All 19 directions and 25 programmes in the current public register: their purpose, stated status and cited grounds for decisions. Library resources on targeted programmes are also included; each document’s status is preserved.

Materials: 48 · with full text: 46 · Build Date: 2026-09-29

The web text is saved from the public version of the site. For materials in PDF without a text web version and documents on request, separate cards are provided. All versions of the originals are listed in the material.

Download the package as a PDF

Target programs · Card · document on request

Materials of the target program "Cosy House"

Source status: Project

An affordable accommodation programme for members: goals, mechanism and participation procedure.

Source: https://speczashchita.com/documents

Only a catalogue card is published in the library. The full document is available on request; its contents are not included in this compilation.

Open on the site

Target programs · Full published text

PEOPLE'S SELF-DEVELOPMENT PROGRAMME

Source status: Project

The self-development program is a draft policy document on tasks and the procedure for participation.

Source: https://speczashchita.com/library/narodnaya-programma-samorazvitiya-1.html

Open on the site

PEOPLE ' S PROGRAMSAMORATION12/20/60

«QUANTUM HARMONY in AGREEMENTALALLY"

FENIX (Finnst) is an ancient Russian symbol of immortality and rebirth, the renewal of man, nature and Russia. As an element of Slavic mythology, it is a bird with feathers of fiery red and gold colors, symbolizing the rising Sun-Yarylo. In the Russian legends, the Finist-Clear Falcon is an eternally young and victorious warrior bird, defender of Rus, justice, covenants and traditions of the Ancestors of Rus, Messenger of the Gods of Heaven Rus

"FENIX"

PEOPLE'S SELF-DEVELOPMENT PROGRAMME12/20/60

People's 12-th summer recovery program

20-th summer program of creation

60-th summer program of transformation

Basis for the development of the program

  • First side of the medal
  • The second side of the medal
  • Third Party Medal (Border)

Objective of the programme

In an economic sense:

BB in financial terms:

In a social sense:

Mr. In a scientific and technological sense:

D. In a worldview sense

Infrastructure Project for the Capture of the Future "Russian Map",

First:Transport Project Initiative:

Second: Energy Project Initiative

Third: Information Project Initiative

Fourth: Infrastructure Project Initiative

Fifth: Space Project Initiative 1961-2021-2061(60 Gagarin Flight)

Road map of the program "FENIX"

12 - You are the summer program of the Jupiter Cycle

20 - you summer development programJupiter-Saturn

Road map of the program "FENIX" Jupiter Cycle

20 - you the Jupiter - Saturn Summer Development Program

Objective of the programme

On the basis of knowledge of the Laws of Quantum Harmony of the Universal Order in a coherent universe and knowledge of the cyclic nature and laws of all historical processes, as well as the exact reference system in cyclic coordinates, our national place and role in this planetaryly significant moment of history. It is correct to make a retrospective reassessment of the entire multifaceted national historical experience, for a nationwide understanding of their future, using the wave laws of Skypolitics that are accessible to understanding. Apply common sense in assessing the current world situation and the opportunities that open up, at this point in history, in order to restore, in a manner appropriate to the spirit of the times, sustainable State and Cooperative management of social development processes in the national economic activity, aimed at guaranteeing prosperity and growth in the number of up to 300 million people of the entire people for the next 200 years. To approve and provide a national new social cultural and ideological contour of the GOLDEN AGE, in the center of which is MAN and his SPACE DESIGN IN THE UNIVERSE.

A. In an economic sense:

1.Returning the legal field, from killing the people, to the sphere of market management of economic activity in the country, to the sphere of people's management of economic activity, all life-supporting infrastructure: energy; communication; transport; supplying and providing; housing and production funds; raw materials and land resources; not material and scientific assets.

2.To carry out a deep total modernization of all aspects of life-supporting and industrially reproducing processes on the basis of the world's best samples and technological solutions, using the entire range of closing technologies and emerging technologies of the 6nd technological order.

3.To create a stable, reliable and flexible system of production-consumer and national-economic relations ensuring long-term national prosperity and national development for the next 100 years.

B. Financially:

1.Conditions for the legal and factual return to popular control of historically related national monetary and debt financial assets from the World Financial System.

2.Personally condition and return to the financial circulation of the actually stolen money since the beginning of the administrative chaos of the period of collapse of USSR, perestroika and the period of privatization plundering of the country.

3.On the actual national material basis, create the basis and generation of a new financial asset for the world and national economy, for the long-term, reliable and sustainable functioning of the national three contour financial system.

In a social sense:

Through stabilization and orderly interaction of the main spheres of life support and national life, as well as, relying on the worldview, a conscious picture of the real world, based on national values, the correct education of the younger generation, adequate education of the younger generation and the all-encompassing system of adult vocational training, dynamically meeting the requirements for the current changes in the functioning of the entire state system, to create a stable, guaranteeing all-round security and reliability 150 years.

In a scientific and technological sense:

During our Soviet past, in the scientific and technical thought of the Soviet people’s genius, amazing effects were discovered in a number of physical technological processes, on the basis of which unique technological and production chains and techniques were developed that allow, in many cases, to completely change the industrial technological structure of the national economy and the everyday way of life resulting from this, approaching the ideological national goal of that historical period. Thus, a technologically historical foundation was created for the transition of all mankind to a new technological order corresponding to the coming noospheric New Era in the historical development of mankind, the evidential symbol of which was the year 1961, the time of humanity’s exit into Space.

2025 gives us the opportunity, when expressing our universal national intention, to return to our own lost national heritage, and on its basis, having considered the regular trajectory of PLANETARY history, to step forward, continuing my glorious messianic path, into my own shining national future, taking me in. Having provided the foundation on its own territory, applying in its new national technological structure the national economic and industrial activities of the whole range of Closing Technologies, in the national infrastructure project "RUSSIAN MAP".


D. In a world-view sense:


National Infrastructure Project for the Capture of the Future

"Russian Map",

consists of: 5 National Project Initiatives

First: Transport Project Initiative:

As a result of the initiative, the whole country will receive an ultra-high-tech high-speed transcontinental transport system to provide transportation services, people, goods and money within 5-12 years.

Second: Energy Project Initiative

As a result of the implementation of the initiative, the whole country will receive full excess energy coverage throughout the private and industrial sectors within 3-7 years with the same cost and excess resource generation for sale.

Third: Information Project Initiative

As a result of the implementation of the initiative, Sran will receive the world’s leading infrastructure of functioning cyberspace for managing the digital national and global economy within 1-3 years.

Fourth: Infrastructure Project Initiative

As a result of the implementation of the initiative, the housing issue for all categories of citizens in all regions can be fully resolved within 3-12 years.

Fifth: Space Project Initiative 1961-2021-2061

As a result of the implementation of the initiative, Russia will organize, lead and implement the World Space Program for 2-20 years, which will determine the cosmic future of mankind for the next 2000 years.

First: Transport Project Initiative:

  • 2- the level, the underground cargo; - is a tunnel similar to the underground infrastructure, like the spine hidden in the body, consisting of a set of channels - trunks, along which a platform with reverse polarity moves in a statically stationary spiral magnetic field, it turns out as if the effect of suction by the discharge tunnel, in the form of a platform with a 40 Foot Container (20 tone, with speed 1500 km per hour. This means that the cargo coming from Japan to Europe and entered the system in Vladivostok passing underground 11 500 kilometers, through 12 The clock is in the center of Europe. For reference: now on the water 36 days, by the rain. 16 days, to what extent %? reduced time of transportation? - WHERE IS TIME-MONEY, compressing at the expense of speed commodity time.

