Slide 1
CITY OF KNOWING
Conceptual image, not master plan.
EQUILIBRIUM
NEW
WORLD CONTRIBUTION
KNOWLEDGE
AND ENERGY
Knowledge gives direction.
Energy provides action.
ARCHIVE
GRID
CITY OF KNOWING
ZE-Module01 • Concept and pilot
05.09.2026 • For Sokolov Sergey Leonidovich
Slide 2
EQUILIBRIUM / PARADIGM CHANGE
Changing the criterion of success
Not more resources in themselves, but a better solution and verifiable benefit.
Project proposal ZE-01 • Version 1.0
02
Number of documents
→
Applied and verified knowledge
Installed capacity
→
Reliable service and reasonable costs
Dispersed projects
→
Linked data, resources and responsibility
One place in the rating
→
Development profile and quality of evidence
Man and the natural environment are the recipients of the result, not the residual article of the project.
Slide 3
EQUILIBRIUM / WORLD CONTEXT
Computing and energy require a common plan
IEA, April 2026: global electricity consumption by data centres.
Source: IEA, Key Questions on Energy and AI, 16.04.2026 [И1]
03
2025
485
TWt·h
Consumption estimates
2030
950
TWt·h
Central projection
→
This is the entire data center sector, not just AI.
The forecast is not the result achieved or the calculation of our pilot.
Output for ZE-01: First a confirmed problem, then a computational power.
Slide 4
EQUILIBRIUM / ARCHITECTURE
The two paths converge in one solution.
Knowledge justifies action. Energy provides the right service.
Project proposal ZE-01 • Version 1.0
04
CONTOUR OF KNOWLEDGE
Archive → Academy → GRID
Source • method • competence
Scenarios and Reproducible Calculation
CONTOUR OF ENERGY
Need → record → supply
Profile • reliability • service
Service and physical resources
SOLUTION → ACTION → NOTE
The measurement of the result and the evidence are returned to the Archives and related balances.
Slide 5
EQUILIBRIUM / HERITAGE ARCHIVE
Archive — current development infrastructure
We preserve not only the result, but also the origin, rights, method and history of application.
Methodological references: PREMIS [И3], W3C PROV-O [И4] • Project ZE-01
05
01
Appointments
Original
and Source
02
Description
Object
and version
03
Verification
Status
and comments
04
Rights
Mode
Access
05
Saving
Copies
and integrity
06
Application
Programme
or solution
100
objects in the pilot collection
10 connections with application
+ Recovery test
Proposed objectives of the pilot. The integrity of the file is not equal to the truth of the content.
Slide 6
EQUILIBRIUM / ACADEMY AND SCIENCE
Knowledge becomes competence and technology
Openness, verification of applicability and rights to result are considered jointly.
Methodological reference: UNESCO, Recommendation on Open Science [І2]
06
Energy literacy
Energy Balance Workshop
and confirmation of the result.
Biocenoses and engineering environment
Field data, microclimate, water
and limited monitoring tasks.
Materials of the New Order
Ceramics and synthetic crystals:
requirement → test → application.
Culture and heritage
Archival collections and history of decisions
in educational and scientific programs.
Scientific result: question, method, data, verification and limit of applicability.
Slide 7
EQUILIBRIUM / COMPUTER GRID
The metacomputer starts with a confirmed task
Distributed computing is a means of work, not a mandatory mega-building.
Project proposal ZE-01 • Version 1.0
07
01
Register and calculation
Archive, passport indicator,
simple model and magazine
Decisions taken.
02
Partner Resources
Allowed Tasks
in the existing sites.
Contract and Repeatability.
03
Specialized Node
New capacity only
After checking the demand,
Full costs and restrictions.
The job has input data, a version of the method, a time frame, quality and resource limit.
Slide 8
EQUILIBRIUM / ENERGY CONTOUR
First the service. Then profile and technology.
The capacity and composition of the equipment is determined by the survey, not by the image of the future.
Project proposal ZE-01 • Version 1.0
08
01
Need
Who gets the service
and when you need it.
02
Criticism
What can not be interrupted
How to safely stop.
03
Measurement
Boundary, instrument, interval,
unit and data quality.
04
Reduction of losses
Service and modes
the same quality of service.
05
Supply
Network, generation and accumulation
by comparison.
06
Operation
Responsible, repair,
Reserve and full costs.
One agreed engineering node is the sufficient scale of the launch prototype.
Slide 9
EQUILIBRIUM / ENERGY BALANCE
One boundary. One period. No double counting.
ILLUSTRATIVE EXAMPLE • Electricity over one day at the common bus, kW·h.
Project proposal ZE-01 • Version 1.0
09
INCOME
COST
Import from the network
630
Local generation
450
Discharge of the storage device
160
Payload
1 000
Battery Charge
200
Exports
20
Network losses
20
1 240
=
1 240
The energy stored did not change over the day. Losses in its cycle: 200 − 160 = 40 kW·h.
