Home / Knowledge / MAP OF VALIDATION

EQUILIBRIUM

VALIDATION MAP

Unified system of checking ideas, projects, technologies, resources and solutions

Schematic verification matrix and route from idea to confirmed result.
Editorial visualization of the concept; not technical drawing.

Brief annotation

About the document

Unified system of checking ideas, projects, technologies, resources and solutions

It turns subjective assessment into a manageable admission procedure.

Presentation

Karta_validatsii_SK42_EQUILIBRIUM.pptx

Page — from —
Width

Downloading the document...

For viewing prepared PDF-copy of the presentation. PowerPoint animations and transitions are not played.

Scroll through the pages and change the scale on the viewbar.

Version 1.0 • 22 August 2026

1. Summary

The validation map is a single decision-making mechanism in the EQUILIBRIUM system. It transforms a subjective assessment of a “good idea/bad idea” into a consistent procedure based on criteria, evidence, scoring, expert judgment, and measurable outcome.

  • Object of validation: idea, project, technology, product, participant, organization, financial instrument, environmental solution, program or other element of the system.
  • Result: decision on admission, refinement, piloting, scaling or deviation.
  • Base: 13 Fundamental principles × 20 Verification Directions = 260 Test Cells.
  • Scale: Each cell is rated from 0 to 3 points; maximum - 780 points.
  • The key principle: it is not the declaration that is validated, but the proven ability to create a positive social, environmental, technological and economic result.

2. Three layers of validation

Layer I. Value-sense

Checks why a solution exists, whom it serves, whether it disrupts the balance and whether it conforms to the basic architecture of EQUILIBRIUM.

Layer II. Probative-project

Verifies the facts: problem, technology, law, economics, team, risk, resources, metrics, evidence and feasibility.

Layer III. Effective

Verifies the actual effect of the pilot, the sustainability of the result, repeatability, scalability and long-term legacy.

3. Thirteen reasons

BasisContents
1. MeaningClarity of mission, public need and reasons for the existence of a solution.
2. UsePractical value and measurable positive effect.
3. ManRespect for human dignity, security, opportunity and development.
4. SocietyContribution to community sustainability, solidarity and the public good.
5. NaturePreservation and restoration of natural balance, biocenoses and resources.
6. FairnessNon-discriminatory access, reasonable distribution of benefits and risks.
7. CooperationAbility to unite participants and form mutually beneficial ties.
8. CreationProducing new value instead of carrying or masking damage.
9. ResponsibilityThe presence of the owner of the result, obligations and correction mechanisms.
10. TransparencyVerifiability of data, decisions, financial flows and methodologies.
11. SustainabilityViability over time, resource and institutional sustainability.
12. DevelopmentAbility to improve quality, competence, technological level and scale of effect.
13. HarmonyHarmonization of the interests of man, society, economy, state and nature.

4. Twenty verification directions

1. Purpose. Is there a specific desired result and a criterion for achieving it?

2. Problem. Is the problem supported by data and is there a causal link?

3. User. Is the person directly using the solution determined?

4. Beneficiary. Is it clear who gets the final effect and in what form?

5. Resources. Are people, technology, data, infrastructure, and time enough?

6. Risks. Are key risks identified and management measures included?

7. Effect. Is the expected social, environmental and economic impact formulated?

8. Metrics. Is there a measurable KPI baseline and calculation method?

9. Ethics. Are the principles of good faith, dignity and non-injury respected?

10. Right. Does the decision comply with applicable law and regulatory requirements?

11. Economy. Is the project economy tested: costs, revenues, benefits, sustainability?

12. Technology. Are technical feasibility, maturity and safety confirmed?

13. Management. Are roles, powers, controls and responsibilities defined?

14. Communication. Is there a clear contour of interaction with participants and society?

15. Scaling. Is it possible to replicate the solution in another region, industry or scale?

16. Partners. Are the necessary partners and their contributions confirmed?

17. Funding. Is there a realistic funding model and sources of capital?

18. The social result. How do quality of life, employment, safety, accessibility and trust change?

19. Environmental result. How do emissions, resources, biodiversity, soils, water, air, and ecosystems change?

20. A long-term legacy. What will happen after the funding or the pilot is completed?

5. Matrix 13 × 20

Each object undergoes 260 checks: for each of 13 bases all 20 directions are considered. This allows us to see not only the overall attractiveness of the project, but also its “failures” — for example, a strong technology with a weak legal model or a high environmental effect in the absence of sustainable financing.