Structure of 20 trunks in a harness under the control of the Central Operating System will automatically be able to provide acceptance / dispatch of the platform, its movement with cargo and cargo handling (20 Tons of each 10 seconds from each gun.

Mathematics - Nothing personal, 20x20x10 seconds = 400 The tone in 10 sec. x 6 = 2400 Ton Minute, 144 000 tone per hour, 24 Hours – 3 456 000 tons x 365 days =1 261 440 000 tons per year, at cost 1000 $ the National Park 1 ton at route length 12 000 km and 16 days on the continent. Total, in proportions 1 261 440 000 tons x 1000$ = 1 261 440 000 000$ in a year, or 7 568 640 000 000 Direct revenue from exploitation. Timing of the initiative 12 years, when reaching the design capacity payback 1 year.

The proposed system will provide Russia with an undeniable leadership for the next 120 years in the infrastructure of rapid delivery of cargo in the global logistics system and will create, at least for two centuries, a stable source of constant replenishment of the national heritage, the "common treasury", at the expense of the cost of transportation, in which the share of profits through the ownership of "Transport Bonds" will be relied on by each resident of the country. The system is an Intelligent Automated Transcontinental Transport Complex with a length of 12 000 km.

  • 3-the level, the upper passenger; -is an openwork load-bearing structure located above modern railway tracks, to maintain a bidirectional monorail providing a magnetic suspension of the transported means - platform, relying on an overconducting electromagnetic environment. Construction of engineering structures is made and made of wood CLT panels, the whole structure is based on a distributed screw pile field. The speed of movement of the modular platform through the magnet will be 470-520 km per hour, which will allow the user of the system to cross over the entire surface of our country 12 000 km. from 24 hours of travel, enjoying its Russian Land all possible species, to be at the other end of the continental plate, which as a result of use will lead to a colossal spatial compression of social time. Now the land route takes 7 The system is designed to operate in a fully automatic intelligently controlled mode of sending and moving bidirectional passengers (to the 6 modules from endpoints of the path, each 5 minutes. Mathematics: 72 per hour x 24 Hours = 1728 per day x 365 days = 630 720 man. X 2 (two ends) = 1 261 440 One person per year can maintain the system. At the planned cost of using the system in 100 $, Turnover per year will be 126 144 000$, - (7 568 640 000 Rs., considering the possibility of increasing 5 speed and capacity of the system, which is 630 720 000$ - or 6 307 200 passengers per year. And that’s just in one direction. To cover the entire area, as shown in the figure above, you need to build about 100 000 kilometers of such a highway, at a cost of one kilometer of magnetic wire 8 million.$. The functioning of the system will automatically lead to an increase in non-breakable infrastructure connectivity in the country, and to an increase in the number of 7 the Social Speed of Man Flow and 10 times the passenger flow density per unit time. Build for yourself and for yourself 12 This system can be used for the next few years 200 years to become the main global point of financial settlements for the movement of passengers, goods and services between global markets.
  • 4-th levelAirless network unmanned cargo-passenger; - is a public-cooperative inter-municipal four-circuit intelligent unmanned passenger and cargo air transport system.

1. the contour is ground; each municipality of our country, and their 26 000, places on its territory the central municipal passenger reception, transfer, parking and repair charging unit (gateway) for the elements of the system, in a common calculated graphic grid to cover the territory of the system operating radius

2. air transport contour; consists of a basic set of Intelligent Unmanned Electric Flying Platforms operating in a given digital coordinate system, for safe, fast and comfortable carrying passengers in the most individualized conditions, 2-x, 4-x and 6- those local salons, to any given point in the system's space of operation with a range of transport by air 300-500 km, with speed 200-250 km.h.

and cargo-carrying purposes 200 kg.to 2 with similar speed and vector range depending on the size of the charging grid cells.

3. contour control; static spatial digital model of the territory above or within which the system operates, dynamic mathematical spatial model of the territory is carried out and maintained by the computational GRID network, this is the digital space and environment for the operation of the unmanned system, an integral part of which are data networks.

4. outline core; System Artificial Intelligence under the control of which are all the processes of unmanned movement occurring in the system of digital coordinates of the entire network, carrying out 24 hours a day in any part of our country, the function of providing the possibility of transportation by a call by phone request from any point to any point, while always and at any time the price for transportation will be 1Kilomile. – 1 Ruble in all areas of coverage.

5. SKIF Satellite Group (243 Satellites for global unmanned systems management.

x

Thus:

The Transport Project Initiative offers; during 12 years to create 3-x level National Intelligent Unified Digital Transcontinental Transport System, which will be able to carry out for residents the reach of any point of our country for 24 hours, from threshold to threshold.

Thus, the compressed social and personal time released may allow a different mass look at the implementation of the program of urban settlement and settlement under the national program of the Far Eastern hectare and the Arctic hectare. We win 250 years, remaining an absolute logistics leader, for a quiet, measured creative life of our God-preserved homeland with constant income from guaranteed uninterrupted high-speed transportation of goods, money and services, in the modern paradigm of economic relations.

Second: Energy Project Initiative

The initiative provides for the implementation of the management role and the guarantee of the function of the Civilization Crossing (Russian Map, film 3) in the circulation of the global commodity and raw materials and information and financial flow, the deployment of the network framework of digital distributed generating infrastructure with total combined capacity 300 GW., with open, with further development, the technical possibility of increasing the total generated capacity to 2,5 TWh (total power generation capacity worldwide 4,5 TWt, c 2025 The year will increase to 6 The technological basis of network generation is modular solar-wind-hydro-gas-small nuclear generating complexes with unit capacity 1-2-5-10 Mgw. Placed in a sequence for full coverage of the territory by the network, within the framework of the development program according to the optimal mathematical model. Distributed generation supplies electricity to the backbone system for transportation and sale to the end user, both domestically and externally.

The ecological infrastructure proposed by the project would, through technology and at almost no cost, provide hundreds of millions of people throughout the remote territories of Siberia and the Far East with a renewable, unlimited fuel and energy base. This would support communities living comfortably, permanently or on a rotational basis, with a high quality of life, in any chosen conditions and at any distance from existing centres, in the most beautiful parts of our country. The fuel resources are the Sun, wind, moving water, snow and ice.

Also, the infrastructure will provide social multi-disciplinary employment:

- in the production and industrial process of servicing the system of electricity generation for the supply of its volumes to consumers in the national network and through the existing national network to Europe according to the planned network infrastructure creation using new technologies of electricity transportation, for the transportation of electricity to China;

- in the field of scientific research on the study and application of regional features in the national economy;

- in the production of high-tech area, using in production processes the latest achievements of high technology, in the exploration of fossils, mining, processing and processing of any material, before obtaining a market semi-finished product or finished product with high added value directly in the cluster.

Thus, from the implementation of two project initiatives, we will get 100 years ahead, a comfortable spatial springboard for the development of domestic national human resources provided with accessibility and energy.

At the same time, the creation of new environments will inevitably cause a dialogue between representatives of different civilizations on the principles of the spiritual organization of life. The process of mastering living space inevitably involves the organization and connection of three different shells or environments: the biosphere (spheres of life), the noosphere (spheres of reason and intelligent life, according to Vernadsky) and the pneumatosphere (or spheres of spirit, according to Florensky). Moreover, if humanity went from the transformation of the naturally formed biosphere into the noosphere and the pneumatosphere, spiritualizing and bringing elements of the mind into the natural environment of life, then the present stage of life development suggests that a person based on reason and spirit can artificially form life systems, forming their special spatial-environmental cluster configurations.