This is a demonstration of arithmetic, not the parameters of Safari Park or the scheme of its supply.
Slide 10
EQUILIBRIUM / ECO-PPA AND FUNDS
Binding obligations, sharing treaties
Energy PPA and design frame ECO-PPA are not identical.
Energy Source PPA: World Bank [I6] • Architecture ECO-PPA — project proposal
10
Energy
Volume, profile,
quality, accounting,
price and responsibility.
Knowledge
Materials, licenses,
calculations, training
and acceptance of the result.
Measurement
Base, period,
Modification of conditions
and effect check.
Continuity
Preservation of the Archive,
service,
Output and portability.
Target Knowledge Budget
Energy Sustainability Target Budget
Savings ≠ revenue. A future impact ≠ money already received.
Slide 11
EQUILIBRIUM / 19 RELATED
B01-B19: keep the common language of the project
Energy, knowledge and social effect are related, but do not add up as one quantity.
Basis: the original “New World Order — EQUILIBRIUM” concept, B01–B19
11
B01
Finance
B02
Materials
B03
Energy
B04
Production capacity
B05
Equipment
B06
Workforce
B07
Science
B08
Technology
B09
Infrastructure
B10
Transport
B11
Logistics
B12
Land
B13
Water
B14
Ecology
B15
Carbon
B16
Data
B17
Social impact
B18
Security
B19
Strategic development
Physical flow → B03. Cost → B01. Scientific result → B07. Benefit → B17.
Slide 12
EQUILIBRIUM / THINKING FLOW
Nine registers of one decision
The signal, choice, action and proof are connected by constant identifiers.
Basis: the original EQUILIBRIUM concept, R01–R09 • Application to ZE-01
12
R01
Observations
What's discovered?
R02
Themes
Why is it important?
R03
Classification
What does it relate to?
R04
Scripts
What are the options?
R05
Decisions
Who and what was chosen?
R06
Actions
Who and when performs?
R07
Results
What's changed?
R08
Evidence
What's confirmed?
R09
Connections
What's the connection?
The archive preserves the versions and bases. The accounting team checks the consistency.
Slide 13
EQUILIBRIUM / ORION22:22
Do not mix layers, balances and indicators
Five levels of work: from meaning to memory. Different numbers are different directories.
Project proposal ZE-01 • Version 1.0
13
MEANING
→
KNOWLEDGE
→
DECISION
→
ACTION
→
MEMORY
22
Axis Classification
Description of object and context
19
interconnected balances
Resources and implications
260
indicators in the plan
Not a condition for starting a prototype
12
ZE-01
Application Starter Kit
19 Human Standards and Cultural Outline 20 × 13 retain individual appointments.
Slide 14
EQUILIBRIUM / MULTI-DIME RATINGS
We show the profile, and do not hide the differences on average
We save ten Orion dimensions. The pilot's actual estimates have not yet been calculated.
Basis: ORION profile [П3] • Methodological reference: OECD / EC-JRC [И7]
14
01
Human potential
02
Quality of life
03
Nature and biocenoses
04
Education and science
05
Technology and innovation
06
Culture and heritage
07
Social sustainability
08
Economy
09
Cooperation
10
Long-term sustainability
Next to the assessment
Source
Period and boundary
Physical significance
Data completeness
Limitations
No data is zero. A high score does not negate safety requirements and people’s rights.
Slide 15
EQUILIBRIUM / 12 STARTING INDICATORS
Passport is more important than a beautiful chart
Each indicator has a formula, source, period, owner and verification status.
Project proposal ZE-01 • Version 1.0
15
KNOWLEDGE
ZE-K01
Archive Description
ZE-K02
Re-application
ZE-K03
Verified results
ZE-K04
Skill development
ENERGY
ZE-E01
Interruptions of services
ZE-E02
Energy per unit of service
ZE-E03
Maximum power
ZE-E04
Reduction of consumption
SUSTAINABILITY
ZE-S01
Covering costs
ZE-N01
Water per unit of service
ZE-D01
Data completeness
ZE-C01
Joint tasks
All base values according to the site. The unknown is not replaced by a conditional zero.
Slide 16
EQUILIBRIUM / EFFECT MEASUREMENT
Compare not just "before" and "after", but a comparable base
CONDITIONAL EXAMPLE • One month • Numbers do not apply to Safari Park.
Methodological benchmark of measurement and verification: FEMP M&V Guidelines 5.0 [Y5]
16
Adjusted base
125
MW·h (120 + 5)
After the event
105
MW·h
Decline
16%
20 MWh
At an illustrative 8 rubles/kWh: a 160 000-ruble change in the energy component.
This is not a profit: additional costs and the structure of the account are taken into account separately.
A monthly example cannot be automatically carried forward for a year or used as a promise.
Slide 17
EQUILIBRIUM / SELECTION SCENARIO
First, compare the three options.
The same requirements for service, safety and natural environment.
Project proposal ZE-01 • Version 1.0
17
A
Basic mode
Continuation of work
with necessary
service.
