-K, S13-N09-K≥ 80% key actors agreed; roles and solutions fixed; critical conflicts closed; resource gap ≤ 10%
S12-N09-RDevelopment of the feedback node in the contour of the ecological field: change the state and increase the potential.frequency of feedback; correction rate; the proportion of closed deviations; increase to the base lineuser feedback; audits; telemetry; control measurementsR = 0,40·G + 0,30·S + 0,30·VS12-N09-D, S12-N09-K, S12-N08-R, S12-N10-R, S11-N09-R, S13-N09-Rtarget effect confirmed by data; improvement against base line ≥ 10% or reach an approved threshold; the effect is stable ≥ 2 Measurement Cycles
S12-N10-DDiagnosis of the Risk node in the contour of the environmental field: measure the current state and deviations.probability of risk; extent of damage; residual risk; baselinerisk registers; incidents; insurance events; scenario modelsD = 0,40·C + 0,35·Q + 0,25·TS12-N10-K, S12-N10-R, S12-N09-D, S12-N11-D, S11-N10-D, S13-N10-DData coverage ≥ 90%; relevance in the given SLA; We trace the source; recalculation gives a deviation ≤ 5%
S12-N10-KCoordination of the Risk node in the contour of the environmental field: coordinate participants, restrictions and actions.probability of risk; extent of damage; residual risk; consistency indexrisk registers; incidents; insurance events; scenario modelsK = 0,40·A + 0,30·L + 0,30·RS12-N10-D, S12-N10-R, S12-N09-K, S12-N11-K, S11-N10-K, S13-N10-K≥ 80% key actors agreed; roles and solutions fixed; critical conflicts closed; resource gap ≤ 10%
S12-N10-RDevelopment of the Risk node in the contour of the ecological field: change the state and increase the potential.probability of risk; extent of damage; residual risk; increment to baselinerisk registers; incidents; insurance events; scenario modelsR = 0,40·G + 0,30·S + 0,30·VS12-N10-D, S12-N10-K, S12-N09-R, S12-N11-R, S11-N10-R, S13-N10-Rtarget effect confirmed by data; improvement against base line ≥ 10% or reach an approved threshold; the effect is stable ≥ 2 Measurement Cycles
S12-N11-DDiagnostics of the "Trust" node in the contour of the ecological field: measure the current state and deviations.trust index; share of confirmed commitments; stability of interactions; baselinehistory of obligations; ratings; contracts; trust surveysD = 0,40·C + 0,35·Q + 0,25·TS12-N11-K, S12-N11-R, S12-N10-D, S12-N12-D, S11-N11-D, S13-N11-DData coverage ≥ 90%; relevance in the given SLA; We trace the source; recalculation gives a deviation ≤ 5%
S12-N11-KCoordination of the "Trust" node in the contour of the environmental field: agree on participants, restrictions and actions.trust index; share of confirmed commitments; stability of interactions; consistency indexhistory of obligations; ratings; contracts; trust surveysK = 0,40·A + 0,30·L + 0,30·RS12-N11-D, S12-N11-R, S12-N10-K, S12-N12-K, S11-N11-K, S13-N11-K≥ 80% key actors agreed; roles and solutions fixed; critical conflicts closed; resource gap ≤ 10%
S12-N11-RThe development of the "Trust" node in the contour of the ecological field: to change the state and increase the potential.trust index; share of confirmed commitments; stability of interactions; increase to baselinehistory of obligations; ratings; contracts; trust surveysR = 0,40·G + 0,30·S + 0,30·VS12-N11-D, S12-N11-K, S12-N10-R, S12-N12-R, S11-N11-R, S13-N11-Rtarget effect confirmed by data; improvement against base line ≥ 10% or reach an approved threshold; the effect is stable ≥ 2 Measurement Cycles
S12-N12-DDiagnosis of the "Cooperation" node in the contour of the ecological field: measure the current state and deviations.number of active links; density of cooperation; share of joint projects; baselinegraph links; agreements; consortia; joint projectsD = 0,40·C + 0,35·Q + 0,25·TS12-N12-K, S12-N12-R, S12-N11-D, S12-N13-D, S11-N12-D, S13-N12-DData coverage ≥ 90%; relevance in the given SLA; We trace the source; recalculation gives a deviation ≤ 5%
S12-N12-KCoordination of the "Cooperation" node in the contour of the environmental field: agree on participants, restrictions and actions.number of active links; density of cooperation; proportion of joint projects; consistency indexgraph links; agreements; consortia; joint projectsK = 0,40·A + 0,30·L + 0,30·RS12-N12-D, S12-N12-R, S12-N11-K, S12-N13-K, S11-N12-K, S13-N12-K≥ 80% key actors agreed; roles and solutions fixed; critical conflicts closed; resource gap ≤ 10%
S12-N12-RDevelopment of the "Cooperation" node in the contour of the ecological field: change the state and increase the potential.number of active links; density of cooperation; share of joint projects; increase to the baselinegraph links; agreements; consortia; joint projectsR = 0,40·G + 0,30·S + 0,30·VS12-N12-D, S12-N12-K, S12-N11-R, S12-N13-R, S11-N12-R, S13-N12-Rtarget effect confirmed by data; improvement against base line ≥ 10% or reach an approved threshold; the effect is stable ≥ 2 Measurement Cycles
S12-N13-DDiagnostics of the "Infrastructure" node in the contour of the ecological field: measure the current state and deviations.infrastructure availability; reliability; capacity utilization; base lineGIS; object passports; dispatching; operational logsD = 0,40·C + 0,35·Q + 0,25·TS12-N13-K, S12-N13-R, S12-N12-D, S12-N14-D, S11-N13-D, S13-N13-DData coverage ≥ 90%; relevance in the given SLA; We trace the source; recalculation gives a deviation ≤ 5%
S12-N13-KCoordination of the "Infrastructure" node in the contour of the ecological field: coordinate participants, restrictions and actions.infrastructure availability; reliability; capacity utilization; consistency indexGIS; object passports; dispatching; operational logsK = 0,40·A + 0,30·L + 0,30·RS12-N13-D, S12-N13-R, S12-N12-K, S12-N14-K, S11-N13-K, S13-N13-K≥ 80% key actors agreed; roles and solutions fixed; critical conflicts closed; resource gap ≤ 10%
S12-N13-RDevelopment of the Infrastructure node in the contour of the ecological field: change the state and increase the potential.infrastructure availability; reliability; capacity utilization; increase to base lineGIS; object passports; dispatching; operational logsR = 0,40·G + 0,30·S + 0,30·VS12-N13-D, S12-N13-K, S12-N12-R, S12-N14-R, S11-N13-R, S13-N13-Rtarget effect confirmed by data; improvement against base line ≥ 10% or reach an approved threshold; the effect is stable ≥ 2 Measurement Cycles
S12-N14-DDiagnostics of the "Standard" node in the contour of the environmental field: measure the current state and deviations.standards coverage; compliance; number of deviations; baselinenormative documents; standards; checklists; audit resultsD = 0,40·C + 0,35·Q + 0,25·TS12-N14-K, S12-N14-R, S12-N13-D, S12-N15-D, S11-N14-D, S13-N14-DData coverage ≥ 90%; relevance in the given SLA; We trace the source; recalculation gives a deviation ≤ 5%
S12-N14-KCoordination of the "Standard" node in the contour of the environmental field: agree on participants, restrictions and actions.standards coverage; compliance; number of deviations; consistency indexnormative documents; standards; checklists; audit resultsK = 0,40·A + 0,30·L + 0,30·RS12-N14-D, S12-N14-R, S12-N13-K, S12-N15-K, S11-N14-K, S13-N14-K≥ 80% key actors agreed; roles and solutions fixed; critical conflicts closed; resource gap ≤ 10%