  • Ready-made Local autonomous fuel transport solutions


Third: Information Project Initiative

The National Information Project Initiative provides for:

1. Implementation of the project to lay the main electric power and communication fiber optic cable, with a length of 11 700 km., from (St. Petersburg-Helsinki) to Hokkaido (Japan), along the route of the Northern Sea Route. For locking into a global ring, through the national segment, a transcontinental cable communication system, which will eliminate the problem of delay of the passing signal in 31 sec.

Fiber optic cables cover the bottom of all oceans and large seas, even in Lake Ontario in the summer of 2019 earned the American-Canadian communication channel Crosslake Fiber. The only region not yet affected by broadband networks is the Arctic Ocean. There is only one cable laid 15 years ago from Norway to Spitsbergen.
At the same time, the Arctic is the shortest water route from Europe to Asia and further to North America - and these are the three main telecommunications hubs in the world. A hundred years ago, the development of the Northern Sea Route almost halved the distance for the transportation of goods between Northern Europe and the Far East. Now information, digital data is the same product, and the faster and more convenient it moves, the lower the costs and higher the profit.

Level 0

is associated with the physical environment - the signal transmitter and is not actually included in this scheme, but is very useful for understanding. This honorary level represents the intermediaries connecting the end devices: cables, radio lines, etc. Cables there are a great many different types and types: shielded and unshielded twisted pairs, coaxial, based on optical fibers, etc. Since this level is not included in the scheme, it does not describe anything, only indicates the environment.

Level 1

- Physically. Includes physical aspects of binary communication. Describes in detail, for example, voltage, frequency, nature of the transmitting medium. This level is charged with the responsibility of maintaining communication and receiving-transmitting the bit stream. Infallibility is desirable, but not required.

Level 2

- canal. Data connection. Provides error-free transmission of data blocks (called frames) through the layer 1, which may distort the data during transmission. This level should determine the beginning and end of the frame in the bit stream, form from the data transmitted by the physical layer, frames or sequences, include a procedure for checking for errors and correcting them. This layer (and only it) operates with elements such as bit sequences, coding methods, markers. It is responsible for the correct transmission of data (packages) on the sections between the directly related elements of the network. Provides access control to the transmission environment. Due to its complexity, the channel level is divided into two sub-levels: MAC (Medium Access Control (MAC LLC (Logical Link Control (LCR) is the control of logical communication. Level MAC controls network access (with token transmission in Token Ring networks or conflict recognition (clash of transmissions) in Ethernet networks) and network management. Level LLC, Operating above the level MAC, and there is actually the level that sends and receives messages with data.

Level 3

- networked. This layer uses the capabilities provided by the 2 layer to provide communication between two points on the network. Any, not necessarily related. This layer carries messages over a network that can have many lines of communication, or over multiple collaborative networks that require routing, i.e. determining the path through which data should be sent. Routing is done at the same level. Performs address processing, as well as demultiplexing.

The main function of the software at this level is to select information from the source, convert it to packets and correctly transfer it to the destination.

There are two fundamentally different ways of working at the network level. The first is the virtual channel method. It consists in the fact that the communication channel is established at the call (the beginning of the session), information is transmitted through it, and at the end of the transmission the channel is closed (destructed). The packets are transmitted with the original sequence, even if the packets are sent along different physical routes, i.e. the virtual channel is dynamically redirected. In this case, data packets do not include the address of the destination, because it is determined during the establishment of communication.

The second is the datagram method. Datagrams are independent, they include all the information necessary for their shipment. While the first method provides the next level (level 4) with a reliable data transmission channel that is free from distortions (errors) and correctly delivers packets to the destination, the second method requires the next level to work on errors and verify delivery to the desired destination.

On the Internet, this level is supported by the IP protocol.

Level 4

- transport. Regulates the transmission of message packets between processes running on network computers. Completes the organization of data transfer: controls on a cross-cutting basis the flow of data passing along the route determined by the third level: the correctness of the transfer of data blocks, the correctness of delivery to the desired destination, their completeness, safety, order of following. Collects information from the blocks in its former form. Or it operates with datagrams, i.e. it waits for a response-confirmation of reception from the destination, checks the correctness of delivery and addressing, repeats the datagram’s parcel if the response did not come. Within the framework of the transport protocol, there are five classes of transport quality and appropriate management procedures. The same level should include a well-developed and reliable addressing scheme to provide communication across multiple networks and gateways. In other words, the task of this level is to bring to mind the transfer of information from any point to any in the entire network. The transport layer hides from all higher levels any details and problems of data transmission, provides standard interaction of the level lying above it with the reception-transfer of information regardless of the specific technical implementation of this transmission.

On the Internet, this layer is supported by the protocol TCP.

Level 5

- séance. Coordinates the interaction of the communicating users: establishes their connection, operates with it, restores the emergency sessions. The same level is responsible for network mapping - it converts regional (domain) computer names into numeric addresses, and vice versa. It coordinates not computers and devices, but processes in the network, supports their interaction - manages communication sessions between application-level processes.

Level 6

- level of data presentation. This level deals with the syntax and semantics of the transmitted information, i.e., it establishes the mutual understanding of the two communicating computers as to how they represent and understand the transmitted information upon receipt. Here, for example, such tasks as transcoding text information and images, compression and decompression, support for network file systems (NFS), abstract data structures, etc. are solved.

Level 7

- applied. It provides an interface between the user and the network, makes all kinds of services available to a person. At this level, at least five application services are implemented: file transfer, remote terminal access, electronic message transfer, directory service, and network management. In a particular implementation, it is determined by the user (programmer) according to his immediate needs and capabilities of his wallet, intellect and imagination. It deals, for example, with a variety of different terminal type protocols, of which there are more than a hundred.

2. Creation within three to five years (2020-2025g.) of the National Computing Platform on the basis of GRID network built into the fabric of the state communication infrastructure of electronic government in the segment of digital economy management. The project SKIF-GRID system covering the whole country includes:

  • 26 000 municipal nodes of supercomputer servers;
  • 128 nuclear architecture of the network base computing node;
  • 47 000 terminal points for wireless access zones;
  • 87 000 fixed points of direct video exchange;
  • Network Channel Binding Points at speed 1Ggb/sec, 5G
  • Installation capacity of the transmission channel 1 TB;
  • Basic network performance500 T.Flop, peak 1 P.Flop
  • Memory capacity, base 10 million. TB;

National "Cloud" GRID – The network at the heart of the infrastructure is intended to be a tool to ensure the fundamental constitutional right to digital equality for the population in the possibility of obtaining all types of information services and modern cloud services throughout the country 24 hours per day.

According to computational parameters, the network will exceed the combined computing power of American supercomputers that operate the global Internet, thus, the National Network will be able to provide and guarantee a secure Digital National Sovereignty in the global cyberspace, including, acting as a national defense cyber security system.

According to the project, in 5 years, it is planned to upgrade the system, switch to a neuroflon computer and change the computing core to a photonic processor, after which the operating parameters of the system can be upgraded to a degree.