Point of comparison.
B
Accounting and efficiency
Observations, schedules,
elimination of losses
and verifiable changes.
Verified first step.
V
Additional sources
Variant B +
or accumulation,
If it's justified.
Separate justification.
The decision is made at full cost, reliability, limitations and data quality.
Slide 18
EQUILIBRIUM / SAFARI PARK — CITY OF KNOWLEDGE
Natural Core, Academy and Application Node
We check the general model on a limited scale, preserving the natural environment.
Basis: “Safari Park — City of Knowledge”, 05.09.2026 [П2] • Development of module ZE-01
18
The Natural Core
Biocenoses, routes,
Field observations
and family programs.
Academy and Archive
Training workshops,
Research, Heritage
and scientific partners.
Engineering Node
Energy metering,
scenarios and verification
Quality of the required service.
Large city functions - on separately agreed platforms.
The start of the pilot does not require continuous development of the natural core.
Observation → learning → research → decision → measurement → Archive.
Slide 19
EQUILIBRIUM / PILOT PASSPORT ZE-01
90 days: what is proposed to be presented for inspection
The criteria below are project objectives, not achieved results and not industry standards.
Project proposal ZE-01 • Version 1.0
19
100
Descriptive
Archival Objects
30
Consistently
Days of observation
3
Comparable
script
2
conducted
Training programmes
12
Passports
indicators
1
Permitted
the Engineering Unit
Advanced: ≥95% Valid intervals, 10 connection with the application, check recovery.
Slide 20
EQUILIBRIUM / ROAD CARD
From Agreed Borders to Verified Dossier
90 days are counted after the approval of the team, access and budget.
Project proposal ZE-01 • Version 1.0
20
1–15
Boundaries and Responsibility
Select the node.
Checking the rights.
Approve the passport
and a measurement plan.
16–35
Data and programs
Run the account.
Describe the collection.
Approve indicators
and training materials.
36–60
Scenarios and practices
Gather observations.
Compare the options.
Run Programs
and recovery.
61–90
Verification and solution
Repeat the calculations.
Close the comments.
Generate profile
and the next stage.
On day 90: dossier, verification, costs, risks and the decision to continue, refine or stop.
Slide 21
EQUILIBRIUM / MANAGEMENT AND PROTECTION
The person is responsible for the decision. The system maintains its foundations.
The roles and order of verification are fixed before the start of work.
Project proposal ZE-01 • Version 1.0
21
Who is responsible
Customer - purpose and budget
Archive — origin and rights
Operator — operation and data
IAC - methodology and scenarios
Reviewer - independent review
What cannot be compensated
Security breach
Unacceptable impact on nature
Lack of right to use
Data exchange and double counting
Opaque restriction of human rights
Knowledge archive and energy sustainability have separate target budgets.
Slide 22
EQUILIBRIUM / TERRITORIES NETWORKS
We will only replicate the solutions after verification
Compatibility of data and programs does not require the centralization of property.
Project proposal ZE-01 • Version 1.0
22
UZEL
Method
and proof
→
CITY OF KNOWING
Programmes
and related services
→
REGION
Cooperation
and training
→
PARKS OF PEACE
International
Research and Exchange
At each site, the rights, needs, base,
personnel, resources, security and the admissibility of data exchange.
Knowledge makes decisions portable. Energy is the local reliability of services.
Slide 23
EQUILIBRIUM / START SOLUTION
ZE-01 is not a mega-building
The next result of the project is a verified dossier of a limited pilot.
Project proposal ZE-01 • Version 1.0
23
01
Agree
The goal, the border,
participants, access,
responsible and budget.
02
Verify
Archive, measurements,
12 passports, scenarios
and acceptance criteria.
03
Solve
Continue, refine,
Limit or stop
Based on the audit.
KNOWLEDGE → JUSTIFICATION → ENERGY → ACTIVITY → USE
The grounds and the result return to the Archive - the next cycle begins with better knowledge.
Slide 24
EQUILIBRIUM / BASIS AND STATUS
Primary sources and project materials
Verified 05.09.2026. References do not imply approval of the project by the designated organizations.
Concept 1.0 • 24 slides • Main texts and diagrams are editable
24
[I1]
IEA · Key Questions on Energy and AI · 2026
The global context
[I2]
UNESCO · Recommendation on Open Science · 2021
Open Science
[I3]
Library of Congress · PREMIS 3.0
Save Metadata
[I4]
W3C · PROV-O · Recommendation
Origin of data
[I5]
U.S. DOE / FEMP · M&V Guidelines 5.0
Measurement and verification
[I6]
World Bank · Power Purchase Agreements
Instrument
[I7]
OECD / EC-JRC · Composite Indicators · 2008
Methodology of indicators
The project is based on two Word documents and the presentation “New Order — ORION22:22”,
prepared on 05.09.2026. The names of 19 balances and nine registers are preserved.
Fact with source • Project proposal • Conditional example • Result after verification