6. Scale of assessment

BallCell StatusInterpretation
0Does not matchThe criterion has not been met, there is no evidence or an unacceptable contradiction has been identified.
1Requires revisionThere is partial compliance, but the evidence or mechanisms are insufficient.
2ConformsThe criterion is met and supported by sufficient evidence.
3Strength SideThe criterion is not just fulfilled, but creates a significant advantage and can be a benchmark.

7. Final levels of admission

PointsLevelDecision
0–260The Red ZoneNot ready to launch. Concept reassembly or rejection is required.
261–520The Orange ZoneProspective, but requires significant revision and re-examination.
521–650The Yellow ZoneAllowed to a limited pilot if there is a risk management plan.
651–730The Green ZoneStrong project. Allowed to scale after confirmation of the pilot.
731–780Reference EQUILIBRIUMHigh level of evidence, maturity and systemic effect.

8. Critical Stop Factors

A high total score does not compensate for critical violations. An object cannot be validated if at least one stop factor is installed:

  • illegality of the key mechanism or impossibility of legal execution;
  • unacceptable risk to life, health or safety;
  • falsification of data, results or origin of assets;
  • absence of a real owner of responsibility;
  • significant environmental damage without compensatory or restorative mechanisms;
  • Unresolved conflict of interest that hides significant risks
  • inability to confirm the origin of key evidence;
  • An economic model based solely on the transfer of damage to third parties or future generations.

9. Hierarchy of evidence

Evaluation is assigned not by presentation, but by the strength of the evidence. Priority of evidence:

  • A. Primary confirmations: measurements, tests, registers, contracts, accounting data, protocols, technical journals.
  • B. Independent verification: accredited laboratory, audit, examination, certification, external validator.
  • C. Confirmed pilot: working object, operational statistics, user data and monitoring.
  • D. Comparable cases: proven results of similar decisions under comparable conditions.
  • E. Expert opinion: a qualified opinion with the disclosed methodology and assumptions.
  • F. Applicant’s declaration: used as background information, but is not sufficient evidence in itself.

10. Validation procedure

Step 1. Registration

The object receives the ID, owner, version and a brief passport.

Step 2. Prescreening

The basic completeness, conflict of interest, stop factors and applicability of criteria are checked.

Step 3. Documentary verification

A register of evidence for 260 cells is being formed.

Step 4. Expert assessment

Profile experts put out points and fix the grounds.

Step 5. Risk Committee

Critical risks are assessed separately from the average score.

Step 6. Pilot

If required, a limited test is carried out with pre-approved metrics.

Step 7. Verification of the result

Baseline, planned KPI and actual effect are compared.

Step 8. Decision

Issued status: accept / accept with conditions / pilot / reassembly / reject.

Step 9. Roster

The result is entered in the register of validated solutions EQUILIBRIUM.

Step 10. Revalidation

With significant changes, new data, or a set cycle, the object is retested.

11. Roles and responsibilities

RoleResponsibility
ApplicantProvides data, evidence, discloses risks and is responsible for the reliability of the original information.
Validation CoordinatorOrganizes the procedure, completeness and routing by experts.
Profile expertEvaluates the subject area and fixes a reasoned conclusion.
Independent ValidatorConfirms the critical indicators and the absence of significant distortions.
Risk CommitteeConsiders stop factors, damage scenarios and admission conditions.
Validation BoardMakes the final decision on controversial, large and systemic objects.
Registry ownerProvides versioning, data security, decision history and revalidation.

12. Validation decision passport

Object ID
Name
Object type
Applicant / Owner
Date and version
Goal
Key beneficiaries
Total score / 780
Level of admission
Critical risks
Stop factors
Conditions of admission
Duration of detention
Date of revalidation
Responsible Validator
Decision of the Validation Board

13. Working Card 13 × 20

In the working version, each cell contains: a score of 0–3, a link to the proof, an expert comment and, if necessary, a corrective action.

Basis1234567891011121314151617181920Σ
Meaning
Use
Person
Society
Nature
Fairness
Cooperation
Creation
Responsibility
Transparency
Resilience
Development
Harmony

Number of directions: 1 Objective; 2 Problem; 3 User; 4 Beneficiary; 5 Resources; 6 Risks; 7 Effect; 8 Metrics; 9 Ethics; 10 Law; 11 Economy; 12 Technology; 13 Management; 14 Communication; 15 Scaling; 16 Partners; 17 Financing; 18 Social result; 19 Environmental result; 20 Long-term heritage.