The implementation of the Russian innovations in the field of IT-technologies, based on the global infrastructure of the Internet, can lead to the creation of the World Digital Cyberspace, operating meta-system mathematical models that are able to accommodate and operate to change the current 3 dimensional reality in the online feedback mode. The creation of a networked Mega supercomputer will make Russia a leader in the development, creation and maintenance of a global digital interface to the cloud infrastructure of cyberspace. The Mega network supercomputer is able to operate (operationally manage) the full digital model of the country, the entire global infrastructure in an interactive mode, providing customers with all types of digital services and Cyber-Space capabilities throughout the planet. The functional working environment of the space is carried out by a cluster mega-supercomputer. Access to the cyber environment is carried out through public sphere gateways or through individual network VIP-terminals of virtual presence. The implementation of projects in cyberspace will allow to obtain a real mathematical 4D model of the solar system as a whole, 4D model of the Earth and all major planetary processes, 4D model of Russia, all infrastructure, model of regional development plans, etc.

Fourth: Infrastructure Project Initiative

The initiative involves the creation of a network of infrastructure, evenly distributed across the country, from 1000 New cities with population up to 25 000 in large nodes of the main stream and network intersection, and 10 000 cluster noosphere settlements with population up to 3-5 thousands of people as network maintenance and support infrastructure. Examples of territorial solutions of the Venera project

The implementation of the project during 5-7 will involve in active employment up to 35 000 000 jobs at the stage of construction of the network and high-tech highway, in the subsequent maintenance, operation and management of the entire second level system.

The project implementation process will have a macro-stimulating effect on all regions of the country, and on the development of national basic industries.

The use of a combination of only two technologies in the field of production of new building materials and their application will allow for 10 years to completely rebuild the entire housing stock in the country, and the constructive execution of new cities of these materials will be the pinnacle of architectural biosphere aesthetics.

The first technology is the production and use of hyper-pressed bricks and structural building elements. The construction of 300 plants in former growth points, now monotowns, completely, i.e. forever, will close the question of the need for always equally cheap and high-quality building material for the population and the construction industry.

The second technology is the production of CLT panels and products from them. Full production can be deployed at a regular sawmill site.


Fifth Strategic Space Initiative2011 -2061

Anniversary Edition 2020 the National Strategic Space Initiative (2011 – 2061 It organically continues the traditions of the Russian school of comic thinking and technological approach, reflected in the documents of the Soviet Space Initiative (1946-1964 Inevitable development of the planned development of near space for industrial, pragmatic and scientific purposes. The cycle of activities for the coordination of a single space program within the Space Initiative 2011 Year includes levels: Noospheric, Planetary, International,National, Corporate.

The concept of the national space initiative 2011-2061 was developed by the ETR-United Technologies Group in cooperation with specialists from the leading enterprises of the space industry. RSC Energia, TsNIIMASH, Institute of Space Research, with the participation of the intergovernmental commission of the state Duma on space on the eve of the 50 anniversary of Gagarin's flight.

Project objectives (initiatives)

Introduction

For many ages, peoples and cultures have had the earth, the sky and the stars, now the heavens have opened before humanity, in the form of a mesmerizing pulsating universe in a majestic infinite grandeur with an infinite number of systems, billion galaxies, hyperclusters in megastructures, pulsars, quasars, black holes, plasma flows, all kinds of radiation and an immeasurable number of planets.

Goal: Restoring the final consolidation of the historically legal status of Russia as a concept-technological legislator and planetary leader in creating technical opportunities to unite the efforts of all nations in solving the problem of large-scale development of the treasures of the Solar System.

Plan-line development and development is technologically possible using already operated space systems using chemical processes of hot oxidation to obtain traction when moving in space, with all types of associated restrictions on the continuous duration of flights in space.

Result of the project (initiatives)

Strategically breakthrough development in the creation of a large-scale space infrastructure for space exploration, possibly based on knowledge of the electromagnetic and electrical nature of all macro-processes within a single whole, the Solar System.

Based on the conclusions of the formulated heper-spatial physics of cosmic processes and a fundamentally different, torsion-technological scheme of movement, between celestial bodies using the transformation and transformation into a directed force of the basic energy that carries out the rotation of the planet, the rotation of the Solar system, and the rotation of the galaxy, in the Big Space.

Space propulsion systems of the new generation will allow humanity in the next 25-50 years to begin the integrated development of the planets of the solar system and their satellites using research telemetry robotic intelligent complexes.

The creation of the "Stratospheric electromagnetic launch complex" which will allow to deliver to orbit from 100 to 500 tons of payload every day, 365 days of the year. During 10 years in orbit can be raised 365 000 Tons to 2 000 000 tons of structures for the construction of orbital complexes and fleets of interplanetary cities - stations designed for continuous stay in space 3-5 000 during the cycle of circumnavigation of the Solar System, in order to study the environmental conditions on planetary bodies in order to create technological capabilities of expeditionary and long-term visits to all celestial bodies within the Solar System.

Thanks to a fleet of 20-30 units, in the interplanetary environment of the solar system on a universal measuring instrument the size of the solar system can carry out their research, scientific and production activities in space up to 500 000 people at the same time, and to visit space swimming as a tourist several million.

Key elements of the expanded National Strategic Space Initiative 2011-2061 are:

  • Approved Strategic Initiative Action Plan
  • highly effective existing and emerging technological systems, such as Sea Launch, ISS, Glonass; Vostochny spaceport.
  • designed and developed space complexes, such as: "Air Launch", "International Orbital Technological Research Institute" (IOTI), Orbital Automated Industrial Production Platform (OAPPP), space transport system for near-space exploration consisting of four levels, orbital near-Earth, orbital near-moon, intermediate at the point of libration between the orbits of the Earth and the moon.
  • A support network of educational high-tech universal demonstration complexes for the purpose of popularization, education, education, training and comprehensive preparation of young people for interested participation in state and international space activities.

According to the stages of implementation of the general program, on the visible side of the Earth satellite, to carry out the planned construction of network swarms of robots, full-fledged under the surface engineering and transport infrastructure. The technological system should provide the possibility of a permanent, safe, comfortable stay on the moon tens of thousands of people, with various production, scientific and research missions and provide a regular scheduled visit to the satellite by tourist groups. On the surface of the moon, the construction of a spaceport for reception, circulating space transport along the route of the Earth's orbit - the Moon - the Earth's orbit;

construction under the surface of the technological complex of cargo locks for mooring, parking and maintenance of ships intended for tourist and cargo use in near space, as well as systems and mechanisms for receiving, processing and storing materials and equipment elements delivered from Earth;

construction of a network of radial stations-settlements connected by tunnel arteries infrastructure designed for permanent residence of tourist groups or service personnel under the lunar surface;

- at different depths inside the satellite body:

constructing an interconnected system of cavities in the ground and deep within the rock of an inactive celestial body, to house storage and generating equipment for various purposes;

construction of the main element of the Lunar transport and instrument-scientific system, engineering construction of tunnel type with a length of 3 500 km, passing through the body of the satellite. The system is designed for permanent operation, protected by high-speed transport backbone, delivering personnel, equipment, materials, assembled components and structural parts, for large-scale construction of a base for the permanent stay of mankind on the far side of the Moon;

- on the far side of the satellite:

construction of a large spaceport complex - Space Earth Representation, with locks and hangars in the mine exit area, with all associated engineering technical infrastructure to ensure the process of final assembly, testing and commissioning of the Starfleet of large spacecraft, automatic systems and space stations;

construction of a scientific measuring system of the Space Mission with an area of a measuring mirror equal to the size of the Moon's disk, for close study of local, galactic and deep layers of the Universe, creation on the basis of such an instrument of a system of distant galactic communication and a system of control of all space within the Solar System.

Project duration: 60 years

Project implementation targets: Technological goal, as a result, to create, for future epochs, on the Earth satellite, the Moon, the technological fundamental basis of the multilayered autonomous infrastructure of the Great Space Portal for the Cosmic Future of Human Civilization.