S12-N14-RDevelopment of the Standard node in the contour of the ecological field: change the state and increase the potential.coverage standards; compliance; number of deviations; increase to baselinenormative documents; standards; checklists; audit resultsR = 0,40·G + 0,30·S + 0,30·VS12-N14-D, S12-N14-K, S12-N13-R, S12-N15-R, S11-N14-R, S13-N14-Rtarget effect confirmed by data; improvement against base line ≥ 10% or reach an approved threshold; the effect is stable ≥ 2 Measurement Cycles
S12-N15-DDiagnosis of the "Finance" node in the contour of the environmental field: measure the current state and deviations.liquidity; resource cost; financial stability; baselineaccounting; budgets; treasury; banking and investment dataD = 0,40·C + 0,35·Q + 0,25·TS12-N15-K, S12-N15-R, S12-N14-D, S12-N16-D, S11-N15-D, S13-N15-DData coverage ≥ 90%; relevance in the given SLA; We trace the source; recalculation gives a deviation ≤ 5%
S12-N15-KCoordination of the "Finance" node in the contour of the environmental field: coordinate participants, restrictions and actions.liquidity; resource cost; financial stability; consistency indexaccounting; budgets; treasury; banking and investment dataK = 0,40·A + 0,30·L + 0,30·RS12-N15-D, S12-N15-R, S12-N14-K, S12-N16-K, S11-N15-K, S13-N15-K≥ 80% key actors agreed; roles and solutions fixed; critical conflicts closed; resource gap ≤ 10%
S12-N15-RDevelopment of the "Finance" node in the contour of the ecological field: change the state and increase the potential.liquidity; cost of resource; financial stability; growth to the baselineaccounting; budgets; treasury; banking and investment dataR = 0,40·G + 0,30·S + 0,30·VS12-N15-D, S12-N15-K, S12-N14-R, S12-N16-R, S11-N15-R, S13-N15-Rtarget effect confirmed by data; improvement against base line ≥ 10% or reach an approved threshold; the effect is stable ≥ 2 Measurement Cycles
S12-N16-DDiagnostics of the "Personnel" node in the contour of the environmental field: measure the current state and deviations.staffing; level of competence; fluidity/continuity; baselineHRIS; competence registers; training; certificationsD = 0,40·C + 0,35·Q + 0,25·TS12-N16-K, S12-N16-R, S12-N15-D, S12-N17-D, S11-N16-D, S13-N16-DData coverage ≥ 90%; relevance in the given SLA; We trace the source; recalculation gives a deviation ≤ 5%
S12-N16-KCoordination of the "Personnel" node in the contour of the environmental field: agree on participants, restrictions and actions.staff security; level of competence; fluidity/continuity; consistency indexHRIS; competence registers; training; certificationsK = 0,40·A + 0,30·L + 0,30·RS12-N16-D, S12-N16-R, S12-N15-K, S12-N17-K, S11-N16-K, S13-N16-K≥ 80% key actors agreed; roles and solutions fixed; critical conflicts closed; resource gap ≤ 10%
S12-N16-RDevelopment of the Personnel node in the contour of the ecological field: change the state and increase the potential.staffing; level of competence; fluidity/continuity; increment to baselineHRIS; competence registers; training; certificationsR = 0,40·G + 0,30·S + 0,30·VS12-N16-D, S12-N16-K, S12-N15-R, S12-N17-R, S11-N16-R, S13-N16-Rtarget effect confirmed by data; improvement against base line ≥ 10% or reach an approved threshold; the effect is stable ≥ 2 Measurement Cycles
S12-N17-DDiagnostics of the "Technology" node in the contour of the environmental field: measure the current state and deviations.technology readiness; technology efficiency; scalability; base lineTRL/MRL; patents; tests; digital models; technical cardsD = 0,40·C + 0,35·Q + 0,25·TS12-N17-K, S12-N17-R, S12-N16-D, S12-N18-D, S11-N17-D, S13-N17-DData coverage ≥ 90%; relevance in the given SLA; We trace the source; recalculation gives a deviation ≤ 5%
S12-N17-KCoordination of the "Technology" node in the contour of the environmental field: coordinate participants, restrictions and actions.technology readiness; technology efficiency; scalability; consistency indexTRL/MRL; patents; tests; digital models; technical cardsK = 0,40·A + 0,30·L + 0,30·RS12-N17-D, S12-N17-R, S12-N16-K, S12-N18-K, S11-N17-K, S13-N17-K≥ 80% key actors agreed; roles and solutions fixed; critical conflicts closed; resource gap ≤ 10%
S12-N17-RDevelopment of the "Technology" node in the contour of the ecological field: change the state and increase the potential.technology readiness; technology efficiency; scalability; growth to the baselineTRL/MRL; patents; tests; digital models; technical cardsR = 0,40·G + 0,30·S + 0,30·VS12-N17-D, S12-N17-K, S12-N16-R, S12-N18-R, S11-N17-R, S13-N17-Rtarget effect confirmed by data; improvement against base line ≥ 10% or reach an approved threshold; the effect is stable ≥ 2 Measurement Cycles
S12-N18-DDiagnosis of the node "Wednesday" in the contour of the environmental field: to measure the current state and deviations.environmental quality; load on the environment; recovery potential; baselineenvironmental monitoring; GIS; meteo; biocenose observationsD = 0,40·C + 0,35·Q + 0,25·TS12-N18-K, S12-N18-R, S12-N17-D, S12-N19-D, S11-N18-D, S13-N18-DData coverage ≥ 90%; relevance in the given SLA; We trace the source; recalculation gives a deviation ≤ 5%
S12-N18-KCoordination of the node "Environment" in the contour of the environmental field: to coordinate participants, restrictions and actions.quality of the environment; load on the environment; recovery potential; consistency indexenvironmental monitoring; GIS; meteo; biocenose observationsK = 0,40·A + 0,30·L + 0,30·RS12-N18-D, S12-N18-R, S12-N17-K, S12-N19-K, S11-N18-K, S13-N18-K≥ 80% key actors agreed; roles and solutions fixed; critical conflicts closed; resource gap ≤ 10%
S12-N18-RDevelopment of the “Environment” node in the contour of the ecological field: change the state and increase the potential.quality of the environment; load on the environment; recovery potential; increase to the baselineenvironmental monitoring; GIS; meteo; biocenose observationsR = 0,40·G + 0,30·S + 0,30·VS12-N18-D, S12-N18-K, S12-N17-R, S12-N19-R, S11-N18-R, S13-N18-Rtarget effect confirmed by data; improvement against base line ≥ 10% or reach an approved threshold; the effect is stable ≥ 2 Measurement Cycles
S12-N19-DDiagnostics of the node "Result" in the contour of the ecological field: measure the current state and deviations.result achievement; effect/costs; result stability; baselineKPI; effects statistics; acceptance acts; impact assessmentD = 0,40·C + 0,35·Q + 0,25·TS12-N19-K, S12-N19-R, S12-N18-D, S11-N19-D, S13-N19-DData coverage ≥ 90%; relevance in the given SLA; We trace the source; recalculation gives a deviation ≤ 5%
S12-N19-KCoordination of the node "Result" in the contour of the environmental field: to coordinate participants, restrictions and actions.achievement of result; effect/costs; sustainability of result; consistency indexKPI; effects statistics; acceptance acts; impact assessmentK = 0,40·A + 0,30·L + 0,30·RS12-N19-D, S12-N19-R, S12-N18-K, S11-N19-K, S13-N19-K≥ 80% key actors agreed; roles and solutions fixed; critical conflicts closed; resource gap ≤ 10%
S12-N19-RDevelopment of the node "Result" in the contour of the ecological field: change the state and increase the potential.result achievement; effect/costs; result stability; increase to baselineKPI; effects statistics; acceptance acts; impact assessmentR = 0,40·G + 0,30·S + 0,30·VS12-N19-D, S12-N19-K, S12-N18-R, S11-N19-R, S13-N19-Rtarget effect confirmed by data; improvement against base line ≥ 10% or reach an approved threshold; the effect is stable ≥ 2 Measurement Cycles

