Excerpt from the document “Industrial and environmental projects of SPECZASHCHITA” dated 26 October 2026.
The new profiles are based on information provided by Sergey Leonidovich Sokolov on 26 October 2026. All amounts, capacities, payback periods and market estimates below are reported parameters. No technical, financial or legal review has been conducted. Financing and the participation of the named companies have not been confirmed.
Working code SZ-IND-20261026-04
Investment: 150–200 million USD. Payback period: 1.5–2 years. The reported estimate of reserves at the current rate is 10 billion USD; the date and pricing basis are not specified. The initiator proposes a scenario of up to 100 billion USD if the copper is converted into fine-particle products with a purity of 99.9999%.
To be clarified: the exact site and licence, confirmed reserves for each metal, process recovery rates and product composition. The wording “high-frequency indicators 99.9999” needs clarification; here it has provisionally been interpreted as purity. Multiplying the reserve valuation by 10 is the initiator’s hypothesis and requires calculations of yield, costs, price and product sales volume.
The status of the current entries is: included for project development.
Thematic links
EQUILIBRIUM: raw material and production balance. ORION: geological materials.
The topics indicate areas for preparing materials under the plan dated 26 October 2026.
Source materials
Originals and versions of the document
- industrial-ecological-projects-20261026.docxDOCX · main document