  • In the field of global energy supply of the economy and life processes of the population of the BRICS countries and the whole planet, for the next 20 000

Construction and operation of production equipment systems under the control of artificial intelligence and robotic surface of the moon. Extraction and processing of local material explored by lunar expeditions into necessary finished products such as; liquefied oxygen, hydrogen, iron, titanium and packaged for delivery to the Earth isotope Helium 3, fuel for thermonuclear power plants. The explored reserves of which, according to the results of the research missions carried out by the USSR on the Moon, are more than 1 billion tons, which is guaranteed to provide an increasing need for energy for all mankind, for tens of thousands of years.

Project implementation period: 3-5 years for the preparation and implementation of the mission of the lunar rover group, by the number of countries participating in the program. For pre-intelligence of selected localizations and engineering markings of planned construction, industrial territories, under the control of artificial intelligence. With the actual availability of already developed and tested prototypes of machines, landing modules and delivery ships, as well as remote control systems, 7-10 years for the development and delivery of the first industrial equipment for the further process of large-scale development of the Lunar platform.

Project implementation targets: with technological steps in 7, 12, 20 and 30 years, to deploy on the moon, the infrastructure of a multifunctional industrial complex forever providing planetary civilization with an external platform for space activities.

SINOPSIS of the projectLunaBalt:

When it finally came to us, with what grace, perseverance, perseverance and determination, our ancestors conducted this operation, then we have to admit that we can forgive all the mistakes made, the price for which they were paid, is explored and confirmed by two robots1 and the moon-2, energy reserves of the future of mankind in the aggregate 26 000 years.

Robots have done everything 11 Months on the Moon, Moon rovers controlled1 and the moon-2 From the ground, each of them drilled around 500 wells, to the depth of 2,5 meters, shot thousands of panoramas and examined tens of hundreds of kilometers2. After the Lunokhods were out of action, they remained on the Moon and, first, are visible from Earth, to become only with the help of our Lunokhods, or rather with the help of their corner antenna reflectors, it was finally possible to establish the exact distance to the Moon, well, and most importantly, are physical evidence to the world community, Russia's claims to leadership in this project.

So why LunaBALT, and all just the first Russian car was RUSOBALT and our country this year celebrates its centenary, therefore, the first space vehicle (CTS), it may well be LunaBALT, if we honestly come up with it, we call it! But in general, LunaBalt is not only a CCC, it is also a system for their design and construction, construction, service (in unearthly conditions) and modernization, but also the organization of races and all that part of this industry. Let these races will first take place in cyberspace, especially since everything is filmed, can easily be digitized and turned into a 3D model of the Moon, but in the future the races will turn into real space auto shows, where there are no leaders and no one even has any claims to this leadership, except for Russia of course.

Mining and processing regolith, transporting Helium-3 into orbit and to Earth, assembling lunar stations, building a ship for the “Space Odyssey”—all that comes later. For now, there is racing on the Moon: first on an exact digital replica, and then, once you have practised and proved that you can be a LunaBALT pilot, a real race. Just show me a boy who would not want a ride on another planet, even if he starts in a simulator seat. Then we will see; perhaps there will be a place for that boy in the “Space Odyssey” too.

RUSSOBALT

PR

LUNA-BALT

IPO "BRICS"

IPO"USA"-IPO"RUSSIA"-IPO"EUROPE"

IPO"OIC"-

IR

Project:

Luna BALT:

Energy part of the "Space Odyssey".

Our fathers and grandfathers, who brilliantly conducted this operation .... Dedicated.

The goal of the project: Creation of Mega Holding uniting several industries, such as IT, engineering companies, 3D- studio design, rocket companies, construction firms, auto giants, scientific centers of the world, etc.

Due to the fact that modern humanity can go and has already gone into some kind of collapse, chaos and as a result began to destroy itself. Let’s not dwell on the reasons that led to this, let’s just try to think about the DESTRUCTION of human civilization.

The center of initialization and the control center of "Lunnaya" part of the project is proposed to make Bauman University, as a place from where it came, aviation, nuclear (peaceful and military) energy, astronautics and many other industries.

Economic indicators: Helium-3 contained in the regolith, which covers the lunar surface with a layer of thickness 5-15 According to the latest estimates, it contains about billion tons of thermonuclear fuel, one kilogram of helium-3, The energy indicators are equal 33 000 Translate this, until the untouchable stock in dollars, as the hand does not rise, may be tempted, someone, even the moon to privatize and tax, on any action with it.

For reference, on Earth, in scattered state, in all forms, is 4 000t Helium-3

The project itself is divided into several stages, the first and most important stage, a cyber system should be built, the control and visualization of mathematical fields in the virtual space. Such a system will be arranged as a GRID, in each cluster it will rely on a personal Super computer and can support any remote operator with mathematical support.

The next stage will be the construction of several autonomous transport robots (Lunokhod3,-4,-5 and so on), throwing them on the moon, repairing and modernizing the lunar rover-1 and the moon-2, full exploration and preparation of both LunaBALTA racing tracks, and preparation of places for the meeting of ore mining robots, organization of lunar stations, Helium logistics stations, etc.

-Next, it is planned to build a transshipment base in the orbit of the Moon, with the simultaneous uploading of dozens of Harvester Robots to the Moon, capable of immediately turning rigolite into helium-3 cylinders, without any additional alterations.

-Well, in conclusion of the project on the moon will have to modularly assemble a spacecraft to start "Space Odyssey" (see the project "Space Odyssey")

IR-Service: The priority task of specialists in working with investments of the LunaBALT project will be to obtain IPO The project, especially since there will be assets in the security 33 000 000 000 000000 oil, fully confirmed by space exploration robots1 and the moon-2, Belonging USSR.

PR-Service: It is engaged in the popularization of the Space Odyssey and LunaBALTA, the organization at the beginning of virtual, and subsequently real lunar auto racing, forms a new branch of engineering - space automotive industry, car tuning, modernization, etc.

Target programs · Card · document on request

Regulations on the target consumer program

Source status: current

Rules of the mutual support programme: participants, registration, contributions and transaction procedures.

Source: https://speczashchita.com/documents

Only a catalogue card is published in the library. The full document is available on request; its contents are not included in this compilation.

Open on the site

Target programs · Full published text

Title page of the target program (sample)

Source Status: Sample

The title page of the target program shows how program documents are drawn up.

Source: https://speczashchita.com/library/titulnyi-list-programmy-kooperativa-4.html

Open on the site

THE DEVELOPMENT PLAN 1 year, 2,5 years, 4 years, 7 years, 12 years, 14 years, 20 years, 36 years, 60 years, 84 years, 144 years.

20252037 20492061 207320852097 21992211 2223 22352247 2259

Directions · Full published text

01 · Living environment

Source status: Public direction

Comprehensive development of an accessible and environmentally safe living environment: housing, mutual support services and shared infrastructure for cooperative members.

Source: https://speczashchita.com/directions?n=1#direction-detail

Open on the site

Full Task

Integrated development of affordable and environmentally safe living environments

Direction content

Comprehensive development of an accessible and environmentally safe living environment: housing, mutual support services and shared infrastructure for cooperative members.

National project — reference point

Infrastructure for Life

Programs in this area

  • Sphere — Approved by the Council
  • Mutual support — Initiative in development
  • Cozy house — Initiative in development
  • PLOYADKA — Initiative in development
  • KUPOL — Initiative in development

Directions · Full published text

02 · Clean energy

Source status: Public direction

Development of distributed energy and local generation: modular solutions, energy efficiency and verifiable characteristics of energy facilities.