S13 · Security and integrity

Family function: Threats, protection, continuity and control of critical states. Modules: 57 (19 Node × 3 Status).

CodeFunctionIndicatorsDataFormulaConnectionsValidation criteria
S13-N01-DDiagnostics of the "Subject" node in the contour of the protective field: measure the current state and deviations.identification of subjects; completeness of roles; level of responsibility; baselineregisters of subjects; organizational structures; contracts; role profilesD = 0,40·C + 0,35·Q + 0,25·TS13-N01-K, S13-N01-R, S13-N02-D, S12-N01-D, S01-N01-DData coverage ≥ 90%; relevance in the given SLA; We trace the source; recalculation gives a deviation ≤ 5%
S13-N01-KCoordination of the node "Subject" in the contour of the protective field: coordinate participants, restrictions and actions.identification of subjects; completeness of roles; level of responsibility; consistency indexregisters of subjects; organizational structures; contracts; role profilesK = 0,40·A + 0,30·L + 0,30·RS13-N01-D, S13-N01-R, S13-N02-K, S12-N01-K, S01-N01-K≥ 80% key actors agreed; roles and solutions fixed; critical conflicts closed; resource gap ≤ 10%
S13-N01-RDevelopment of the subject node in the contour of the protective field: change the state and increase the potential.Identification of subjects; completeness of roles; level of responsibility; increase to the baselineregisters of subjects; organizational structures; contracts; role profilesR = 0,40·G + 0,30·S + 0,30·VS13-N01-D, S13-N01-K, S13-N02-R, S12-N01-R, S01-N01-Rtarget effect confirmed by data; improvement against base line ≥ 10% or reach an approved threshold; the effect is stable ≥ 2 Measurement Cycles
S13-N02-DDiagnostics of the Target node in the contour of the protective field: measure the current state and deviations.Measurability of objectives; consistency of objectives; proportion of objectives achieved; baselinestrategies; KPI; programs; decision protocolsD = 0,40·C + 0,35·Q + 0,25·TS13-N02-K, S13-N02-R, S13-N01-D, S13-N03-D, S12-N02-D, S01-N02-DData coverage ≥ 90%; relevance in the given SLA; We trace the source; recalculation gives a deviation ≤ 5%
S13-N02-KCoordination of the "Purpose" node in the contour of the protective field: coordinate participants, restrictions and actions.Measurability of objectives; Coherence of objectives; Percentage of objectives achieved; Coherence indexstrategies; KPI; programs; decision protocolsK = 0,40·A + 0,30·L + 0,30·RS13-N02-D, S13-N02-R, S13-N01-K, S13-N03-K, S12-N02-K, S01-N02-K≥ 80% key actors agreed; roles and solutions fixed; critical conflicts closed; resource gap ≤ 10%
S13-N02-RDevelopment of the Target node in the contour of the protective field: change the state and increase the potential.measurability of the goal; consistency of goals; proportion of goals achieved; increase to the baselinestrategies; KPI; programs; decision protocolsR = 0,40·G + 0,30·S + 0,30·VS13-N02-D, S13-N02-K, S13-N01-R, S13-N03-R, S12-N02-R, S01-N02-Rtarget effect confirmed by data; improvement against base line ≥ 10% or reach an approved threshold; the effect is stable ≥ 2 Measurement Cycles
S13-N03-DDiagnostics of the Border node in the contour of the protective field: measure the current state and deviations.clarity of boundaries; number of boundary conflicts; contour stability; baselinecontour maps; regulations; access rights; territorial dataD = 0,40·C + 0,35·Q + 0,25·TS13-N03-K, S13-N03-R, S13-N02-D, S13-N04-D, S12-N03-D, S01-N03-DData coverage ≥ 90%; relevance in the given SLA; We trace the source; recalculation gives a deviation ≤ 5%
S13-N03-KCoordination of the Border node in the contour of the protective field: coordinate participants, restrictions and actions.clarity of boundaries; number of boundary conflicts; stability of contour; consistency indexcontour maps; regulations; access rights; territorial dataK = 0,40·A + 0,30·L + 0,30·RS13-N03-D, S13-N03-R, S13-N02-K, S13-N04-K, S12-N03-K, S01-N03-K≥ 80% key actors agreed; roles and solutions fixed; critical conflicts closed; resource gap ≤ 10%
S13-N03-RDevelopment of the Border node in the contour of the protective field: change the state and increase the potential.clarity of borders; number of border conflicts; stability of the contour; increment to the baselinecontour maps; regulations; access rights; territorial dataR = 0,40·G + 0,30·S + 0,30·VS13-N03-D, S13-N03-K, S13-N02-R, S13-N04-R, S12-N03-R, S01-N03-Rtarget effect confirmed by data; improvement against base line ≥ 10% or reach an approved threshold; the effect is stable ≥ 2 Measurement Cycles
S13-N04-DDiagnostics of the Resource node in the contour of the protective field: measure the current state and deviations.resource availability; deficit/surplus; efficiency of use; baselinebalance of resources; warehouse/ERP; energy balance; capacityD = 0,40·C + 0,35·Q + 0,25·TS13-N04-K, S13-N04-R, S13-N03-D, S13-N05-D, S12-N04-D, S01-N04-DData coverage ≥ 90%; relevance in the given SLA; We trace the source; recalculation gives a deviation ≤ 5%
S13-N04-KCoordination of the Resource node in the contour of the protective field: coordinate participants, restrictions and actions.resource availability; deficit/surplus; efficiency of use; consistency indexbalance of resources; warehouse/ERP; energy balance; capacityK = 0,40·A + 0,30·L + 0,30·RS13-N04-D, S13-N04-R, S13-N03-K, S13-N05-K, S12-N04-K, S01-N04-K≥ 80% key actors agreed; roles and solutions fixed; critical conflicts closed; resource gap ≤ 10%
S13-N04-RDevelopment of the Resource node in the contour of the protective field: change the state and increase the potential.resource availability; deficit/surplus; efficiency of use; increase to the baselinebalance of resources; warehouse/ERP; energy balance; capacityR = 0,40·G + 0,30·S + 0,30·VS13-N04-D, S13-N04-K, S13-N03-R, S13-N05-R, S12-N04-R, S01-N04-Rtarget effect confirmed by data; improvement against base line ≥ 10% or reach an approved threshold; the effect is stable ≥ 2 Measurement Cycles
S13-N05-DDiagnostics of the Signal node in the contour of the protective field: measure the current state and deviations.reliability of signals; signal delay; fraction of false alarms; baselinesensors; event logs; appeals; media/network monitoringD = 0,40·C + 0,35·Q + 0,25·TS13-N05-K, S13-N05-R, S13-N04-D, S13-N06-D, S12-N05-D, S01-N05-DData coverage ≥ 90%; relevance in the given SLA; We trace the source; recalculation gives a deviation ≤ 5%
S13-N05-KCoordination of the node "Signal" in the contour of the protective field: coordinate participants, restrictions and actions.reliability of signals; signal delay; proportion of false alarms; consistency indexsensors; event logs; appeals; media/network monitoringK = 0,40·A + 0,30·L + 0,30·RS13-N05-D, S13-N05-R, S13-N04-K, S13-N06-K, S12-N05-K, S01-N05-K≥ 80% key actors agreed; roles and solutions fixed; critical conflicts closed; resource gap ≤ 10%
S13-N05-RDevelopment of the Signal node in the contour of the protective field: change the state and increase the potential.reliability of signals; signal delay; fraction of false alarms; increment to base linesensors; event logs; appeals; media/network monitoringR = 0,40·G + 0,30·S + 0,30·VS13-N05-D, S13-N05-K, S13-N04-R, S13-N06-R, S12-N05-R, S01-N05-Rtarget effect confirmed by data; improvement against base line ≥ 10% or reach an approved threshold; the effect is stable ≥ 2 Measurement Cycles
S13-N06-DDiagnosis of the Knowledge node in the contour of the protective field: measure the current state and deviations.completeness of knowledge; relevance of knowledge; level of evidence; baselineResearch; knowledge bases; publications; expertise; archivesD = 0,40·C + 0,35·Q + 0,25·TS13-N06-K, S13-N06-R, S13-N05-D, S13-N07-D, S12-N06-D, S01-N06-DData coverage ≥ 90%; relevance in the given SLA; We trace the source; recalculation gives a deviation ≤ 5%
S13-N06-KCoordination of the node "Knowledge" in the contour of the protective field: coordinate participants, restrictions and actions.completeness of knowledge; relevance of knowledge; level of evidence; consistency indexResearch; knowledge bases; publications; expertise; archivesK = 0,40·A + 0,30·L + 0,30·RS13-N06-D, S13-N06-R, S13-N05-K, S13-N07-K, S12-N06-K, S01-N06-K≥ 80% key actors agreed; roles and solutions fixed; critical conflicts closed; resource gap ≤ 10%
S13-N06-RDevelopment of the Knowledge node in the contour of the protective field: change the state and increase the potential.completeness of knowledge; relevance of knowledge; level of evidence; increase to the baselineResearch; knowledge bases; publications; expertise; archivesR = 0,40·G + 0,30·S + 0,30·VS13-N06-D, S13-N06-K, S13-N05-R, S13-N07-R, S12-N06-R, S01-N06-Rtarget effect confirmed by data; improvement against base line ≥ 10% or reach an approved threshold; the effect is stable ≥ 2 Measurement Cycles
S13-N07-DDiagnostics of the "Solution" node in the contour of the protective field: measure the current state and deviations.speed of decision; quality of decision; proportion of decisions executed; baselineEDMS; protocols; tasks; approval logsD = 0,40·C + 0,35·Q + 0,25·TS13-N07-K, S13-N07-R, S13-N06-D, S13-N08-D, S12-N07-D, S01-N07-DData coverage ≥ 90%; relevance in the given SLA; We trace the source; recalculation gives a deviation ≤ 5%
