Excerpt from the document “Industrial and environmental projects of SPECZASHCHITA” dated 26 October 2026.
The new profiles are based on information provided by Sergey Leonidovich Sokolov on 26 October 2026. All amounts, capacities, payback periods and market estimates below are reported parameters. No technical, financial or legal review has been conducted. Financing and the participation of the named companies have not been confirmed.
Working code SZ-IND-20261026-07
Total investment: 1.5 trillion RUB. The reported payback period is 4 years after commissioning. Processing volumes, the number of sites, the order of commissioning and final products are not specified.
To be clarified: the contents of the completed documentation, technology, list of poultry farms, manure volumes and properties, logistics, sites and permits. A cost estimate by phase, a revenue model, feedstock and offtake contracts, and evidence of the environmental outcome are required.
The status of the current entries is: included for project development.
Thematic links
EQUILIBRIUM: waste and processing results. FENIX: operator training.
The topics indicate areas for preparing materials under the plan dated 26 October 2026.
Source materials
Originals and versions of the document
- industrial-ecological-projects-20261026.docxDOCX · main document