14. Communication with architecture EQUILIBRIUM

The validation map should be used as a universal gateway between the initiative and system resources. It can be used in SFERA For the selection of initiatives, in ECO-PPA for evidence of environmental projects, in SPECZASHCHITA for the admission of performers and technologies, as well as EQUILIBRIUM as part of the unified register of decisions and monitoring of the result.

15. Principle of immutability

Neither the applicant’s credibility, nor the amount of investment, nor political or institutional significance should replace the evidence. The greater the scale and potential systemic effect of the solution, the higher the requirements for independent verification, data transparency and risk control.

16. Final solution standard

Validated is considered to be an object that simultaneously:

  • has no critical stop factors;
  • scored an adequate score for the appropriate level of admission;
  • has confirmed evidence on key criteria;
  • has a responsibility owner and an understandable management model;
  • demonstrates measurable results or has a correct piloting plan;
  • has a certain period of validity of imprisonment and a mechanism of revalidation.

Validation card EQUILIBRIUM

"From idea to proven result"

Source materials

Originals and versions of the document

Other editions in web format

Each version is disclosed separately; the sequence of the source document is saved.

VALIDATION MAPKarta_validatsii_SK42_EQUILIBRIUM.pptx · web text

Unified system of checking ideas, projects, technologies, resources and solutions

13 × 20 = 260 Checks

From idea to proven result

Version 1.0 • 22 August 2026

Why you need a validation card

It turns subjective assessment into a manageable admission procedure.

Uniform criteria

The same logic of assessment for initiatives, technologies, participants and financial instruments.

Evidence

Points are awarded only if there are confirmations and traceable sources.

Risk management

Critical stop factors are checked separately and are not masked by an average score.

Scaling

Validated object gets clear route: revision → Pilot → Scaling.

Three layers of validation

III

Value-sense

Probative-project

Effective

Why does the solution exist? Whom does it serve? Does it upset the balance?

Law, economics, technology, team, resources, risks, metrics and feasibility.

Actual pilot effect, repeatability, stability and scalability.

Meaning

Evidence

Result

13 Valuation bases

Meaning

Use

Person

Society

Nature

Fairness

Cooperation

Creation

Responsibility

Transparency

Resilience

Development

Harmony

The bases set a value and system framework. Each of them is checked in all 20 directions.

20 Verification Directions

Goal

Economy

Issue addressed

Technology

User

Management

Beneficiary

Communication

Resources

Scaling

Risks

Partners

Effect

Financing

Metrics

Social result

Ethics

Environmental result

Right

Long-term heritage

Matrix 13 × 20

260 cells show not only the total score, but also the exact zones of strength and failure.

0–3 points

Proof

Expert's comment

corrective action

Evaluation scale and tolerance levels

Does not match

No evidence / criterion violated

Requires revision

There are partial grounds

Conforms

Criterion confirmed

Strength Side

High evidence and quality

0–260

261–520

521–650

651–730

731–780

Not ready

Refinement

Pilot

Strong project

Reference level

Stop factors: the score does not cancel the ban

Illegality of the key mechanism

Unacceptable risk to life, health or safety

STOP

STOP

Falsification of data or origin of assets

Absence of owner liability

STOP

STOP

Significant environmental damage without recovery

Unresolved conflict of interest

STOP

STOP

Inability to confirm the origin of evidence

Economy by transferring damage to third parties

STOP

STOP

Rule SC42: the presence of at least one confirmed stop factor blocks a positive conclusion until the cause is eliminated.

Hierarchy of evidence

Primary Confirmations

measurements, registers, contracts, journals

Independent verification

laboratory, audit, certification

Confirmed Pilot

Operational Statistics and Monitoring

Comparable cases

Similar solutions in comparable conditions

Expert opinion

methodology, assumptions, qualifications

Declaration of the applicant

Basic information, not enough by itself

Validation procedure SC42

Registration

Prescreening

Documents

Experts

Risk Committee

Pilot

Verification

Decision

Register

Revalidation

Location of the map in the system architecture

SFERA

ECO-PPA

SPECZASHCHITA

EQUILIBRIUM

Selection of initiatives

Evidence of environmental projects

Admission of performers and technologies

unified register and monitoring of the result

SC42 - single access gateway

Initiative → check → evidence → solution → Pilot → Confirmed result → Scaling

When is an object considered valid?

TOTAL STANDARD

No critical stop factors

Sufficient score for admission level

Key evidence confirmed

There is a liability owner

The result or correct plan of the pilot is shown

Validity and revalidation

SC42

From idea to proven result