S13-N07-KCoordination of the node "Solution" in the contour of the protective field: to coordinate participants, restrictions and actions.speed of decision; quality of decision; proportion of decisions executed; consistency indexEDMS; protocols; tasks; approval logsK = 0,40·A + 0,30·L + 0,30·RS13-N07-D, S13-N07-R, S13-N06-K, S13-N08-K, S12-N07-K, S01-N07-K≥ 80% key actors agreed; roles and solutions fixed; critical conflicts closed; resource gap ≤ 10%
S13-N07-RDevelopment of the "Solution" node in the contour of the protective field: change the state and increase the potential.speed of decision; quality of decision; share of executed decisions; increase to the base lineEDMS; protocols; tasks; approval logsR = 0,40·G + 0,30·S + 0,30·VS13-N07-D, S13-N07-K, S13-N06-R, S13-N08-R, S12-N07-R, S01-N07-Rtarget effect confirmed by data; improvement against base line ≥ 10% or reach an approved threshold; the effect is stable ≥ 2 Measurement Cycles
S13-N08-DDiagnostics of the Action node in the contour of the protective field: measure the current state and deviations.intensity of actions; compliance with deadlines; effectiveness of actions; baselinework plans; trackers; production systems; execution actsD = 0,40·C + 0,35·Q + 0,25·TS13-N08-K, S13-N08-R, S13-N07-D, S13-N09-D, S12-N08-D, S01-N08-DData coverage ≥ 90%; relevance in the given SLA; We trace the source; recalculation gives a deviation ≤ 5%
S13-N08-KCoordination of the node "Action" in the contour of the protective field: coordinate participants, restrictions and actions.intensity of actions; compliance with deadlines; effectiveness of actions; consistency indexwork plans; trackers; production systems; execution actsK = 0,40·A + 0,30·L + 0,30·RS13-N08-D, S13-N08-R, S13-N07-K, S13-N09-K, S12-N08-K, S01-N08-K≥ 80% key actors agreed; roles and solutions fixed; critical conflicts closed; resource gap ≤ 10%
S13-N08-RDevelopment of the Action node in the contour of the protective field: change the state and increase the potential.intensity of actions; compliance with deadlines; effectiveness of actions; increase to the baselinework plans; trackers; production systems; execution actsR = 0,40·G + 0,30·S + 0,30·VS13-N08-D, S13-N08-K, S13-N07-R, S13-N09-R, S12-N08-R, S01-N08-Rtarget effect confirmed by data; improvement against base line ≥ 10% or reach an approved threshold; the effect is stable ≥ 2 Measurement Cycles
S13-N09-DDiagnosis of the "Feedback" node in the contour of the protective field: measure the current state and deviations.frequency of feedback; correction rate; the proportion of closed deviations; baselineuser feedback; audits; telemetry; control measurementsD = 0,40·C + 0,35·Q + 0,25·TS13-N09-K, S13-N09-R, S13-N08-D, S13-N10-D, S12-N09-D, S01-N09-DData coverage ≥ 90%; relevance in the given SLA; We trace the source; recalculation gives a deviation ≤ 5%
S13-N09-KCoordination of the "Feedback" node in the contour of the protective field: coordinate participants, restrictions and actions.frequency of feedback; correction rate; proportion of closed deviations; consistency indexuser feedback; audits; telemetry; control measurementsK = 0,40·A + 0,30·L + 0,30·RS13-N09-D, S13-N09-R, S13-N08-K, S13-N10-K, S12-N09-K, S01-N09-K≥ 80% key actors agreed; roles and solutions fixed; critical conflicts closed; resource gap ≤ 10%
S13-N09-RDevelopment of the feedback node in the contour of the protective field: change the state and increase the potential.frequency of feedback; correction rate; the proportion of closed deviations; increase to the base lineuser feedback; audits; telemetry; control measurementsR = 0,40·G + 0,30·S + 0,30·VS13-N09-D, S13-N09-K, S13-N08-R, S13-N10-R, S12-N09-R, S01-N09-Rtarget effect confirmed by data; improvement against base line ≥ 10% or reach an approved threshold; the effect is stable ≥ 2 Measurement Cycles
S13-N10-DDiagnosis of the Risk node in the contour of the protective field: measure the current state and deviations.probability of risk; extent of damage; residual risk; baselinerisk registers; incidents; insurance events; scenario modelsD = 0,40·C + 0,35·Q + 0,25·TS13-N10-K, S13-N10-R, S13-N09-D, S13-N11-D, S12-N10-D, S01-N10-DData coverage ≥ 90%; relevance in the given SLA; We trace the source; recalculation gives a deviation ≤ 5%
S13-N10-KCoordination of the node "Risk" in the contour of the protective field: coordinate participants, restrictions and actions.probability of risk; extent of damage; residual risk; consistency indexrisk registers; incidents; insurance events; scenario modelsK = 0,40·A + 0,30·L + 0,30·RS13-N10-D, S13-N10-R, S13-N09-K, S13-N11-K, S12-N10-K, S01-N10-K≥ 80% key actors agreed; roles and solutions fixed; critical conflicts closed; resource gap ≤ 10%
S13-N10-RDevelopment of the Risk node in the contour of the protective field: change the state and increase the potential.probability of risk; extent of damage; residual risk; increment to baselinerisk registers; incidents; insurance events; scenario modelsR = 0,40·G + 0,30·S + 0,30·VS13-N10-D, S13-N10-K, S13-N09-R, S13-N11-R, S12-N10-R, S01-N10-Rtarget effect confirmed by data; improvement against base line ≥ 10% or reach an approved threshold; the effect is stable ≥ 2 Measurement Cycles
S13-N11-DDiagnostics of the "Trust" node in the contour of the protective field: measure the current state and deviations.trust index; share of confirmed commitments; stability of interactions; baselinehistory of obligations; ratings; contracts; trust surveysD = 0,40·C + 0,35·Q + 0,25·TS13-N11-K, S13-N11-R, S13-N10-D, S13-N12-D, S12-N11-D, S01-N11-DData coverage ≥ 90%; relevance in the given SLA; We trace the source; recalculation gives a deviation ≤ 5%
S13-N11-KCoordination of the node "Trust" in the contour of the protective field: to coordinate participants, restrictions and actions.trust index; share of confirmed commitments; stability of interactions; consistency indexhistory of obligations; ratings; contracts; trust surveysK = 0,40·A + 0,30·L + 0,30·RS13-N11-D, S13-N11-R, S13-N10-K, S13-N12-K, S12-N11-K, S01-N11-K≥ 80% key actors agreed; roles and solutions fixed; critical conflicts closed; resource gap ≤ 10%
S13-N11-RDevelopment of the "Trust" node in the contour of the protective field: change the state and increase the potential.trust index; share of confirmed commitments; stability of interactions; increase to baselinehistory of obligations; ratings; contracts; trust surveysR = 0,40·G + 0,30·S + 0,30·VS13-N11-D, S13-N11-K, S13-N10-R, S13-N12-R, S12-N11-R, S01-N11-Rtarget effect confirmed by data; improvement against base line ≥ 10% or reach an approved threshold; the effect is stable ≥ 2 Measurement Cycles
S13-N12-DDiagnostics of the "Cooperation" node in the contour of the protective field: measure the current state and deviations.number of active links; density of cooperation; share of joint projects; baselinegraph links; agreements; consortia; joint projectsD = 0,40·C + 0,35·Q + 0,25·TS13-N12-K, S13-N12-R, S13-N11-D, S13-N13-D, S12-N12-D, S01-N12-DData coverage ≥ 90%; relevance in the given SLA; We trace the source; recalculation gives a deviation ≤ 5%
S13-N12-KCoordination of the "Cooperation" node in the contour of the protective field: coordinate participants, restrictions and actions.number of active links; density of cooperation; proportion of joint projects; consistency indexgraph links; agreements; consortia; joint projectsK = 0,40·A + 0,30·L + 0,30·RS13-N12-D, S13-N12-R, S13-N11-K, S13-N13-K, S12-N12-K, S01-N12-K≥ 80% key actors agreed; roles and solutions fixed; critical conflicts closed; resource gap ≤ 10%
S13-N12-RDevelopment of the "Cooperation" node in the contour of the protective field: change the state and increase the potential.number of active links; density of cooperation; share of joint projects; increase to the baselinegraph links; agreements; consortia; joint projectsR = 0,40·G + 0,30·S + 0,30·VS13-N12-D, S13-N12-K, S13-N11-R, S13-N13-R, S12-N12-R, S01-N12-Rtarget effect confirmed by data; improvement against base line ≥ 10% or reach an approved threshold; the effect is stable ≥ 2 Measurement Cycles
S13-N13-DDiagnostics of the Infrastructure node in the contour of the protective field: measure the current state and deviations.infrastructure availability; reliability; capacity utilization; base lineGIS; object passports; dispatching; operational logsD = 0,40·C + 0,35·Q + 0,25·TS13-N13-K, S13-N13-R, S13-N12-D, S13-N14-D, S12-N13-D, S01-N13-DData coverage ≥ 90%; relevance in the given SLA; We trace the source; recalculation gives a deviation ≤ 5%
S13-N13-KCoordination of the node "Infrastructure" in the contour of the protective field: coordinate participants, restrictions and actions.infrastructure availability; reliability; capacity utilization; consistency indexGIS; object passports; dispatching; operational logsK = 0,40·A + 0,30·L + 0,30·RS13-N13-D, S13-N13-R, S13-N12-K, S13-N14-K, S12-N13-K, S01-N13-K≥ 80% key actors agreed; roles and solutions fixed; critical conflicts closed; resource gap ≤ 10%