Source: https://speczashchita.com/directions?n=2#direction-detail

Open on the site

Full Task

Development of distributed energy systems and local generation

Direction content

Development of distributed energy and local generation: modular solutions, energy efficiency and verifiable characteristics of energy facilities.

National project — reference point

New nuclear and energy technologies

ECO-PPA Modules

  • EN

Programs in this area

  • KEU-60 — Initiative in elaboration

Directions · Full published text

03 · Food systems

Source status: Public direction

Sustainable agriculture, biofarms and food security: closed production cycles, raw material processing and food production.

Source: https://speczashchita.com/directions?n=3#direction-detail

Open on the site

Full Task

Sustainable agriculture, biofarms and food security

Direction content

Sustainable agriculture, biofarms and food security: closed production cycles, raw material processing and food production.

National project — reference point

Technological Support for Food Security

ECO-PPA Modules

  • WW
  • CE
  • AG

Programs in this area

  • Full cycle farm "BioFarm Plus" — Approved by the Council
  • Deep processing of grain: Mountain Altai — Draft provision

Directions · Full published text

04 · Clean water

Source status: Public direction

Water management and water systems development: access to water, treatment, reuse and loss reduction.

Source: https://speczashchita.com/directions?n=4#direction-detail

Open on the site

Full Task

Water resource management and water supply system development

Direction content

Water management and water systems development: access to water, treatment, reuse and loss reduction.

National project — reference point

Environmental Well-being

Programs in this area

There are no programs in the registry yet.

Directions · Full published text

05 · Health and longevity

Source status: Public direction

Health, rehabilitation and active longevity: medical and social solutions, rehabilitation centers and drug development.

Source: https://speczashchita.com/directions?n=5#direction-detail

Open on the site

Full Task

Health, rehabilitation and active longevity

Direction content

Health, rehabilitation and active longevity: medical and social solutions, rehabilitation centers and drug development.

National project — reference point

A Long and Active Life

ECO-PPA Modules

  • AG

Service contours

  • S

Programs in this area

  • Medical Substances — Approved by the Council
  • Rehabilitation and rehabilitation of participants of the SVO — Draft regulations

Directions · Full published text

06 · Environmentally friendly materials

Source status: Public direction

Development and application of environmentally friendly materials: research, testing, rights to results and industrial development of materials.

Source: https://speczashchita.com/directions?n=6#direction-detail

Open on the site

Full Task

Development and use of environmentally safe materials

Direction content

Development and application of environmentally friendly materials: research, testing, rights to results and industrial development of materials.

National project — reference point

New Materials and Chemistry

ECO-PPA Modules

  • CE

Programs in this area

  • Vologda OSP Plant — Approved by the Council
  • Materials — Draft provision

Directions · Full published text

07 · Circular economy

Source status: Public direction

Waste management, recycling and resource reuse: from safe handling of industrial waste to returning raw materials to the production cycle.

Source: https://speczashchita.com/directions?n=7#direction-detail

Open on the site

Full Task

Waste management, recycling and resource reuse

Direction content

Waste management, recycling and resource reuse: from safe handling of industrial waste to returning raw materials to the production cycle.

National project — reference point

Environmental Well-being

ECO-PPA Modules

  • CE
  • ER

Programs in this area

  • Industrial waste disposal — Approved by the Council

Directions · Full published text

08 · Critical materials

Source status: Public direction

Processing lithium and other critical materials: technologies for extracting useful components from natural and industrial raw materials.

Source: https://speczashchita.com/directions?n=8#direction-detail

Open on the site

Full Task

Recycling lithium and other critical materials

Direction content

Processing lithium and other critical materials: technologies for extracting useful components from natural and industrial raw materials.

National project — reference point

New Materials and Chemistry

ECO-PPA Modules

  • CE
  • LR

Programs in this area

  • EcoMining (IEMP) — Initiative in development

Directions · Full published text

09 · Land restoration

Source status: Public direction

Land restoration, reclamation and stabilization of soils: return of disturbed territories to safe and economically viable circulation.

Source: https://speczashchita.com/directions?n=9#direction-detail

Open on the site

Full Task

Land restoration, remediation and soil stabilization

Direction content

Land restoration, reclamation and stabilization of soils: return of disturbed territories to safe and economically viable circulation.

National project — reference point

Environmental Well-being

Programs in this area

There are no programs in the registry yet.

Directions · Full published text

10 · Forests and biodiversity

Source status: Public direction

Conservation of forests, biodiversity and natural capital: reforestation, protection of natural areas and support of sustainable ecosystems.

Source: https://speczashchita.com/directions?n=10#direction-detail

Open on the site

Full Task

Conservation of forests, biodiversity and natural capital

Direction content

Conservation of forests, biodiversity and natural capital: reforestation, protection of natural areas and support of sustainable ecosystems.

National project — reference point

Environmental Well-being

Programs in this area

There are no programs in the registry yet.

Directions · Full published text

11 · Aquatic ecosystems

Source status: Public direction

Restoration of rivers, lakes, seas and coastal areas: pollution reduction, restoration of water ecosystems and careful use of water resources.

Source: https://speczashchita.com/directions?n=11#direction-detail

Open on the site

Full Task

Restoration of rivers, lakes, seas and coastal areas

Direction content

Restoration of rivers, lakes, seas and coastal areas: pollution reduction, restoration of water ecosystems and careful use of water resources.

National project — reference point

Environmental Well-being

Programs in this area

There are no programs in the registry yet.

Directions · Full published text

12 · Environmentally friendly transport

Source status: Public direction

Development of an environmentally efficient transport system: shipbuilding, port infrastructure and logistics with measurable resource efficiency.

Source: https://speczashchita.com/directions?n=12#direction-detail

Open on the site

Full Task

Development of an environmentally efficient transport system

Direction content

Development of an environmentally efficient transport system: shipbuilding, port infrastructure and logistics with measurable resource efficiency.

National project — reference point

Industrial provision of transport mobility

ECO-PPA Modules

  • WW

Programs in this area

  • Shipbuilding and port logistics — Approved by the Council
  • OCEAN-80 — Draft Regulation

Directions · Full published text

13 · Clean production

Source status: Public direction

Ecological modernization and automation of production: biotechnological and chemical production, resource efficiency and industrial implementation of developments.

Source: https://speczashchita.com/directions?n=13#direction-detail

Open on the site

Full Task

Environmental modernization and automation of manufacturing

Direction content

Ecological modernization and automation of production: biotechnological and chemical production, resource efficiency and industrial implementation of developments.

National project — reference point

Means of Production and Automation; Technological Support for the Bioeconomy

Note to Orientation

a list based on the programs in this area; there is no single reference

ECO-PPA Modules

  • EN
  • CE
  • AG
  • ER

Programs in this area

  • PROMBIT — Approved by the Council
  • Bioprotein production — Draft regulation
  • Smolensk Gas Chemical Complex — Draft Regulation

Directions · Full published text

14 · Green employment

Source status: Public direction

Training and job creation in the environmental economy: training, retraining, mentoring and promoting the employment of participants.

Source: https://speczashchita.com/directions?n=14#direction-detail

Open on the site

Full Task

Workforce development and job creation in the green economy

Direction content

Training and job creation in the environmental economy: training, retraining, mentoring and promoting the employment of participants.