S13-N13-RDevelopment of the "Infrastructure" node in the contour of the protective field: change the state and increase the potential.infrastructure availability; reliability; capacity utilization; increase to base lineGIS; object passports; dispatching; operational logsR = 0,40·G + 0,30·S + 0,30·VS13-N13-D, S13-N13-K, S13-N12-R, S13-N14-R, S12-N13-R, S01-N13-Rtarget effect confirmed by data; improvement against base line ≥ 10% or reach an approved threshold; the effect is stable ≥ 2 Measurement Cycles
S13-N14-DDiagnostics of the "Standard" node in the contour of the protective field: measure the current state and deviations.standards coverage; compliance; number of deviations; baselinenormative documents; standards; checklists; audit resultsD = 0,40·C + 0,35·Q + 0,25·TS13-N14-K, S13-N14-R, S13-N13-D, S13-N15-D, S12-N14-D, S01-N14-DData coverage ≥ 90%; relevance in the given SLA; We trace the source; recalculation gives a deviation ≤ 5%
S13-N14-KCoordination of the node "Standard" in the contour of the protective field: coordinate participants, restrictions and actions.standards coverage; compliance; number of deviations; consistency indexnormative documents; standards; checklists; audit resultsK = 0,40·A + 0,30·L + 0,30·RS13-N14-D, S13-N14-R, S13-N13-K, S13-N15-K, S12-N14-K, S01-N14-K≥ 80% key actors agreed; roles and solutions fixed; critical conflicts closed; resource gap ≤ 10%
S13-N14-RDevelopment of the Standard node in the contour of the protective field: change the state and increase the potential.coverage standards; compliance; number of deviations; increase to baselinenormative documents; standards; checklists; audit resultsR = 0,40·G + 0,30·S + 0,30·VS13-N14-D, S13-N14-K, S13-N13-R, S13-N15-R, S12-N14-R, S01-N14-Rtarget effect confirmed by data; improvement against base line ≥ 10% or reach an approved threshold; the effect is stable ≥ 2 Measurement Cycles
S13-N15-DDiagnosis of the "Finance" node in the contour of the protective field: measure the current state and deviations.liquidity; resource cost; financial stability; baselineaccounting; budgets; treasury; banking and investment dataD = 0,40·C + 0,35·Q + 0,25·TS13-N15-K, S13-N15-R, S13-N14-D, S13-N16-D, S12-N15-D, S01-N15-DData coverage ≥ 90%; relevance in the given SLA; We trace the source; recalculation gives a deviation ≤ 5%
S13-N15-KCoordination of the "Finance" node in the contour of the protective field: coordinate participants, restrictions and actions.liquidity; resource cost; financial stability; consistency indexaccounting; budgets; treasury; banking and investment dataK = 0,40·A + 0,30·L + 0,30·RS13-N15-D, S13-N15-R, S13-N14-K, S13-N16-K, S12-N15-K, S01-N15-K≥ 80% key actors agreed; roles and solutions fixed; critical conflicts closed; resource gap ≤ 10%
S13-N15-RDevelopment of the "Finance" node in the contour of the protective field: change the state and increase the potential.liquidity; cost of resource; financial stability; growth to the baselineaccounting; budgets; treasury; banking and investment dataR = 0,40·G + 0,30·S + 0,30·VS13-N15-D, S13-N15-K, S13-N14-R, S13-N16-R, S12-N15-R, S01-N15-Rtarget effect confirmed by data; improvement against base line ≥ 10% or reach an approved threshold; the effect is stable ≥ 2 Measurement Cycles
S13-N16-DDiagnostics of the "Personnel" node in the contour of the protective field: measure the current state and deviations.staffing; level of competence; fluidity/continuity; baselineHRIS; competence registers; training; certificationsD = 0,40·C + 0,35·Q + 0,25·TS13-N16-K, S13-N16-R, S13-N15-D, S13-N17-D, S12-N16-D, S01-N16-DData coverage ≥ 90%; relevance in the given SLA; We trace the source; recalculation gives a deviation ≤ 5%
S13-N16-KCoordination of the "Personnel" node in the contour of the protective field: coordinate participants, restrictions and actions.staff security; level of competence; fluidity/continuity; consistency indexHRIS; competence registers; training; certificationsK = 0,40·A + 0,30·L + 0,30·RS13-N16-D, S13-N16-R, S13-N15-K, S13-N17-K, S12-N16-K, S01-N16-K≥ 80% key actors agreed; roles and solutions fixed; critical conflicts closed; resource gap ≤ 10%
S13-N16-RDevelopment of the "Personnel" node in the contour of the protective field: change the state and increase the potential.staffing; level of competence; fluidity/continuity; increment to baselineHRIS; competence registers; training; certificationsR = 0,40·G + 0,30·S + 0,30·VS13-N16-D, S13-N16-K, S13-N15-R, S13-N17-R, S12-N16-R, S01-N16-Rtarget effect confirmed by data; improvement against base line ≥ 10% or reach an approved threshold; the effect is stable ≥ 2 Measurement Cycles
S13-N17-DDiagnostics of the "Technology" node in the contour of the protective field: measure the current state and deviations.technology readiness; technology efficiency; scalability; base lineTRL/MRL; patents; tests; digital models; technical cardsD = 0,40·C + 0,35·Q + 0,25·TS13-N17-K, S13-N17-R, S13-N16-D, S13-N18-D, S12-N17-D, S01-N17-DData coverage ≥ 90%; relevance in the given SLA; We trace the source; recalculation gives a deviation ≤ 5%
S13-N17-KCoordination of the node "Technology" in the contour of the protective field: to coordinate participants, restrictions and actions.technology readiness; technology efficiency; scalability; consistency indexTRL/MRL; patents; tests; digital models; technical cardsK = 0,40·A + 0,30·L + 0,30·RS13-N17-D, S13-N17-R, S13-N16-K, S13-N18-K, S12-N17-K, S01-N17-K≥ 80% key actors agreed; roles and solutions fixed; critical conflicts closed; resource gap ≤ 10%
S13-N17-RDevelopment of the "Technology" node in the contour of the protective field: change the state and increase the potential.technology readiness; technology efficiency; scalability; growth to the baselineTRL/MRL; patents; tests; digital models; technical cardsR = 0,40·G + 0,30·S + 0,30·VS13-N17-D, S13-N17-K, S13-N16-R, S13-N18-R, S12-N17-R, S01-N17-Rtarget effect confirmed by data; improvement against base line ≥ 10% or reach an approved threshold; the effect is stable ≥ 2 Measurement Cycles
S13-N18-DDiagnosis of the "Wednesday" node in the contour of the protective field: measure the current state and deviations.environmental quality; load on the environment; recovery potential; baselineenvironmental monitoring; GIS; meteo; biocenose observationsD = 0,40·C + 0,35·Q + 0,25·TS13-N18-K, S13-N18-R, S13-N17-D, S13-N19-D, S12-N18-D, S01-N18-DData coverage ≥ 90%; relevance in the given SLA; We trace the source; recalculation gives a deviation ≤ 5%
S13-N18-KCoordination of the node "Wednesday" in the contour of the protective field: coordinate participants, restrictions and actions.quality of the environment; load on the environment; recovery potential; consistency indexenvironmental monitoring; GIS; meteo; biocenose observationsK = 0,40·A + 0,30·L + 0,30·RS13-N18-D, S13-N18-R, S13-N17-K, S13-N19-K, S12-N18-K, S01-N18-K≥ 80% key actors agreed; roles and solutions fixed; critical conflicts closed; resource gap ≤ 10%
S13-N18-RDevelopment of the node "Environment" in the contour of the protective field: change the state and increase the potential.quality of the environment; load on the environment; recovery potential; increase to the baselineenvironmental monitoring; GIS; meteo; biocenose observationsR = 0,40·G + 0,30·S + 0,30·VS13-N18-D, S13-N18-K, S13-N17-R, S13-N19-R, S12-N18-R, S01-N18-Rtarget effect confirmed by data; improvement against base line ≥ 10% or reach an approved threshold; the effect is stable ≥ 2 Measurement Cycles
S13-N19-DDiagnostics of the node "Result" in the contour of the protective field: measure the current state and deviations.result achievement; effect/costs; result stability; baselineKPI; effects statistics; acceptance acts; impact assessmentD = 0,40·C + 0,35·Q + 0,25·TS13-N19-K, S13-N19-R, S13-N18-D, S12-N19-D, S01-N19-DData coverage ≥ 90%; relevance in the given SLA; We trace the source; recalculation gives a deviation ≤ 5%
S13-N19-KCoordination of the node "Result" in the contour of the protective field: to coordinate participants, restrictions and actions.achievement of result; effect/costs; sustainability of result; consistency indexKPI; effects statistics; acceptance acts; impact assessmentK = 0,40·A + 0,30·L + 0,30·RS13-N19-D, S13-N19-R, S13-N18-K, S12-N19-K, S01-N19-K≥ 80% key actors agreed; roles and solutions fixed; critical conflicts closed; resource gap ≤ 10%
S13-N19-RDevelopment of the node "Result" in the contour of the protective field: change the state and increase the potential.result achievement; effect/costs; result stability; increase to baselineKPI; effects statistics; acceptance acts; impact assessmentR = 0,40·G + 0,30·S + 0,30·VS13-N19-D, S13-N19-K, S13-N18-R, S12-N19-R, S01-N19-Rtarget effect confirmed by data; improvement against base line ≥ 10% or reach an approved threshold; the effect is stable ≥ 2 Measurement Cycles