National project — reference point

Workforce

Service contours

  • S

Programs in this area

  • FENIX — Approved by the Council

Directions · Full published text

15 · Environmental education

Source status: Public direction

Education, science and environmental competences development: training programs, research practices and dissemination of knowledge about sustainable development.

Source: https://speczashchita.com/directions?n=15#direction-detail

Open on the site

Full Task

Education, science and environmental skills development

Direction content

Education, science and environmental competences development: training programs, research practices and dissemination of knowledge about sustainable development.

Programs in this area

There are no programs in the registry yet.

Directions · Full published text

16 · Sustainable tourism

Source status: Public direction

Development of ecological tourism and natural areas: tourist infrastructure, natural sites and employment taking into account the load on ecosystems.

Source: https://speczashchita.com/directions?n=16#direction-detail

Open on the site

Full Task

Development of sustainable tourism and natural areas

Direction content

Development of ecological tourism and natural areas: tourist infrastructure, natural sites and employment taking into account the load on ecosystems.

National project — reference point

Tourism and hospitality

ECO-PPA Modules

  • LR

Service contours

  • S

Programs in this area

  • Ark - Approved by the Council

Directions · Full published text

17 · Environmental monitoring

Source status: Public direction

Unified digital system of environmental data and monitoring: collection of indicators, document flow, traceability of decisions and accounting of program results.

Source: https://speczashchita.com/directions?n=17#direction-detail

Open on the site

Full Task

Unified digital system for environmental data and monitoring

Direction content

Unified digital system of environmental data and monitoring: collection of indicators, document flow, traceability of decisions and accounting of program results.

National project — reference point

Data Economy and Digital Transformation of the State

Note to Orientation

a reference for digital infrastructure, not a claim of participation in the national project

Service contours

  • MRV

Programs in this area

  • EQUILIBRIUM — Approved by the Council

Directions · Full published text

18 · Impact assessment

Source status: Public direction

Evaluation, validation and verification of environmental and social outcomes: methodologies, baseline data, calculations and independent verification of reported impacts.

Source: https://speczashchita.com/directions?n=18#direction-detail

Open on the site

Full Task

Assessment, validation and verification of environmental and social outcomes

Direction content

Evaluation, validation and verification of environmental and social outcomes: methodologies, baseline data, calculations and independent verification of reported impacts.

ECO-PPA Modules

  • LR
  • ER

Programs in this area

  • Biocenosis India — Initiative in development

Directions · Full published text

19 · International cooperation

Source status: Public direction

International cooperation and financing of environmental projects: partnerships on technologies, agricultural solutions, personnel and resource attraction.

Source: https://speczashchita.com/directions?n=19#direction-detail

Open on the site

Full Task

International cooperation and financing for environmental projects

Direction content

International cooperation and financing of environmental projects: partnerships on technologies, agricultural solutions, personnel and resource attraction.

National project — reference point

International Cooperation and Export

ECO-PPA Modules

  • WW
  • AG

Service contours

  • S

Programs in this area

  • International agro- and greenhouse complex — Approved by the Council
  • Personnel: India — Initiative in elaboration

Programs · Full published text

PROMBIT

Source status: Approved by the Council

Industrial biotechnology: organizing the development, financing and implementation of biotechnological production and research.

Source: https://speczashchita.com/programs#program-prombit

Open on the site

Purpose

Industrial biotechnology: organizing the development, financing and implementation of biotechnological production and research.

Status

Approved by the Council

The basis

Council minutes No. 13 of 16.07.2026

Modules and service contours

  • AG
  • CE

Area of work

13 · Clean production

Programs · Full published text

Full-Cycle Agrifarm “BioFerma Plus”

Source status: Approved by the Council

An integrated farm with a closed biocenosis: aquaculture, biofilter plants, quail husbandry, and processing of biomass into humic fertilizer.

Source: https://speczashchita.com/programs#program-bioferma-plus

Open on the site

Purpose

An integrated farm with a closed biocenosis: aquaculture, biofilter plants, quail husbandry, and processing of biomass into humic fertilizer.

Status

Approved by the Council

The basis

Council minutes No. 13 of 16.07.2026

Document note

Extends the PROMBIT track; results may be used in the Cooperative's integrated environmental projects by decision of the Council (cl. 1.3 of the Regulations).

Modules and service contours

  • AG
  • CE
  • WW

Area of work

03 · Food systems

Programs · Full published text

Phoenix

Source status: Approved by the Council

A community university: training, retraining and professional development of personnel, and support for the employment of cooperative members.

Source: https://speczashchita.com/programs#program-fenix

Open on the site

Purpose

A community university: training, retraining and professional development of personnel, and support for the employment of cooperative members.

Status

Approved by the Council

The basis

Council minutes No. 6.1.1 of 28.04.2025

Modules and service contours

  • S

Area of work

14 · Green employment

Programs · Full published text

Equilibrium

Source status: Approved by the Council

A cooperative-management IT platform: member accounts, records of share and earmarked contributions, and document workflows for targeted programs.

Source: https://speczashchita.com/programs#program-equilibrium

Open on the site

Purpose

A cooperative-management IT platform: member accounts, records of share and earmarked contributions, and document workflows for targeted programs.

Status

Approved by the Council

The basis

Council minutes No. 6.2 of 05.05.2025

Modules and service contours

  • MRV

Area of work

17 · Environmental monitoring

Programs · Full published text

Sphere

Source status: Approved by the Council

The Sphere digital platform for the media industry: a marketplace with an escrow-based settlement mechanism, a social network, and an advertising platform.

Source: https://speczashchita.com/programs#program-sfera

Open on the site

Purpose

The Sphere digital platform for the media industry: a marketplace with an escrow-based settlement mechanism, a social network, and an advertising platform.

Status

Approved by the Council

The basis

Council minutes No. 8.1 of 01.07.2025

Area of work

01 · Living environment

Programs · Full published text

Industrial Waste Recycling

Source status: Approved by the Council

An industrial-waste recycling facility for hazard classes I–V in the Chelyabinsk Region: consolidating documentation, raising financing, and providing support.

Source: https://speczashchita.com/programs#program-utilizatsiya

Open on the site

Purpose

An industrial-waste recycling facility for hazard classes I–V in the Chelyabinsk Region: consolidating documentation, raising financing, and providing support.

Status

Approved by the Council

The basis

Council minutes No. 9.1 of 11.12.2025

Modules and service contours

  • CE
  • ER

Area of work

07 · Circular economy

Programs · Full published text

Kovcheg

Source status: Approved by the Council

A safari resort in the Moscow Region under the national project “Tourism and the Hospitality Industry”; a demonstration site for the environmental track and biocenosis.

Source: https://speczashchita.com/programs#program-kovcheg

Open on the site

Purpose

A safari resort in the Moscow Region under the national project “Tourism and the Hospitality Industry”; a demonstration site for the environmental track and biocenosis.

Status

Approved by the Council

The basis

Council minutes No. 9.4.1 of 16.01.2026

Modules and service contours

  • LR
  • S

Area of work

16 · Sustainable tourism

Programs · Full published text

Vologda OSB Plant

Source status: Approved by the Council

Organizing financing for OSB board production in the town of Sokol, Vologda Region.

Source: https://speczashchita.com/programs#program-vologodskiy-osp

Open on the site

Purpose

Organizing financing for OSB board production in the town of Sokol, Vologda Region.

Status

Approved by the Council

The basis

Council minutes No. 9.5 of 24.02.2026

Document note

The rights holder's design, permitting and contractual documentation is not included in the Program's assets (cl. 1.2 of the Regulations).