Methodology of operation of the registry

1. Attachment to object. A set of relevant modules is selected for each project/territory/organization. A module without a designated data owner is considered not to be activated.

2. Base line. The D-modules are calculated first. Their data form the initial state and the list of deviations.

3. Harmonization. K-modules record participants, rights, decisions, resources and conflicts. Without K-validation, the transition to development is considered managerially unprepared.

4. Development. R-modules measure change against the baseline, effect stability, and reproducibility.

5. Verification. Each indicator is assigned a source, owner, update date, calculation method and level of trust. Critical indicators require independent verification.

6. NEUROSVOD. Passport connections form a hypergraph: nodes - modules, edges - dependencies of data, decisions, resources and effects. This allows you to calculate the coherence and detect field breaks.

Source materials

Originals and versions of the document

  • Реестр_741_Полей_СОЮЗ-741.docxDOCX · main document
  • Реестр_741_Полей_СОЮЗ-741.pptxPPTX · related version

Other editions in web format

Each version is disclosed separately; the sequence of the source document is saved.

SOYUZ-741Register_741_Other Organiser741.pptx · Web Text

13 Family × 19 Node × 3 Status = 741 Module

Master Classifier · passport system · NEUROSVOD Union

Version 1.0 · 25 August 2026

Architecture SOYUZ-741

Strict decomposition of the number 741 into a controlled system of modules

13 families

19 knots

3 Status

Metapoles set the contour: management, meaning, time, resources, data, people, cooperation, sustainability, innovation, production, strategy, ecology, safety.

Single set of system nodes: subject → Objective → Border → resource → Signal → Knowledge → solution → Action → feedback → … → Result.

D - Diagnosis: Measure.

K - Coordination: agree.

R - Development: change and consolidate the effect.

13 × 19 × 3 = 741

Each module has a separate code and passport, but is associated with neighboring states, nodes and families.

Module Passport

Unified format makes the registry comparable and machine-readable

1. Code

2. Function

S05-N06-D

What it measures/coordinates/develops

3. Indicators

4. Data

3–4 Measurable Indicator

sources, owner, refresh rate

5. Formula

6. Contacts

Operating Index D/K/R

Neighbouring States, Nodes and Families

7. Validation

quality threshold and pass criterion

Three states of the field

Common logic of each node life cycle

D · Diagnostics

K · Coordination

R · Development

Task: to establish a baseline and deviations.

Index: D = 0,40·C + 0,35·Q + 0,25·T

C - completeness of coverage

Q - Quality/Credibility

T — relevance

Objective: To harmonize participants, constraints and resources.

Index: K = 0,40·A + 0,30·L + 0,30·R

A - Consistency

L - Connectivity

R - Resource security

The task: to change the state and consolidate the effect.

Index: R = 0,40·G + 0,30·S + 0,30·V

G - Increase

S - Sustainability

V - Reproduction

Formulas are project indexes. Their weights and thresholds are calibrated according to the empirical data of a specific application circuit.

S01 · Unity and Management

integrity, subjectivity and consistent management of · 57 modules

NodeDKRKey indicator
N01 · SubjectS01-N01-DS01-N01-KS01-N01-RRole / Responsibility
N02 · ObjectiveS01-N02-DS01-N02-KS01-N02-RMeasurability of Purpose
N03 · BorderS01-N03-DS01-N03-KS01-N03-RClarity of the outline
N04 · ResourceS01-N04-DS01-N04-KS01-N04-Rsecurity
N05 · SignalS01-N05-DS01-N05-KS01-N05-RSignal Reliability
N06 · KnowledgeS01-N06-DS01-N06-KS01-N06-RCompleteness of knowledge
N07 · DecisionS01-N07-DS01-N07-KS01-N07-RQuality of solution
N08 · ActionS01-N08-DS01-N08-KS01-N08-Reffectiveness
N09 · FeedbackS01-N09-DS01-N09-KS01-N09-Rcorrection speed
N10 · RiskS01-N10-DS01-N10-KS01-N10-Rresidual risk
N11 · TrustS01-N11-DS01-N11-KS01-N11-RConfidence Index
N12 · CooperationS01-N12-DS01-N12-KS01-N12-Rdensity of connections
N13 · InfrastructureS01-N13-DS01-N13-KS01-N13-Rreliability
N14 · StandardS01-N14-DS01-N14-KS01-N14-RConformity
N15 · FinanceS01-N15-DS01-N15-KS01-N15-RSustainability of Finance
N16 · PersonnelS01-N16-DS01-N16-KS01-N16-RCompetences
N17 · TechnologyS01-N17-DS01-N17-KS01-N17-Ravailability TRL/MRL
N18 · WednesdayS01-N18-DS01-N18-KS01-N18-RQuality of environment
N19 · ResultS01-N19-DS01-N19-KS01-N19-REffect / Cost

S02 · Meaning and Values

Targeting, Values, Identity and Public Meaning · 57 modules

NodeDKRKey indicator
N01 · SubjectS02-N01-DS02-N01-KS02-N01-RRole / Responsibility
N02 · ObjectiveS02-N02-DS02-N02-KS02-N02-RMeasurability of Purpose
N03 · BorderS02-N03-DS02-N03-KS02-N03-RClarity of the outline
N04 · ResourceS02-N04-DS02-N04-KS02-N04-Rsecurity
N05 · SignalS02-N05-DS02-N05-KS02-N05-RSignal Reliability
N06 · KnowledgeS02-N06-DS02-N06-KS02-N06-RCompleteness of knowledge
N07 · DecisionS02-N07-DS02-N07-KS02-N07-RQuality of solution
N08 · ActionS02-N08-DS02-N08-KS02-N08-Reffectiveness
N09 · FeedbackS02-N09-DS02-N09-KS02-N09-Rcorrection speed
N10 · RiskS02-N10-DS02-N10-KS02-N10-Rresidual risk
N11 · TrustS02-N11-DS02-N11-KS02-N11-RConfidence Index
N12 · CooperationS02-N12-DS02-N12-KS02-N12-Rdensity of connections
N13 · InfrastructureS02-N13-DS02-N13-KS02-N13-Rreliability
N14 · StandardS02-N14-DS02-N14-KS02-N14-RConformity
N15 · FinanceS02-N15-DS02-N15-KS02-N15-RSustainability of Finance
N16 · PersonnelS02-N16-DS02-N16-KS02-N16-RCompetences
N17 · TechnologyS02-N17-DS02-N17-KS02-N17-Ravailability TRL/MRL
N18 · WednesdayS02-N18-DS02-N18-KS02-N18-RQuality of environment
N19 · ResultS02-N19-DS02-N19-KS02-N19-REffect / Cost

S03 · Time and Cycles

rhythms, stages, terms, scenarios and cycles of development · 57 modules

NodeDKRKey indicator
N01 · SubjectS03-N01-DS03-N01-KS03-N01-RRole / Responsibility
N02 · ObjectiveS03-N02-DS03-N02-KS03-N02-RMeasurability of Purpose
N03 · BorderS03-N03-DS03-N03-KS03-N03-RClarity of the outline
N04 · ResourceS03-N04-DS03-N04-KS03-N04-Rsecurity
N05 · SignalS03-N05-DS03-N05-KS03-N05-RSignal Reliability
N06 · KnowledgeS03-N06-DS03-N06-KS03-N06-RCompleteness of knowledge
N07 · DecisionS03-N07-DS03-N07-KS03-N07-RQuality of solution
N08 · ActionS03-N08-DS03-N08-KS03-N08-Reffectiveness
N09 · FeedbackS03-N09-DS03-N09-KS03-N09-Rcorrection speed
N10 · RiskS03-N10-DS03-N10-KS03-N10-Rresidual risk
N11 · TrustS03-N11-DS03-N11-KS03-N11-RConfidence Index
N12 · CooperationS03-N12-DS03-N12-KS03-N12-Rdensity of connections
N13 · InfrastructureS03-N13-DS03-N13-KS03-N13-Rreliability
N14 · StandardS03-N14-DS03-N14-KS03-N14-RConformity
N15 · FinanceS03-N15-DS03-N15-KS03-N15-RSustainability of Finance
N16 · PersonnelS03-N16-DS03-N16-KS03-N16-RCompetences
N17 · TechnologyS03-N17-DS03-N17-KS03-N17-Ravailability TRL/MRL
N18 · WednesdayS03-N18-DS03-N18-KS03-N18-RQuality of environment
N19 · ResultS03-N19-DS03-N19-KS03-N19-REffect / Cost

S04 · Energy and resources

resource provision, energy and material flows · 57 modules

NodeDKRKey indicator
N01 · SubjectS04-N01-DS04-N01-KS04-N01-RRole / Responsibility
N02 · ObjectiveS04-N02-DS04-N02-KS04-N02-RMeasurability of Purpose
N03 · BorderS04-N03-DS04-N03-KS04-N03-RClarity of the outline
N04 · ResourceS04-N04-DS04-N04-KS04-N04-Rsecurity
N05 · SignalS04-N05-DS04-N05-KS04-N05-RSignal Reliability
N06 · KnowledgeS04-N06-DS04-N06-KS04-N06-RCompleteness of knowledge
N07 · DecisionS04-N07-DS04-N07-KS04-N07-RQuality of solution
N08 · ActionS04-N08-DS04-N08-KS04-N08-Reffectiveness
N09 · FeedbackS04-N09-DS04-N09-KS04-N09-Rcorrection speed
N10 · RiskS04-N10-DS04-N10-KS04-N10-Rresidual risk
N11 · TrustS04-N11-DS04-N11-KS04-N11-RConfidence Index
N12 · CooperationS04-N12-DS04-N12-KS04-N12-Rdensity of connections
N13 · InfrastructureS04-N13-DS04-N13-KS04-N13-Rreliability
N14 · StandardS04-N14-DS04-N14-KS04-N14-RConformity
N15 · FinanceS04-N15-DS04-N15-KS04-N15-RSustainability of Finance
N16 · PersonnelS04-N16-DS04-N16-KS04-N16-RCompetences
N17 · TechnologyS04-N17-DS04-N17-KS04-N17-Ravailability TRL/MRL
N18 · WednesdayS04-N18-DS04-N18-KS04-N18-RQuality of environment
N19 · ResultS04-N19-DS04-N19-KS04-N19-REffect / Cost

S05 · Information and data

data, knowledge, digital footprints and analytics · 57 modules

NodeDKRKey indicator
N01 · SubjectS05-N01-DS05-N01-KS05-N01-RRole / Responsibility
N02 · ObjectiveS05-N02-DS05-N02-KS05-N02-RMeasurability of Purpose
N03 · BorderS05-N03-DS05-N03-KS05-N03-RClarity of the outline
N04 · ResourceS05-N04-DS05-N04-KS05-N04-Rsecurity
N05 · SignalS05-N05-DS05-N05-KS05-N05-RSignal Reliability
N06 · KnowledgeS05-N06-DS05-N06-KS05-N06-RCompleteness of knowledge
N07 · DecisionS05-N07-DS05-N07-KS05-N07-RQuality of solution
N08 · ActionS05-N08-DS05-N08-KS05-N08-Reffectiveness
N09 · FeedbackS05-N09-DS05-N09-KS05-N09-Rcorrection speed
N10 · RiskS05-N10-DS05-N10-KS05-N10-Rresidual risk
N11 · TrustS05-N11-DS05-N11-KS05-N11-RConfidence Index
N12 · CooperationS05-N12-DS05-N12-KS05-N12-Rdensity of connections
N13 · InfrastructureS05-N13-DS05-N13-KS05-N13-Rreliability
N14 · StandardS05-N14-DS05-N14-KS05-N14-RConformity
N15 · FinanceS05-N15-DS05-N15-KS05-N15-RSustainability of Finance
N16 · PersonnelS05-N16-DS05-N16-KS05-N16-RCompetences
N17 · TechnologyS05-N17-DS05-N17-KS05-N17-Ravailability TRL/MRL
N18 · WednesdayS05-N18-DS05-N18-KS05-N18-RQuality of environment
N19 · ResultS05-N19-DS05-N19-KS05-N19-REffect / Cost

S06 · Man and Consciousness

human potential, competence, perception and training · 57 modules

NodeDKRKey indicator
N01 · SubjectS06-N01-DS06-N01-KS06-N01-RRole / Responsibility
N02 · ObjectiveS06-N02-DS06-N02-KS06-N02-RMeasurability of Purpose
N03 · BorderS06-N03-DS06-N03-KS06-N03-RClarity of the outline
N04 · ResourceS06-N04-DS06-N04-KS06-N04-Rsecurity
N05 · SignalS06-N05-DS06-N05-KS06-N05-RSignal Reliability
N06 · KnowledgeS06-N06-DS06-N06-KS06-N06-RCompleteness of knowledge
N07 · DecisionS06-N07-DS06-N07-KS06-N07-RQuality of solution
N08 · ActionS06-N08-DS06-N08-KS06-N08-Reffectiveness
N09 · FeedbackS06-N09-DS06-N09-KS06-N09-Rcorrection speed
N10 · RiskS06-N10-DS06-N10-KS06-N10-Rresidual risk
N11 · TrustS06-N11-DS06-N11-KS06-N11-RConfidence Index
N12 · CooperationS06-N12-DS06-N12-KS06-N12-Rdensity of connections
N13 · InfrastructureS06-N13-DS06-N13-KS06-N13-Rreliability
N14 · StandardS06-N14-DS06-N14-KS06-N14-RConformity
N15 · FinanceS06-N15-DS06-N15-KS06-N15-RSustainability of Finance
N16 · PersonnelS06-N16-DS06-N16-KS06-N16-RCompetences
N17 · TechnologyS06-N17-DS06-N17-KS06-N17-Ravailability TRL/MRL
N18 · WednesdayS06-N18-DS06-N18-KS06-N18-RQuality of environment
N19 · ResultS06-N19-DS06-N19-KS06-N19-REffect / Cost

S07 · Cooperation and Networks

Connectivity of subjects, trust, contracts and network interaction · 57 modules

NodeDKRKey indicator
N01 · SubjectS07-N01-DS07-N01-KS07-N01-RRole / Responsibility
N02 · ObjectiveS07-N02-DS07-N02-KS07-N02-RMeasurability of Purpose
N03 · BorderS07-N03-DS07-N03-KS07-N03-RClarity of the outline
N04 · ResourceS07-N04-DS07-N04-KS07-N04-Rsecurity
N05 · SignalS07-N05-DS07-N05-KS07-N05-RSignal Reliability
N06 · KnowledgeS07-N06-DS07-N06-KS07-N06-RCompleteness of knowledge
N07 · DecisionS07-N07-DS07-N07-KS07-N07-RQuality of solution
N08 · ActionS07-N08-DS07-N08-KS07-N08-Reffectiveness
N09 · FeedbackS07-N09-DS07-N09-KS07-N09-Rcorrection speed
N10 · RiskS07-N10-DS07-N10-KS07-N10-Rresidual risk
N11 · TrustS07-N11-DS07-N11-KS07-N11-RConfidence Index
N12 · CooperationS07-N12-DS07-N12-KS07-N12-Rdensity of connections
N13 · InfrastructureS07-N13-DS07-N13-KS07-N13-Rreliability
N14 · StandardS07-N14-DS07-N14-KS07-N14-RConformity
N15 · FinanceS07-N15-DS07-N15-KS07-N15-RSustainability of Finance
N16 · PersonnelS07-N16-DS07-N16-KS07-N16-RCompetences
N17 · TechnologyS07-N17-DS07-N17-KS07-N17-Ravailability TRL/MRL
N18 · WednesdayS07-N18-DS07-N18-KS07-N18-RQuality of environment
N19 · ResultS07-N19-DS07-N19-KS07-N19-REffect / Cost

S08 · Balance and sustainability

Balance, stability, adaptation and recovery · 57 modules

NodeDKRKey indicator
N01 · SubjectS08-N01-DS08-N01-KS08-N01-RRole / Responsibility
N02 · ObjectiveS08-N02-DS08-N02-KS08-N02-RMeasurability of Purpose
N03 · BorderS08-N03-DS08-N03-KS08-N03-RClarity of the outline
N04 · ResourceS08-N04-DS08-N04-KS08-N04-Rsecurity
N05 · SignalS08-N05-DS08-N05-KS08-N05-RSignal Reliability
N06 · KnowledgeS08-N06-DS08-N06-KS08-N06-RCompleteness of knowledge
N07 · DecisionS08-N07-DS08-N07-KS08-N07-RQuality of solution
N08 · ActionS08-N08-DS08-N08-KS08-N08-Reffectiveness
N09 · FeedbackS08-N09-DS08-N09-KS08-N09-Rcorrection speed
N10 · RiskS08-N10-DS08-N10-KS08-N10-Rresidual risk
N11 · TrustS08-N11-DS08-N11-KS08-N11-RConfidence Index
N12 · CooperationS08-N12-DS08-N12-KS08-N12-Rdensity of connections
N13 · InfrastructureS08-N13-DS08-N13-KS08-N13-Rreliability
N14 · StandardS08-N14-DS08-N14-KS08-N14-RConformity
N15 · FinanceS08-N15-DS08-N15-KS08-N15-RSustainability of Finance
N16 · PersonnelS08-N16-DS08-N16-KS08-N16-RCompetences
N17 · TechnologyS08-N17-DS08-N17-KS08-N17-Ravailability TRL/MRL
N18 · WednesdayS08-N18-DS08-N18-KS08-N18-RQuality of environment
N19 · ResultS08-N19-DS08-N19-KS08-N19-REffect / Cost

S09 · Evolution and innovation

updating, experiments, R&D and scaling · 57 modules

NodeDKRKey indicator
N01 · SubjectS09-N01-DS09-N01-KS09-N01-RRole / Responsibility
N02 · ObjectiveS09-N02-DS09-N02-KS09-N02-RMeasurability of Purpose
N03 · BorderS09-N03-DS09-N03-KS09-N03-RClarity of the outline
N04 · ResourceS09-N04-DS09-N04-KS09-N04-Rsecurity
N05 · SignalS09-N05-DS09-N05-KS09-N05-RSignal Reliability
N06 · KnowledgeS09-N06-DS09-N06-KS09-N06-RCompleteness of knowledge
N07 · DecisionS09-N07-DS09-N07-KS09-N07-RQuality of solution
N08 · ActionS09-N08-DS09-N08-KS09-N08-Reffectiveness
N09 · FeedbackS09-N09-DS09-N09-KS09-N09-Rcorrection speed
N10 · RiskS09-N10-DS09-N10-KS09-N10-Rresidual risk
N11 · TrustS09-N11-DS09-N11-KS09-N11-RConfidence Index
N12 · CooperationS09-N12-DS09-N12-KS09-N12-Rdensity of connections
N13 · InfrastructureS09-N13-DS09-N13-KS09-N13-Rreliability
N14 · StandardS09-N14-DS09-N14-KS09-N14-RConformity
N15 · FinanceS09-N15-DS09-N15-KS09-N15-RSustainability of Finance
N16 · PersonnelS09-N16-DS09-N16-KS09-N16-RCompetences
N17 · TechnologyS09-N17-DS09-N17-KS09-N17-Ravailability TRL/MRL
N18 · WednesdayS09-N18-DS09-N18-KS09-N18-RQuality of environment
N19 · ResultS09-N19-DS09-N19-KS09-N19-REffect / Cost