Modules and service contours

  • CE

Area of work

06 · Environmentally friendly materials

Programs · Full published text

Medical Substances

Source status: Approved by the Council

Development, registration, certification and organization of production of pharmaceutical substances and plant-based preparations.

Source: https://speczashchita.com/programs#program-med-substantsii

Open on the site

Purpose

Development, registration, certification and organization of production of pharmaceutical substances and plant-based preparations.

Status

Approved by the Council

The basis

Council minutes No. 14 of 20.07.2026

Modules and service contours

  • AG

Area of work

05 · Health and longevity

Programs · Full published text

International Agro and Greenhouse Complex

Source status: Approved by the Council

Intensive-type greenhouse complexes (the “phytopyramid” technology) and international cooperation on agricultural and personnel matters; in coordination with BioFerma Plus.

Source: https://speczashchita.com/programs#program-agro-teplichny

Open on the site

Purpose

Intensive-type greenhouse complexes (the “phytopyramid” technology) and international cooperation on agricultural and personnel matters; in coordination with BioFerma Plus.

Status

Approved by the Council

The basis

Council minutes No. 14 of 20.07.2026

Modules and service contours

  • AG
  • WW

Area of work

19 · International cooperation

Programs · Full published text

Shipbuilding and Port Logistics

Source status: Approved by the Council

River-sea class vessels, fishing and auxiliary fleets, port and transshipment hubs, export and transit logistics.

Source: https://speczashchita.com/programs#program-sudostroenie

Open on the site

Purpose

River-sea class vessels, fishing and auxiliary fleets, port and transshipment hubs, export and transit logistics.

Status

Approved by the Council

The basis

Council minutes No. 14 of 20.07.2026

Modules and service contours

  • WW

Area of work

12 · Environmentally friendly transport

Programs · Full published text

Rehabilitation and Recovery for Special Military Operation Participants

Status of source: Draft provision

Medical, social and psychological rehabilitation and recovery; the creation and equipping of rehabilitation centers.

Source: https://speczashchita.com/programs#program-svo-reabilitatsiya

Open on the site

Purpose

Medical, social and psychological rehabilitation and recovery; the creation and equipping of rehabilitation centers.

Status

Draft Regulation

Modules and service contours

  • S

Area of work

05 · Health and longevity

Programs · Full published text

Bioprotein Production

Status of source: Draft provision

Industrial production of a high-protein product from natural gas through microbiological conversion, for the feed and food industries.

Source: https://speczashchita.com/programs#program-bioprotein

Open on the site

Purpose

Industrial production of a high-protein product from natural gas through microbiological conversion, for the feed and food industries.

Status

Draft Regulation

Modules and service contours

  • AG
  • CE

Area of work

13 · Clean production

Programs · Full published text

Smolensk Gas Chemical Complex

Status of source: Draft provision

A gas-chemical complex for the deep processing of natural gas and the manufacture of chemical products in the Smolensk Region.

Source: https://speczashchita.com/programs#program-smolensk-ghk

Open on the site

Purpose

A gas-chemical complex for the deep processing of natural gas and the manufacture of chemical products in the Smolensk Region.

Status

Draft Regulation

Modules and service contours

  • EN
  • ER

Area of work

13 · Clean production

Programs · Full published text

Deep Grain Processing: Gorny Altai

Status of source: Draft provision

Production of processed grain products and feed and food ingredients in the Altai Republic.

Source: https://speczashchita.com/programs#program-gorny-altay

Open on the site

Purpose

Production of processed grain products and feed and food ingredients in the Altai Republic.

Status

Draft Regulation

Modules and service contours

  • AG

Area of work

03 · Food systems

Programs · Full published text

Materials Science

Status of source: Draft provision

Development and industrial adoption of new materials and formulations; rights to the results of intellectual activity, research and testing.

Source: https://speczashchita.com/programs#program-materialovedenie

Open on the site

Purpose

Development and industrial adoption of new materials and formulations; rights to the results of intellectual activity, research and testing.

Status

Draft Regulation

Area of work

06 · Environmentally friendly materials

Programs · Full published text

OCEAN-80

Status of source: Draft provision

Shipbuilding, dredging and port infrastructure; launched as a pre-investment review.

Source: https://speczashchita.com/programs#program-okean-80

Open on the site

Purpose

Shipbuilding, dredging and port infrastructure; launched as a pre-investment review.

Status

Draft Regulation

Modules and service contours

  • WW

Area of work

12 · Environmentally friendly transport

Programs · Full published text

Mutual provision

Source status: Initiative in development

A targeted consumer program of mutual provision of goods, works and services; the regulations are being prepared for approval by the Council.

Source: https://speczashchita.com/programs#program-vzaimnoe-obespechenie

Open on the site

Purpose

A targeted consumer program of mutual provision of goods, works and services; the regulations are being prepared for approval by the Council.

Status

Initiative in progress

Area of work

01 · Living environment

Programs · Full published text

Cozy home

Source status: Initiative in development

A network of available accommodation for participants invited for employment.

Source: https://speczashchita.com/programs#program-uyutny-dom

Open on the site

Purpose

A network of available accommodation for participants invited for employment.

Status

Initiative in progress

Area of work

01 · Living environment

Programs · Full published text

KEU-60

Source status: Initiative in development

A modular power unit for distributed generation; materials are undergoing review of title and specifications.

Source: https://speczashchita.com/programs#program-keu-60

Open on the site

Purpose

A modular power unit for distributed generation; materials are undergoing review of title and specifications.

Status

Initiative in progress

Modules and service contours

  • EN

Area of work

02 · Clean energy

Programs · Full published text

EcoMining (IEMP)

Source status: Initiative in development

An international program for the integrated environmental processing of man-made mineral formations with land reclamation; materials are undergoing title review.

Source: https://speczashchita.com/programs#program-ecomining

Open on the site

Purpose

An international program for the integrated environmental processing of man-made mineral formations with land reclamation; materials are undergoing title review.

Status

Initiative in progress

Modules and service contours

  • CE
  • LR

Area of work

08 · Critical materials

Programs · Full published text

Biocenosis India

Source status: Initiative in development

An analytical base on India's carbon footprint and land degradation: four analytical reports based on national registries and IPCC/FAO methodologies.

Source: https://speczashchita.com/programs#program-biotsenoz-india

Open on the site

Purpose

An analytical base on India's carbon footprint and land degradation: four analytical reports based on national registries and IPCC/FAO methodologies.

Status

Initiative in progress

Modules and service contours

  • LR
  • ER

Area of work

18 · Impact assessment

Programs · Full published text

Personnel: India

Source status: Initiative in development

International cooperation on training and recruiting personnel.

Source: https://speczashchita.com/programs#program-kadry-india

Open on the site

Purpose

International cooperation on training and recruiting personnel.

Status

Initiative in progress

Modules and service contours

  • S

Area of work

19 · International cooperation

Programs · Full published text

PLATFORM

Source status: Initiative in development

An electronic trading service with settlements through escrow accounts; launched in 2020.

Source: https://speczashchita.com/programs#program-ploshchadka

Open on the site

Purpose

An electronic trading service with settlements through escrow accounts; launched in 2020.

Status

Initiative in progress

Area of work

01 · Living environment

Programs · Full published text

DOME

Source status: Initiative in development

The “DOME” integrated radar security system; a technical product, with materials undergoing review.

Source: https://speczashchita.com/programs#program-kupol

Open on the site

Purpose

The “DOME” integrated radar security system; a technical product, with materials undergoing review.

Status

Initiative in progress

Area of work

01 · Living environment