S10 · Creation and production

value creation, production, services and infrastructure execution · 57 modules

NodeDKRKey indicator
N01 · SubjectS10-N01-DS10-N01-KS10-N01-RRole / Responsibility
N02 · ObjectiveS10-N02-DS10-N02-KS10-N02-RMeasurability of Purpose
N03 · BorderS10-N03-DS10-N03-KS10-N03-RClarity of the outline
N04 · ResourceS10-N04-DS10-N04-KS10-N04-Rsecurity
N05 · SignalS10-N05-DS10-N05-KS10-N05-RSignal Reliability
N06 · KnowledgeS10-N06-DS10-N06-KS10-N06-RCompleteness of knowledge
N07 · DecisionS10-N07-DS10-N07-KS10-N07-RQuality of solution
N08 · ActionS10-N08-DS10-N08-KS10-N08-Reffectiveness
N09 · FeedbackS10-N09-DS10-N09-KS10-N09-Rcorrection speed
N10 · RiskS10-N10-DS10-N10-KS10-N10-Rresidual risk
N11 · TrustS10-N11-DS10-N11-KS10-N11-RConfidence Index
N12 · CooperationS10-N12-DS10-N12-KS10-N12-Rdensity of connections
N13 · InfrastructureS10-N13-DS10-N13-KS10-N13-Rreliability
N14 · StandardS10-N14-DS10-N14-KS10-N14-RConformity
N15 · FinanceS10-N15-DS10-N15-KS10-N15-RSustainability of Finance
N16 · PersonnelS10-N16-DS10-N16-KS10-N16-RCompetences
N17 · TechnologyS10-N17-DS10-N17-KS10-N17-Ravailability TRL/MRL
N18 · WednesdayS10-N18-DS10-N18-KS10-N18-RQuality of environment
N19 · ResultS10-N19-DS10-N19-KS10-N19-REffect / Cost

S11 · Navigation and strategy

priorities, routes, portfolios and strategic choice · 57 modules

NodeDKRKey indicator
N01 · SubjectS11-N01-DS11-N01-KS11-N01-RRole / Responsibility
N02 · ObjectiveS11-N02-DS11-N02-KS11-N02-RMeasurability of Purpose
N03 · BorderS11-N03-DS11-N03-KS11-N03-RClarity of the outline
N04 · ResourceS11-N04-DS11-N04-KS11-N04-Rsecurity
N05 · SignalS11-N05-DS11-N05-KS11-N05-RSignal Reliability
N06 · KnowledgeS11-N06-DS11-N06-KS11-N06-RCompleteness of knowledge
N07 · DecisionS11-N07-DS11-N07-KS11-N07-RQuality of solution
N08 · ActionS11-N08-DS11-N08-KS11-N08-Reffectiveness
N09 · FeedbackS11-N09-DS11-N09-KS11-N09-Rcorrection speed
N10 · RiskS11-N10-DS11-N10-KS11-N10-Rresidual risk
N11 · TrustS11-N11-DS11-N11-KS11-N11-RConfidence Index
N12 · CooperationS11-N12-DS11-N12-KS11-N12-Rdensity of connections
N13 · InfrastructureS11-N13-DS11-N13-KS11-N13-Rreliability
N14 · StandardS11-N14-DS11-N14-KS11-N14-RConformity
N15 · FinanceS11-N15-DS11-N15-KS11-N15-RSustainability of Finance
N16 · PersonnelS11-N16-DS11-N16-KS11-N16-RCompetences
N17 · TechnologyS11-N17-DS11-N17-KS11-N17-Ravailability TRL/MRL
N18 · WednesdayS11-N18-DS11-N18-KS11-N18-RQuality of environment
N19 · ResultS11-N19-DS11-N19-KS11-N19-REffect / Cost

S12 · Life and Ecology

biocenoses, environment, ecosystem health and natural reproducibility · 57 modules

NodeDKRKey indicator
N01 · SubjectS12-N01-DS12-N01-KS12-N01-RRole / Responsibility
N02 · ObjectiveS12-N02-DS12-N02-KS12-N02-RMeasurability of Purpose
N03 · BorderS12-N03-DS12-N03-KS12-N03-RClarity of the outline
N04 · ResourceS12-N04-DS12-N04-KS12-N04-Rsecurity
N05 · SignalS12-N05-DS12-N05-KS12-N05-RSignal Reliability
N06 · KnowledgeS12-N06-DS12-N06-KS12-N06-RCompleteness of knowledge
N07 · DecisionS12-N07-DS12-N07-KS12-N07-RQuality of solution
N08 · ActionS12-N08-DS12-N08-KS12-N08-Reffectiveness
N09 · FeedbackS12-N09-DS12-N09-KS12-N09-Rcorrection speed
N10 · RiskS12-N10-DS12-N10-KS12-N10-Rresidual risk
N11 · TrustS12-N11-DS12-N11-KS12-N11-RConfidence Index
N12 · CooperationS12-N12-DS12-N12-KS12-N12-Rdensity of connections
N13 · InfrastructureS12-N13-DS12-N13-KS12-N13-Rreliability
N14 · StandardS12-N14-DS12-N14-KS12-N14-RConformity
N15 · FinanceS12-N15-DS12-N15-KS12-N15-RSustainability of Finance
N16 · PersonnelS12-N16-DS12-N16-KS12-N16-RCompetences
N17 · TechnologyS12-N17-DS12-N17-KS12-N17-Ravailability TRL/MRL
N18 · WednesdayS12-N18-DS12-N18-KS12-N18-RQuality of environment
N19 · ResultS12-N19-DS12-N19-KS12-N19-REffect / Cost

S13 · Security and integrity

Threats, protection, continuity and control of critical states · 57 modules

NodeDKRKey indicator
N01 · SubjectS13-N01-DS13-N01-KS13-N01-RRole / Responsibility
N02 · ObjectiveS13-N02-DS13-N02-KS13-N02-RMeasurability of Purpose
N03 · BorderS13-N03-DS13-N03-KS13-N03-RClarity of the outline
N04 · ResourceS13-N04-DS13-N04-KS13-N04-Rsecurity
N05 · SignalS13-N05-DS13-N05-KS13-N05-RSignal Reliability
N06 · KnowledgeS13-N06-DS13-N06-KS13-N06-RCompleteness of knowledge
N07 · DecisionS13-N07-DS13-N07-KS13-N07-RQuality of solution
N08 · ActionS13-N08-DS13-N08-KS13-N08-Reffectiveness
N09 · FeedbackS13-N09-DS13-N09-KS13-N09-Rcorrection speed
N10 · RiskS13-N10-DS13-N10-KS13-N10-Rresidual risk
N11 · TrustS13-N11-DS13-N11-KS13-N11-RConfidence Index
N12 · CooperationS13-N12-DS13-N12-KS13-N12-Rdensity of connections
N13 · InfrastructureS13-N13-DS13-N13-KS13-N13-Rreliability
N14 · StandardS13-N14-DS13-N14-KS13-N14-RConformity
N15 · FinanceS13-N15-DS13-N15-KS13-N15-RSustainability of Finance
N16 · PersonnelS13-N16-DS13-N16-KS13-N16-RCompetences
N17 · TechnologyS13-N17-DS13-N17-KS13-N17-Ravailability TRL/MRL
N18 · WednesdayS13-N18-DS13-N18-KS13-N18-RQuality of environment
N19 · ResultS13-N19-DS13-N19-KS13-N19-REffect / Cost

Validation criteria

The module is considered working only after passing the control threshold

D · Data control

K · Harmonization control

R · Effect control

• Data coverage ≥ 90%

• relevance in specified SLA

• source traceable

• Re-calculation: rejection ≤ 5%

• ≥ 80% The key stakeholders agreed

• roles and solutions fixed

• Critical conflicts closed

• Resource gap ≤ 10%

• effect confirmed by data

• improvement ≥ 10% or reach the threshold

• Sustainability ≥ 2 Measurement Cycles

• scaling reproducible

NEUROSVOD: Register as a hypergraph

Passport is not a card in the archive, but an active node of the network of dependencies

S05-N06-D

Knowledge · Diagnosis

Neighborhood Node

Related Family

Data

Effect

Procedure for implementation

From the classifier to the working control circuit

01 · Outline Selection

02 · Activation D

03 · Passing K

territory / project / organization

Data sources and baseline

owners, roles, decisions, resources

04 · Run R

05 · Hypergraph

06 · Scaling

change of state and effect control

automatic analysis of connectivity and breaks

Replication of confirmed modules

741

Result

SOYUZ-741 turns Field Theory into a verifiable system of description, management and development

Modular Passports

the Field Families

Mandatory Passport Fields

Next Level: Digital Registry + graph links + API NEUROSVOD + Linking to real data and indicator owners.